Substation Scout

Remington

Named in 5 PJM planning documents for 4 projects, from February 4, 2025 to October 6, 2026.

Existingdescribed as
DOMzone
—kV as printed
6mentions

Also printed as: Remington Sub

PJM interconnection queue

A PJM queue substation page has the same name: Remington (VA) — 9 queue requests filed, 6 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Helm 230kV Delivery – DEV
DOM-2018-0018 · s1841
Engineering 14M 06/01/2030 3.0 MW 2026-10-06
TEAC
Do No Harm Analysis
DOM-2024-0084-DNH · s3684
Conceptual $140.8M Q2 2028 Not printed 2025-10-08
TEAC
Shaw 230kV Delivery - REC
DOM-2025-0070 · s3988
Conceptual $32M 5/1/2028 300 MW 2026-10-06
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2025-0070-DNH
Conceptual $4M 5/1/2028 Not printed 2026-06-02
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$7.5 → 14.0M 2025-10-08 2025-10-08
Cost estimate
prior value printed on the same page
$7.5 → 14M 2026-10-06 2026-10-06
In-service date 12/30/2030 → 06/01/2030 2025-10-08 2026-10-06
Substations named HELM; LUCKY HILL → GORDONSVILLE; HELM; KYSER; LUCKY HILL; REMINGTON 2025-10-08 2026-10-06
Substations named MCDEVITT; REMINGTON; REMMINGTON; SHAW → SHAW; SHAW DELIVERY POINT 2026-06-02 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 25
Helm 230kV Delivery – DEV No role wording
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 87
Shaw 230kV Delivery - REC No role wording
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 5
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2026-01-06 TEAC
Item 07 - DOM Supplemental Projects p. 15
Shaw 230kV Delivery - REC No role wording
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 49
Do No Harm Analysis No role wording
2025-02-04 TEAC
Item 11 - Dominion Supplemental Projects p. 20
Do No Harm Analysis “Convert lines #2 and #1065 from Remington Sub”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this