Changes in the latest release
The release with data as of October 1, 2026 (ERCOT-October-TPIT-No-Cost-100126.xlsx), compared with the release before it. 115 projects listed for the first time, 118 moved between tabs, 99 status changes, 250 projected in-service dates changed, and 34 no longer listed.
Projects no longer listed are counted, not shown: the current workbook has no row for them. Absence is not a cancellation.
| What changed | Project | Printed values | Substations named |
|---|---|---|---|
| First listed | Add Cochise customer sub. ERCOT project 100408 | on the Current-year planned tab | None named |
| First listed | Monticello Switch - Allen Switch 345 kV Double-Circuit Line Upgrade Monticello Switch - Allen Switch 345 kV Double-Circuit Line ERCOT project 109824 · utility no. M3317 · RPG 25RPG040, 25RPG042 · RTP 2024-E9 | on the Future tab | Monticello Switch, Allen Switch |
| First listed | Install Morton 138/35kV Distribution Substation with double-tap service. Install Morton 138/35kV Distribution Substation with double-tap service. Tap Ckt.09H to create new Ckt.09H Katy to Morton to Franz ERCOT project 110075A | on the Future tab | Morton, Katy, Franz |
| First listed | Install Morton 138/35kV Distribution Substation with double-tap service. Install Morton 138/35kV Distribution Substation with double-tap service. Tap Ckt.09K to create new Ckt.09K Village Creek to Morton to Franz. ERCOT project 110075B | on the Future tab | Morton, Village Creek, Franz |
| First listed | Jewett Switch - Greene Switch 345 kV Double-Circuit Line Establish Jewett Switch - Greene Switch 345 kV Double-Circuit Line ERCOT project 110381 · utility no. M4428 · RPG 25RPG042 · RTP 2024-NC63 | on the Future tab | Greene Switch, Jewett Switch |
| First listed | Add Quantum 345 kV Switch Connect Quantum 345 kV Switch to the existing Longshore - Cattleman Switch 345 kV line, approximately 13 miles Southwest of Colorado City, TX off of CR 365. ERCOT project 110819 | on the Future tab | Quantum, Connect Quantum, Cattleman, Longshore |
| First listed | Cooke County Resiliency Project Construct a new breaker station “Bulcher” near Bulcher, TX Construct a new transmission line from Bulcher to Capps Corner Construct a new transmission line from Bulcher to Sivell’s Bend ERCOT project 110943A · RPG 26RPG007 | on the Future tab | None named |
| First listed | Cooke County Resiliency Project Rebuild the Sivells Bend Tap to Sivell’s bend transmission line ERCOT project 110943B · RPG 26RPG007 | on the Future tab | None named |
| First listed | Cooke County Resiliency Project Rebuild the St Jo to Capps Corner transmission line Rebuild the Capps Corner to Nocona Transmission Line Rebuild the Nocona to Alcorn Transmission Line Construct a new transmission line from Bulcher to Alcorn ERCOT project 110943C · RPG 26RPG007 | on the Future tab | None named |
| First listed | Cooke County Resiliency Project Convert existing 69 kV line from Gainesville to St Jo to 138 kV operation including: Gainesville, (future) Bud Long, (future) Hinton, Red River, (future) Gateway, (future) Army Camp, Sivells Bend, (future) Bulcher, Capps Corner, Nocona, Alcorn and St Jo ERCOT project 110943D · RPG 26RPG007 | on the Future tab | None named |
| First listed | Cooke County Resiliency Project ERCOT project 110943E · RPG 26RPG007 | on the Future tab | Gainesville, Sivells Bend |
| First listed | Install new 138/35 kV Lee Road Distribution Substation. Install Lee Road 138/35kV Distribution Substation. Loop on existing circuit as Ckt.66D Humble to Lee Road to Treaschwig. ERCOT project 111043A | on the Future tab | Lee Road, Humble, Treaschwig |
| First listed | Install new 138/35 kV Lee Road Distribution Substation. Upgrade Ckt.66D Treaschwig to Westfield to increase thermal limits. ERCOT project 111043B | on the Future tab | Treaschwig, Westfield |
