Named in 2 PJM planning documents for 1 project, from May 6, 2025 to October 8, 2025.

Not stateddescribed as
DOMzone
—kV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2024-0018 · s3673
Engineering $20M Substation, $5M Transmission Line Q4 2027 255.0 MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date Q4 2027 → 12/01/2030 2025-01-07 2025-05-06
In-service date 12/01/2030 → Q4 2027 2025-05-06 2025-10-08
Status engineering (Engineering) → conceptual (Conceptual) 2025-01-07 2025-05-06
Status conceptual (Conceptual) → engineering (Engineering) 2025-05-06 2025-10-08
Substations named CHICKAHOMINY; ELMONT; THICKET; WHITE OAK → BERMUDA HUNDRED; CHICKAHOMINY; DARBYTOWN; ELKO; ELMONT; TECHPARK PLACE; THICKET; WHITE OAK 2025-01-07 2025-05-06

Every mention

DateDocumentProjectWhat the document says about it
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 56
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2025-05-06 TEAC
Item 09 - DOM Supplemental Projects p. 7
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.