West Ravenna
Named in 2 PJM planning documents for 2 projects, from June 13, 2025 to October 17, 2025.
Not stateddescribed as
ATSIzone
69 kVkV as printed
2mentions
Also printed as: West Ravenna Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Campbellsport – Ravenna No. 2 69 kV Line ATSI-2022-029 |
Conceptual | $6.77M | 5/26/2026 | Not printed | 2025-06-13 SRRTEP Western |
| Ravenna – Streetsboro 69 kV Line ATSI-2025-028 |
Not printed | Not printed | Not printed | Not printed | 2025-10-17 SRRTEP Western |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2025-10-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 6 |
Ravenna – Streetsboro 69 kV Line | No role wording 69 kV |
| 2025-06-13 | SRRTEP Western Item 05 - ATSI Supplemental Projects p. 3 |
Campbellsport – Ravenna No. 2 69 kV Line | No role wording 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.