| First listed | Cruce: Expand 345 kV Station Interconnect the Duval Data Center load to the Cruce 345 kV station ERCOT project 111116 | on the Future tab | Cruce |
| First listed | LCRATSC Webberville Power Transformer Addition LCRA TSC will improve reliability at the Webberville Substation by installing a second power transformer. New circuit breakers and switches shall meet LCRA TSC minimum 138-kV design standards. ERCOT project 111193 | on the Future tab | Webberville |
| First listed | Stainback 345 kV Capacitor Bank ERCOT project 111207 · utility no. M5017 | on the Future tab | Stainback 345 kV Switch |
| First listed | Tynan: Expand 69 kV Station Interconnect Honeycomb Solar and Storage to the Tynan 69 kV station ERCOT project 111219 · utility no. TP2023005 | on the Current-year planned tab | Tynan |
| First listed | Angstrom: Expand 345 kV Station Interconnect the Ripper Industrial load to the existing Angstrom 345 kV station ERCOT project 111221 · utility no. TP2026123 | on the Future tab | Angstrom |
| First listed | Oncor_MW_62445_BaseCamp(FKA_EglMnt)_138kV_SwitchRebuild Rebuild existing Eagle Mountain 345/138 kV Switch and rename to Base Camp 345/138 kV Switch ERCOT project 111223 · utility no. M5261 · RPG 22RPG039 | on the Current-year planned tab | Base Camp |
| First listed | LCRATSC Crosswinds Goforth Transmission Line Overhaul Perform an overhaul on the 3 mile T661 Crosswinds - Goforth 138kV transmission line. ERCOT project 111240 | on the Future tab | Crosswinds, Goforth |
| First listed | LCRATSC Crosswinds Turnersville Transmission Line Overhaul Perform an overhaul on the 3.8 mile T272 Crosswinds - Turnersville transmission line. ERCOT project 111242 | on the Future tab | Crosswinds, Turnersville |
| First listed | Gillespie - Fredericksburg - Goehmann Lane - Kendall Transmission Line Overhaul ERCOT project 111245A | on the Future tab | Gillespie, Goehmann Lane |
| First listed | Gillespie - Fredericksburg - Goehmann Lane - Kendall Transmission Line Overhaul ERCOT project 111245B | on the Future tab | Goehmann Lane, Kendall |
| First listed | Elmdale: Install capacitor bank Install a new capacitor bank at the Elmdale 69 kV station ERCOT project 111248 · utility no. TP2026164 | on the Future tab | Elmdale |
| First listed | Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150) Loop new Newby (NBY) 345kV CEHE Substation into Ckt.74 to create new Ckt.74 Jewett to Newby to Limestone. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.74 Newby to Limestone. ERCOT project 111258A | on the Future tab | Newby, Jewett, Limestone |
| First listed | Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150) Loop new Newby (NBY) 345kV CEHE Substation into Ckt.98 to create new Ckt.98 Limestone to Newby to Jewett. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.98 Newby to Limestone. ERCOT project 111258B | on the Future tab | Newby, Limestone, Jewett |
| First listed | Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150) Install dual generator leads from Newby (NBY) 345kV CEHE Substation to customer-owned Dewey Prairie - DEWEY_ (DWP) ERCOT project 111258C | on the Future tab | Newby, DEWEY |
| First listed | Fort Stockton Switch: Construct New 138 kV Terminal Construct a new 138 kV terminal at Fort Stockton Switch for the new TNMP line to Woodhouse ERCOT project 111270 · RPG 23RPG023 | on the Future tab | Fort Stockton Switch |
| First listed | Solstice: Construct New 765 kV Station Construct the new Solstice 765 kV station and Install two 765/345 kV autotransformers and two 765 kV shunt reactors ERCOT project 111276 · utility no. TP2024146 · RPG H.B. 5066 | on the Future tab | Solstice |
