Shawboro

Named in 2 PJM planning documents for 1 project, from March 4, 2025 to October 8, 2025.

Existingdescribed as
DOMzone
230kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
230kV Line 2021 – EOL Rebuild
DOM-2024-0025 · s3685
Engineering $30.6M 5/30/2025 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 08/31/2025 → 5/30/2025 2025-03-04 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 50
230kV Line 2021 – EOL Rebuild No role wording
2025-03-04 TEAC
Item 12 - Dominion Supplemental Projects p. 7
230kV Line 2021 – EOL Rebuild “Rebuild approximately 10.3 miles of Line 2021 between Shawboro and Elizabeth City”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.