South Side Lima

Named in 2 PJM planning documents for 2 projects, from October 17, 2025 to November 14, 2025.

Existingdescribed as
AEPzone
34.5 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
South Side Lima Station 34.5 kV Upgrades
b3961.1
Not printed $0.08M 06/01/2030 Not printed 2025-11-14
SRRTEP Western
South Side Lima Station 34.5 kV Upgrades Not printed $0.08M 06/01/2030 Not printed 2025-10-17
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 53
South Side Lima Station 34.5 kV Upgrades “Replace station terminal equipment: South Side Lima 34.5 kV replace 4/0 AAC, 7-Str.”
34.5 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 47
South Side Lima Station 34.5 kV Upgrades “South Side Lima Station 34.5 kV Upgrades”
34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.