| First listed | Chappell Hill - Waller Transmission Line Overhaul Perform an overhaul on the 16 mile T232 Chappell Hill - Waller transmission line replacing conductor with single-Suwannee. ERCOT project 111280 · utility no. PLC-8346 | on the Future tab | Chappell Hill, Waller |
| First listed | Hunt - Turtle Creek Transmission Line Storm Hardening LCRA will replace the conductor between Hunt and Turtle Creek as part of an effort to rebuild and storm harden the circuit resulting in greater durability and reliability of assets in the area. ERCOT project 111282 · utility no. PLC-8473 | on the Future tab | Hunt, Turtle Creek |
| First listed | Harligen SW: Expand 138 kV Station Interconnect the Power Proof Properties load to the existing Harligen SW 138 kV station ERCOT project 111302 · utility no. TP2026149 | on the Future tab | Harligen SW |
| First listed | Goddard: Expand 345 kV Station Interconnect Bayou Creek Solar to the existing Goddard 345 kV Statiom ERCOT project 111305 · utility no. TP2026163 | on the Future tab | Goddard |
| First listed | Resnik: Epand 138 kV Station Interconnect Gregory Power Partners (GPP) to the Existing Resnik 138 kV Station ERCOT project 111307 · utility no. TP2026170 | on the Future tab | Resnik |
| First listed | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 111323A · RTP 26RPG006 | on the Future tab | HOPSON, WARVUE |
| First listed | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits. ERCOT project 111323B · RTP 26RPG006 | on the Future tab | DALTON, BRINE |
| First listed | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.03G Lyondell to Channelview (distribution) to Channelview (ring bus) in order to increase thermal limits. ERCOT project 111323C · RTP 26RPG006 | on the Future tab | Lyondell, Channelview |
| First listed | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.08 Hermann to Grant to increase thermal limits. ERCOT project 111323D · RTP 26RPG006 | on the Future tab | Hermann, Grant |
| First listed | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.06L Plaza to Knight to Gulfgate to increase thermal limits. ERCOT project 111323E · RTP 26RPG006 | on the Future tab | Plaza, Gulfgate |
| First listed | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.73B Britmoore to Woodcreek to Memorial to Westheimer in order to increase thermal limits. ERCOT project 111323F · RTP 26RPG006 | on the Future tab | Britmoore, Westheimer |
| First listed | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits. ERCOT project 111323G · RTP 26RPG006 | on the Future tab | PH Robinson, HUNTER |
| First listed | Upgrades related to the Baytown Area Load Addition Install (3) 7.2 MVAR distribution cap banks at Bayway substation. ERCOT project 111323H · RTP 26RPG006 | on the Future tab | Bayway |
| First listed | Upgrades related to the Baytown Area Load Addition Install (1) 60 MVAR cap bank at Mykawa substation. ERCOT project 111323I · RTP 26RPG006 | on the Future tab | Mykawa |
| First listed | Upgrades related to the Baytown Area Load Addition Install (1) 60 MVAR switchable cap bank at Humble substation. ERCOT project 111323J · RTP 26RPG006 | on the Future tab | Humble |
| First listed | Upgrades related to the Baytown Area Load Addition Install (2) 14.4 MVAR distribution cap banks at Treaschwig substation. ERCOT project 111323K · RTP 26RPG006 | on the Future tab | Treaschwig |
| First listed | Jacaranda to Paulownia (Oncor): Construct two new 345 kV lines Construct two new 345 kV lines between Jacaranda and Paulownia (Oncor) ERCOT project 111346 · utility no. TP2026088 | on the Future tab | Jacaranda, Paulownia |
| First listed | Dry Hollow: Construct New Switch Station Interconnect CVEC's Hog Creek substation to the new Dry Hollow 69 kV switch station on the Redbo to Eola Tap 69 kV line ERCOT project 111348 · utility no. TP2026180 | on the Future tab | Dry Hollow |
