Hoytdale

Named in 3 PJM planning documents for 3 projects, from October 17, 2025 to October 6, 2026.

Existingdescribed as
ATSIzone
138 kV, 345 kVkV as printed
3mentions

Also printed as: Hoytdale Substation

PJM interconnection queue

A PJM queue substation page has the same name: Hoytdale (PA) — 2 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Hoytdale 138 kV Breakers “84-B-14, -18, and -22” Replacement
b3985.3
Not printed $2.87M 6/1/2030 Not printed 2025-11-14
SRRTEP Western
Hoytdale 138 kV Breakers “84-B-14, -18, and -22” Replacement Not printed $2.87M 6/1/2030 Not printed 2025-10-17
SRRTEP Western
Chamberlain-Harding 345 kV S-21 line
ATSI-2026-067
Not printed Not printed 11/14/2031 500 MW 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 06 - ATSI Supplemental Projects - Presentation p. 3
Chamberlain-Harding 345 kV S-21 line No role wording
345 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 89
Hoytdale 138 kV Breakers “84-B-14, -18, and -22” Replacement “Replace the 3 overdutied Hoytdale 138 kV circuit breakers “84-B-14, -18, and -22” with 63 kA circuit breakers.”
138 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 84
Hoytdale 138 kV Breakers “84-B-14, -18, and -22” Replacement “Hoytdale 138 kV Breakers “84-B-14, -18, and -22” Replacement”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.