Named in 2 PJM planning documents for 1 project, from November 15, 2024 to October 8, 2025.

Existingdescribed as
AEPzone
138 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone M-3 Process Franklin, OH
AEP-2024-OH033 · s3593.1-.3
Conceptual $10.793 M 11/30/2026 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BEXLEY; DREW; ST CLAIR AVE → BEXLEY; DREW; ST CLAIR AVE STATIONS 2025-10-08 Not reported
Substations named BEXLEY; DREW; ST CLAIR; ST CLAIR AVE → BEXLEY; DREW; ST CLAIR AVE 2024-11-15 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2025-10-08 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 14
AEP Transmission Zone M-3 Process Franklin, OH “Remote end work will be performed at Bexley and St. Clair Ave stations”
138 kV
2024-11-15 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 8
AEP Transmission Zone M-3 Process Franklin, OH “Remote end work will be performed at Bexley and St. Clair Ave stations”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.