| First listed | Specter: Construct New Switch Station Interconnect TEC's Rainey substation to the new Specter 138 kV switch station on the Abilene Plant to Putnam 138 kV line ERCOT project 111350 · utility no. TP2026164 | on the Future tab | Specter |
| First listed | Oncor_FW_Ward - Barnsley 69 kV Line Conversion to 138 kV Convert Ward - Barnsley 69 kV Line to 138 kV ERCOT project 111353 · utility no. R8923 | on the Future tab | Ward, Barnsley Sub |
| First listed | LST_OpenSky_Second_Ckt_Loopin Loop 2nd 345 kV circuit into Open Sky Station to support 25INR0473 project ERCOT project 111357 | on the Future tab | Phantom Hill, Claytonville |
| First listed | Add Portsouth loop in Southmost - Waterport ERCOT project 111361 · RPG 25RPG039 | on the Future tab | PORTSOUTH |
| First listed | Install new 138kV transmission loop and substation ERCOT project 111364 | on the Future tab | None named |
| First listed | Hairpin Portsouth HWY511 to Chalybe ERCOT project 111370 · RPG 25RPG039 | on the Future tab | PORTSOUTH |
| First listed | LCRATSC Cedar Hill Power Transformer Addition This project will add a second power transformer (T2) to Cedar Hill substation. ERCOT project 111372 | on the Future tab | Cedar Hill |
| First listed | Gliese: Construct New 138 kV Station Interconnect the Valverde load to the new Gliese 138 kV Station on the Hamilton Road to Picacho 138 kV line ERCOT project 111374 · utility no. TP2026120 | on the Future tab | Gliese |
| First listed | Add Boca Chica and double ckt to portsouth ERCOT project 111376 · RPG 25RPG039 | on the Future tab | Boca Chica, PORTSOUTH |
| First listed | LCRATSC Giddings Winchester Transmission Line Overhaul This project performs an overhaul on the T222 Giddings - Winchester 138-kV transmission line. ERCOT project 111378 | on the Future tab | Giddings, Winchester |
| First listed | Littlestar 138 kV Switch Establish new 138 kV Switch ERCOT project 111417 · utility no. R8978 | on the Future tab | Little Star |
| First listed | Upgrade Driscoll - San Diego Upgrade Driscoll - Central - Ben Bolt - San Diego ERCOT project 111459 | on the Future tab | Driscoll, San Diego |
| First listed | LCRATSC Warda Generator Circuit Breaker Addition This project installs a new 138-kV circuit breaker and associated terminal equipment at the Warda Substation, in a ring bus configuration, to provide a new 138-kV Point of Interconnection to Staccato Storage. ERCOT project 111495 | on the Current-year planned tab | Warda |
| First listed | NBU Comal Substation Breaker and a Half Upgrade In conjunction with LCRA's Breaker and a Half upgrade at Comal Substation, NBU will upgrade the T335 line terminal and three transformer terminals. ERCOT project 111533 | on the Future tab | Comal, Loop 337 |
| First listed | LCRATSC Gillespie Nimitz Storm Hardening LCRA will replace the conductor between Gillespie and Nimitz (T266) as part of an effort to rebuild and harden the circuit resulting in greater durability and reliability of assets in the area. ERCOT project 111604 · utility no. PLC-8473 | on the Future tab | Gillespie, Nimitz |
| First listed | GVEC FM725 Substation Addition GVEC is adding a new 138 kV substation 2.5 Miles Northwest of the McQueeney Substation, cutting into T498, to serve a 40 MVA load added to the area. ERCOT project 111644 | on the Future tab | McQueeney, Schumansville |
| First listed | Sunrise 138 kV Switch Establish Sunrise 138 kV Switch ERCOT project 111702 · utility no. M5018 | on the Future tab | Sunrise Switch |
| First listed | Gossip 345 kV Switch Establish Gossip 345 kV Switch ERCOT project 111724 · utility no. M43505 | on the Future tab | Gossip Switch |
