Lakewood
Named in 4 PJM planning documents for 2 projects, from October 8, 2025 to October 6, 2026.
Also printed as: Lakewood Substation
PJM interconnection queue
A PJM queue substation page has the same name: Lakewood (NJ) — 6 queue requests filed, 4 active.
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Leisure Valley 230 kV Substation JCPL-2024-001 · s4012.1 |
Not printed | $50.23 M | 06/01/2029 | 52 MW | 2026-10-06 TEAC |
| Lakewood, NJ JCPL-2026-026 |
Conceptual | $292.4M | 12/31/2032 | Not printed | 2026-07-07 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 50 |
Leisure Valley 230 kV Substation | “At Lakewood Substation: Replace circuit breakers, switches, surge arresters, line traps and relaying” |
| 2026-10-01* | SRRTEP Mid-Atlantic JCPL local plan submission for 2026 RTEP p. 50 |
Leisure Valley 230 kV Substation | “At Lakewood Substation: Replace circuit breakers, switches, surge arresters, line traps and relaying.” |
| 2026-07-07 | TEAC Item 07 - JCPL Supplemental Projects p. 9 |
Lakewood, NJ | “Lakewood 34.5 kV yard to be rebuilt as a new 115 kV four breaker ring bus.” 34.5 kV |
| 2025-10-08 | TEAC Item 05 - JCPL Supplemental Projects p. 5 |
Leisure Valley 230 kV Substation | “At Lakewood Substation: § Replace circuit breakers, switches, surge arresters, line traps and relaying.” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.