Named in 2 PJM planning documents for 2 projects, from October 16, 2025 to November 13, 2025.

Existingdescribed as
PJM system-widezone
69kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
ODEC Thermal And Voltage Solutions
b4033.8
Not printed $132.01M 12/31/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
ODEC Thermal And Voltage Solutions Not printed $132.01M 12/31/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 6
ODEC Thermal And Voltage Solutions “Replace and add additional capacitor banks at Tasley (b4033.1), Kellam (b4033.3), Cheriton (b4033.4), and Belle Haven (b4033.5) 69kV substations”
69kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 6
ODEC Thermal And Voltage Solutions “Replace and add additional capacitor banks at Tasley, Kellam, Cheriton, and Belle Haven 69kV substations”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.