| First listed | Establish Iron Crest 138 kV Switch ERCOT project 111794 · utility no. R6440 | on the Future tab | Iron Crest 138 kV Switch |
| First listed | Establish Massey Lake 138 kV Switch ERCOT project 111796 · utility no. R6400 | on the Current-year planned tab | Massey Lake 138 kV Switch |
| First listed | Establish Wingate 345 kV Switch ERCOT project 111798 · utility no. R6464 | on the Future tab | Wingate 345 kV Switch |
| First listed | Saltdome Capacitor 2nd step addition ERCOT project 111822 | on the Future tab | Saltdome |
| First listed | Establish Caroline Creek 138 kV Switch ERCOT project 111870 · utility no. R6543 | on the Future tab | Caroline Creek 138 kV Switch |
| First listed | Binkley 138 kV Switch ERCOT project 111952 · utility no. M3367 | on the Future tab | Binkley Switch |
| First listed | This is a new planned substation project BPUB has a planned new substation project that will be between our existing Waterport Substation and STEC's Southmost Substation. ERCOT project 111985 | on the Future tab | Waterport, Southmost |
| First listed | Upgrade Batesville - Crystal City SW as part of Crystal City SW to Downie upgrade ERCOT project 112127 | on the Future tab | Batesville, Crystal City SW |
| First listed | Upgrade N.Batesville - S. Batesville - Batesville Sw Upgrade N.Batesville - S. Batesville - Batesville Sw as part of Crystal City SW to Downie rebuild ERCOT project 112129 | on the Future tab | N. Batesville, Batesville |
| First listed | Upgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie Upgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie as part of Crystal City SW to Downie rebuild ERCOT project 112131 | on the Future tab | N. Batesville, Downie |
| First listed | East Watermill - Martin Lake 765 kV Line Establish East Watermill - Martin Lake 765 kV Line ERCOT project 112226 · utility no. M4458 · RPG 25RPG025 | on the Future tab | East Watermill 765 kV Switch, Martin Lake 765 kV Switch |
| First listed | Adds Farias load serving substation ERCOT project 112229 · RPG 25RPG016 | on the Future tab | FARIAS |
| First listed | Model Cowpen 138kV Substation ERCOT project 112234 | on the Future tab | Cowpen |
| First listed | South Watermill - Bell East 765 kV Line Establish South Watermill - Bell East 765 kV Line ERCOT project 112322 · utility no. M4458 · RPG 25RPG025 | on the Future tab | South Watermill, Bell East |
| First listed | South Watermill - Dinosaur 765 kV Line Establish South Watermill - Dinosaur 765 kV Line ERCOT project 112324 · utility no. M4460 · RPG 25RPG025 | on the Future tab | South Watermill, Dinosaur |
| First listed | South Watermill - East Watermill 765 kV Line Establish South Watermill - East Watermill 765 kV Line ERCOT project 112326 · utility no. M4478 · RPG 25RPG025 | on the Future tab | South Watermill, East Watermill |
| First listed | BRYN_Rayburn_Load_Addition Adding second distribution transformer at Rayburn ERCOT project 112454 | on the Future tab | Rayburn |
| First listed | Desoto 345/138 kV Switch Rebuild ERCOT project 112560 · utility no. M4448 · RPG 25RPG004 · RTP 2024-NC80 | on the Future tab | Desoto Switch |
| First listed | Removal of 140MVAr SVC and facilities from Bellaire and Crosby 138kV substations. Remove the 140MVAr SVC and facilities from Bellaire 138kV substation ERCOT project 112585A | on the Future tab | Bellaire |
| First listed | Removal of 140MVAr SVC and facilities from Bellaire and Crosby 138kV substations. Remove the 140MVAr SVC and facilities from Crosby 138kV substation ERCOT project 112585B | on the Future tab | Crosby |
| First listed | Hagansport 138 kV Switch ERCOT project 112656 · utility no. M3333 | on the Future tab | Hagansport Switch |
| First listed | WETT Binturong 345 kV Station for Synchronous Condensers ERCOT project 112684 · RPG 24RPG041 | on the Future tab | Bearkat, Binturong |
