Substation Scout

Sowers

Named in 3 PJM planning documents for 1 project, from October 17, 2025 to October 6, 2026.

Existingdescribed as
AEPzone
—kV as printed
3mentions

PJM interconnection queue

A PJM queue substation page has the same name: Sowers (IN) — 3 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Hicksville, OH
AEP-2022-OH028 · s3836.1-3
Engineering $36.008 M 04/26/2029 Not printed 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 33
Hicksville, OH “Update the relay settings on Sowers - Lockwood Rd circuit at Sowers station”
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 33
Hicksville, OH “Update the relay settings on Sowers - Lockwood Rd circuit at Sowers station”
2025-10-17 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 10
Hicksville, OH “Update the relay settings on Sowers - Lockwood Rd circuit at Sowers station”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this