Drum Point

Named in 3 PJM planning documents for 1 project, from October 8, 2025 to October 6, 2026.

Existingdescribed as
JCPLzone
—kV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Leisure Valley 230 kV Substation
JCPL-2024-001 · s4012.1
Not printed $50.23 M 06/01/2029 52 MW 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 50
Leisure Valley 230 kV Substation “Adjust line relaying at South Lakewood, Silverton, Drum Point, Cedar Bridge substations”
2026-10-01* SRRTEP Mid-Atlantic
JCPL local plan submission for 2026 RTEP p. 50
Leisure Valley 230 kV Substation “Adjust line relaying at South Lakewood, Silverton, Drum Point, Cedar Bridge substations.”
2025-10-08 TEAC
Item 05 - JCPL Supplemental Projects p. 5
Leisure Valley 230 kV Substation “Adjust line relaying at South Lakewood, Silverton, Drum Point, Cedar Bridge substations.”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.