Substation Scout

Lakeview

Named in 8 PJM planning documents for 8 projects, from November 6, 2024 to July 17, 2026.

Existingdescribed as
ATSIzone
138 kVkV as printed
8mentions

Also printed as: Lakeview Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cluster 2 (ATSI)
b3925.1
Not printed $217.32M 6/1/2029 Not printed 2025-01-07
TEAC
Lakeview-Ottawa 138 kV Line
b3978.1
Not printed $1.41M 6/1/2030 Not printed 2025-11-14
SRRTEP Western
Cluster 2 (ATSI) Not printed $217.32M 6/1/2029 Not printed 2024-12-03
TEAC
Cluster 2 (ATSI) Not printed Not printed Not printed Not printed 2024-11-06
TEAC
Rebuild/Reconductor existing 138 kV lines/Terminal upgrades at 345 kV substations Not printed 265.1 Not printed Not printed 2024-11-19
TEAC
Lakeview-Ottawa 138 kV Line Not printed $1.41M 6/1/2030 Not printed 2025-10-17
SRRTEP Western
Lemoyne Substation Upgrades for MISO Tranche 2.1
ATSI-2025-004
Conceptual $100.86 M 6/1/2032 Not printed 2025-12-08
TEAC
Greenfield Substation
ATSI-2026-047
Not printed Not printed Not printed Not printed 2026-07-17
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $15.6 M → $100.86 M 2025-03-04 2025-12-08
Substations named LAPLAISANCE CREEK; LEMOYNE; MAJESTIC; MAPLE → LEMOYNE 2025-02-04 2025-03-04
Substations named LEMOYNE → GREENFIELD; LAKEVIEW; LEMOYNE; OTTAWA 2025-03-04 2025-12-08
Substations named GREENFIELD; LAKEVIEW; LEMOYNE; OTTAWA → GREENFIELD; LEMOYNE; OTTAWA 2025-12-08 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-07-17 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 6
Greenfield Substation No role wording
138 kV
2025-12-08 TEAC
Item 04 - ATSI Supplemental Projects p. 4
Lemoyne Substation Upgrades for MISO Tranche 2.1 No role wording
138 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 13
Lakeview-Ottawa 138 kV Line “Replace Limiting Terminal Equipment at Lakeview Substation:”
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 7
Lakeview-Ottawa 138 kV Line “Replace Limiting Terminal Equipment at Lakeview Substation:”
138 kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 51
Cluster 2 (ATSI) No role wording
138 kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 72
Cluster 2 (ATSI) No role wording
138 kV
2024-11-19 TEAC
Item 1 - Reliability Analysis Update p. 32
Rebuild/Reconductor existing 138 kV lines/Terminal upgrades at 345 kV substations No role wording
138 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 58
Cluster 2 (ATSI) No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this