Named in 5 PJM planning documents for 5 projects, from April 1, 2025 to October 6, 2026.

Existingdescribed as
DOMzone
230 kVkV as printed
9mentions

Also printed as: Fredericksburg Sub

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2023-0016 · s3731
Engineering $27 M 05/31/2025 248.0 MW 2026-10-06
TEAC
Lee’s Hill 230kV Delivery - DEV
DOM-2023-0053 · s3732
Not printed $16.0 M 12/15/2025 300 MW 2026-10-06
TEAC
Fredericksburg to Possum Corridor – Add 3rd and 4th 230kV Lines
DOM-2024-0035 · s3701
Conceptual $180.0M 06/01/2029 Not printed 2025-10-08
TEAC
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency
DOM-2024-0051
Engineering $165M 12/31/2030 Not printed 2026-06-02
TEAC
Install 230 kV Conductor on North Anna to Bristers Structures
DOM-2026-0022
Engineering $33.75 M Q4 2030 3000 MW 2026-06-02
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $27.0 M → $450.0M 2025-04-01 2026-06-02
Cost estimate $450.0M → $27 M 2026-06-02 2026-10-06
In-service date 05/31/2025 → 07/01/2029 2025-04-01 2026-06-02
In-service date 07/01/2029 → 05/31/2025 2026-06-02 2026-10-06
Substations named ALLMAN; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; RUTHER GLEN; ST JOHNS → ALLMAN; CHANCELLOR; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG 2025-04-01 2026-06-02
Substations named ALLMAN; CHANCELLOR; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG → ALLMAN; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG 2026-06-02 2026-10-06
Status engineering (Engineering) → unknown (Complete) 2025-04-01 2026-10-06
Cost estimate
prior value printed on the same page
$108M → $165M 2026-06-02 2026-06-02
Cost estimate Transmission: $108M; Substation: $15M → $165M 2025-06-05 2026-06-02
Cost estimate $165M → $185M 2026-06-02 2026-10-06
Status conceptual (Conceptual) → engineering (Engineering) 2025-06-05 2026-06-02
Substations named BRISTERS; ELMONT; FREDERICKSBURG; NORTH ANNA; THORNBURG → BRISTERS; NORTH ANNA; THORNBURG 2026-06-02 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 17
Dominion Transmission Zone: Supplemental Do No Harm Analysis “existing Fredericksburg, Ladysmith, and Possum Point substations”
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 19
Lee’s Hill 230kV Delivery - DEV No role wording
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 12
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency No role wording
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 7
Install 230 kV Conductor on North Anna to Bristers Structures No role wording
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 9
Dominion Transmission Zone: Supplemental Do No Harm Analysis “Upgrade breakers at Fredericksburg from 40 to 63kA”
230 kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 6
Fredericksburg to Possum Corridor – Add 3rd and 4th 230kV Lines “existing Fredericksburg Substation”
2025-06-05 TEAC
Item 08 - DOM Supplemental Projects p. 10
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency No role wording
2025-04-01 TEAC
Item 11 - DOM Supplemental Projects p. 12
Dominion Transmission Zone: Supplemental Do No Harm Analysis “between Summit DP and Fredericksburg Sub”
2025-04-01 TEAC
Item 11 - DOM Supplemental Projects p. 14
Lee’s Hill 230kV Delivery - DEV No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this