| First listed | WETT Buck Canyon 345 kV Station for Synchronous Condensers ERCOT project 112691 · RPG 24RPG041 | on the Future tab | Long Draw, Buck Canyon |
| First listed | WETT Pitchfork 345 kV Station for Synchronous Condensers ERCOT project 112695 · RPG 25RPG005 | on the Future tab | Cottonwood, Pitchfork |
| First listed | Fixes Islanded Pilot Point and energize load. Adding two transmission lines from Pilot Point to Gunter Switch. ERCOT project 113226 | on the Current-year planned tab | Gunter |
| First listed | Oncor_MNW_113229_Cashion_Switch Establish Cashion 345 kV Switch POI for Nymphaea ERCOT project 113229 | on the Future tab | Cashion |
| First listed | Oncor_MW_113288_Halsell_Switch Establish Halsell 345 kV Switch (POI for Possum Kingdom Solar and Storage) ERCOT project 113288 | on the Future tab | Halsell |
| First listed | Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (2) 300 MVAr switchable line reactors and 2-225MVAR bus reactors. Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (1) 300 MVAr switchable line reactors and 2-225MVAR bus reactors. ERCOT project 116019A | on the Future tab | Morley |
| First listed | Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (2) 300 MVAr switchable line reactors and 2-225MVAR bus reactors. Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (1) 300 MVAr switchable line reactors. ERCOT project 116019B | on the Future tab | Martin Lake |
| First listed | Teal 345/138 kV Switch connected to LCRA POI (Limmer) Teal 345 kV Switch, Autotransformers, and 345 kV Tie Lines to Limmer (LCRA) ERCOT project 69552E · utility no. R6165 · RPG 22RPG027 | on the Completed tab | Teal |
| First listed | Create_GP_Solar_POI_Bus Created GP Solar POI bus. ERCOT project 70550 | on the Future tab | Glen Pine, Explorer |
| First listed | Rockhound - Connell 345 kV Double-Circuit Line Rockhound - Sale Ranch 138 kV Double-Circuit Line ERCOT project 73436A · utility no. R8718, R8807 · RPG 24RPG020 | on the Current-year planned tab | Rockhound, Sale Ranch |
| First listed | Rockhound - Connell 345 kV Double-Circuit Line ERCOT project 73436B · utility no. R8718, R8807 · RPG 24RPG020 | on the Future tab | Rockhound, Connell |
| First listed | Silverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG Construct TNMP Silverleaf 345kV-138kV BAAH substation. Install three 750 MVA 345kV-138kV transformers. Cut both Pecos to Cedarvale 138kV lines and Bone Springs Tap 138kV line into Silverleaf 138kV bus. Construct three 345kV tie lines from TNMP Silverleaf 345kV to Oncor Rock Draw 345kV Switching Station (PMCR # 78044). ERCOT project 77807A · RPG 23RPG013 | on the Current-year planned tab | Silverleaf, BAAH, Rock Draw, Pecos, Cedarvale |
| First listed | Silverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG ERCOT project 77807B · RPG 23RPG013 | on the Current-year planned tab | Silverleaf |
| First listed | Mobile substation Project is to add a mobile substation next to Airport Substation tapping into the Transmission line that is Filter Plant to Airport Substation. Then connecting lines South Plant to Southmost by passing Airport Substation. This is due to Airport Substation being decommissioned in April. ERCOT project 81726 | on the Completed tab | 59420 Filter Plant, 59500 South Plant, Mobile substation, 5789 Southmost |
| First listed | PMCR for Adding TNMP Woodhouse New Station ERCOT project 82298A · RPG 23RTP023 | on the Current-year planned tab | Woodhouse |
| First listed | PMCR for Adding TNMP Woodhouse New Station ERCOT project 82298B · RPG 23RTP023 | on the Current-year planned tab | Woodhouse |
| First listed | Adds TNMP White Oak Substation New TNMP White Oak substation. ERCOT project 82851A | on the Future tab | White Oak |
