Colts Neck

Named in 2 PJM planning documents for 2 projects, from October 16, 2025 to November 13, 2025.

Existingdescribed as
JCPLzone
34.5 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Colts Neck 34.5 kV Substation
b4013.1
Not printed $2.69 M 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Colts Neck 34.5 kV Substation Not printed $2.69 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 21
Colts Neck 34.5 kV Substation “Install a 10.8 MVAR capacitor at Colts Neck 34.5 kV Substation”
34.5 kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 21
Colts Neck 34.5 kV Substation “Install a 10.8 MVAR capacitor at Colts Neck 34.5 kV Substation”
34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.