Substation Scout

Devlin

Named in 3 PJM planning documents for 3 projects, from December 3, 2024 to October 8, 2025.

Newdescribed as
DOMzone
230 kVkV as printed
5mentions

Described as new: “new substation (Devlin)” — source, page 2

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Devlin 230kV Delivery – NOVEC
DOM-2023-0013 · s3693.1
Engineering $42.0 M 05/01/2026 111.0 MW 2025-10-08
TEAC
Do No Harm Analysis
DOM-2023-0013-DNH · s3693.2, s3693.3
Conceptual $88.0M 06/15/2029 Not printed 2025-10-08
TEAC
Do No Harm Analysis
DOM-2024-0063-DNH · s3699.3, s3699.4, s3699.5
Conceptual $24.0M 06/01/2029 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DAWKINS BRANCH; DEVLIN; GAINESVILLE; LIBERTY; PEGASUS; RAILROAD; ROLLINS FORD; VINT HILL → DAWKINS BRANCH; DEVLIN; PEGASUS 2024-12-03 2025-10-08
Substations named BRICKYARD; CLIFTON; DEVLIN; GAINESVILLE; NOKESVILLE; RAILROAD; ROLLINS FORD; VINT HILL; WHEELER → DEVLIN; GAINESVILLE; VINT HILL; WHEELER 2025-05-06 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 10
Do No Harm Analysis “Install 230 kV breakers and associated equipment (ie. switches, leads) at both Devlin and Pegasus Substations”
230 kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 2
Devlin 230kV Delivery – NOVEC “new substation (Devlin)”
230 kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 62
Do No Harm Analysis “Install 230 kV GIS breakers and associated equipment (ie. switches, leads) at both Devlin and Vint Hill Substations”
230 kV
2025-05-06 TEAC
Item 09 - DOM Supplemental Projects p. 14
Do No Harm Analysis “breakers and associated equipment (ie. switches, leads) at both Devlin and Vint Hill Substations”
2024-12-03 TEAC
Item 10 - Dominion Supplemental Projects p. 9
Do No Harm Analysis “Install 230 kV breakers and associated equipment (ie. switches, leads) at both Devlin and Pegasus Substations”