Substation Scout

Metedconk

Named in 2 PJM planning documents for 2 projects, from October 16, 2025 to November 13, 2025.

Existingdescribed as
JCPLzone
34.5 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Metedconk and Vermont Ave 34.5 kV Substations
b4018.5
Not printed Not printed 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Metedconk and Vermont Ave 34.5 kV Substations Not printed $65.74 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 32
Metedconk and Vermont Ave 34.5 kV Substations “Rebuild Metedconk 34.5 kV Substation as a nine-breaker, breaker-and-a-half station”
34.5 kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 32
Metedconk and Vermont Ave 34.5 kV Substations “Rebuild Metedconk 34.5 kV Substation as a nine-breaker”
34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this