Substation Scout

Racefield

Named in 4 PJM planning documents for 2 projects, from June 5, 2025 to October 6, 2026.

Not stateddescribed as
DOMzone
—kV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Supplemental South Fork 230kV Delivery - NOVEC
DOM-2023-0002 · s3722
Engineering $19.0M 09/30/2026 162.0 MW 2025-10-08
TEAC
Do No Harm Analysis
DOM-2023-0002-DNH · s3722.3
Conceptual $20.0 M 12/31/2029 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named AZALEA LANE; BRAMBLETON; LOUDOUN; RACEFIELD; REED FARM SOUTH FORK → AZALEA LANE; BRAMBLETON; LOUDOUN; RACEFIELD; REED FARM SOUTH FORK SUBSTATIONS 2025-09-09 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 104
Do No Harm Analysis No role wording
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 67
Dominion Transmission Zone: Supplemental South Fork 230kV Delivery - NOVEC No role wording
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 9
Do No Harm Analysis No role wording
2025-06-05 TEAC
Item 08 - DOM Supplemental Projects p. 9
Dominion Transmission Zone: Supplemental South Fork 230kV Delivery - NOVEC No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this