Substation Scout

North Philadelphia

Named in 6 PJM planning documents for 3 projects, from November 6, 2024 to October 6, 2026.

Existingdescribed as
PECOzone
230 kV, 230kVkV as printed
6mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PECO Transmission Zone: Baseline
b3907.1
Not printed $43.22 M 6/1/2029 Not printed 2024-12-03
TEAC
PE-2025-005 Engineering $0.6M 5/14/2027 Not printed 2026-10-06
TEAC
PECO Transmission Zone: Baseline
2024-W1-12
Not printed $43.22 M 6/1/2029 Not printed 2024-11-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 5/23/2026 → 5/14/2027 2025-11-04 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PECO Local Plan Submission of Supplemental Projects for 2026 p. 10
PE-2025-005 “North Philadelphia 230kV circuit breaker CB875 is an oil filled breaker installed in 1977”
230kV
2026-10-01* SRRTEP Mid-Atlantic
PECO local plan submission for 2026 RTEP p. 10
PE-2025-005 “North Philadelphia 230kV circuit breaker CB875 is an oil filled breaker installed in 1977”
230kV
2025-11-04 TEAC
Item 09 - PECO Supplemental Projects p. 11
PE-2025-005 “North Philadelphia 230kV circuit breaker CB875 is an oil filled breaker installed in 1977 and is in deteriorating condition”
230kV
2025-10-08 TEAC
Item 10 - PECO Supplemental Projects p. 4
PE-2025-005 “North Philadelphia 230kV circuit breaker CB875 is an oil filled breaker installed in 1977 and is in deteriorating condition”
230kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 45
PECO Transmission Zone: Baseline No role wording
230 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 45
PECO Transmission Zone: Baseline No role wording
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this