Named in 2 PJM planning documents for 2 projects, from October 16, 2025 to November 13, 2025.

Existingdescribed as
JCPLzone
34.5kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
E.Flemington 34.5kV CB Replacements H736, YH, Y727, AV, TC, C731, V724, A729
b3987.1
Not printed $3.5M 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
E.Flemington 34.5kV CB Replacements H736, YH, Y727, AV, TC, C731, V724, A729 Not printed $3.5M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 36
E.Flemington 34.5kV CB Replacements H736, YH, Y727, AV, TC, C731, V724, A729 “Replace 8 over duty E.Flemington 34.5kV circuit breakers”
34.5kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 36
E.Flemington 34.5kV CB Replacements H736, YH, Y727, AV, TC, C731, V724, A729 “Replace 8 over duty E.Flemington 34.5kV circuit breakers”
34.5kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.