| First listed | Adds TNMP White Oak Substation In-service Whiteoak bus and loads, and match CNP ISD date to interconnect together. ERCOT project 82851B | on the Future tab | White Oak |
| First listed | ALUVIUM gen tie station ERCOT project 90903 | on the Future tab | None named |
| First listed | Establish Drane 345 kV Switch ERCOT project 91457A · utility no. R6410 | on the Current-year planned tab | Drane 345 kV Switch |
| First listed | Establish Drane 345 kV Switch Drane 345 kV Switch Gen Tie ERCOT project 91457B · utility no. R6410 | on the Future tab | Drane 345 kV Switch, Tormes Solar |
| First listed | Establish Tarantula 345 kV Switch ERCOT project 91461A · utility no. R6412 | on the Current-year planned tab | Tarantula 345 kV Switch |
| First listed | Establish Tarantula 345 kV Switch Establish Tarantula 345 kV Switch Gen Tie ERCOT project 91461B · utility no. R6412 | on the Future tab | Tarantula 345 kV Switch, Tehuacana Creek Solar |
| First listed | Whitebaker 345kV - Part of Upgrade L13 2024 Permian Basin Study ERCOT project 92274 · utility no. PBRP Upgrade L13 | on the Future tab | None named |
| First listed | Utley_Substation_and_Transmission_Line_Addition ERCOT project 93250A · utility no. PLC-8065 | on the Future tab | Utley |
| First listed | Utley_Substation_and_Transmission_Line_Addition ERCOT project 93250B · utility no. PLC-8065 | on the Future tab | Utley |
| First listed | Establish Baines Creek 138 kV Switch ERCOT project 99544A · utility no. R6375 | on the Current-year planned tab | Baines Creek 138 kV Switch |
| First listed | Establish Baines Creek 138 kV Switch Baines Creek 138 kV Switch Gen Tie ERCOT project 99544B · utility no. R6375 | on the Current-year planned tab | Baines Creek 138 kV Switch, Bonham Solar I |
| Moved between tabs | Gristmill_Substation_Addition LCRA TSC will construct a new Gristmill Substation to provide transformation service to a PEC-member load ERCOT project 100165 | Future → Cancelled | Gristmill |
| Moved between tabs | LST_SamSwitch_Resiliency_(GTC)_Project This project loops Helix to Navarro Circuit into LST Sam Switch station ERCOT project 102401 · RPG 25RPG031 | Current-year planned → Completed | Helix, Navarro |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 102546A · RTP 24RPG028 | Future → Cancelled | HOPSON, WARVUE |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits. ERCOT project 102546B · RTP 24RPG028 | Future → Cancelled | DALTON, BRINE |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.03G Lyondell to Channelview (distribution) to Channelview (ring bus) in order to increase thermal limits. ERCOT project 102546C · RTP 24RPG028 | Future → Cancelled | Lyondell, Channelview |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.08 Hermann to Grant to increase thermal limits. ERCOT project 102546D · RTP 24RPG028 | Future → Cancelled | Hermann, Grant |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.06L Plaza to Knight to Gulfgate to increase thermal limits. ERCOT project 102546E · RTP 24RPG028 | Future → Cancelled | Plaza, Gulfgate |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.73B Britmoore to Woodcreek to Memorial to Westheimer in order to increase thermal limits. ERCOT project 102546F · RTP 24RPG028 | Future → Cancelled | Britmoore, Westheimer |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits. ERCOT project 102546G · RTP 24RPG028 | Future → Cancelled | PH Robinson, HUNTER |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Install (3) 7.2 MVAR distribution cap banks at Bayway substation. ERCOT project 102546H · RTP 24RPG028 | Future → Cancelled | Bayway |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Install (1) 60 MVAR cap bank at Mykawa substation. ERCOT project 102546I · RTP 24RPG028 | Future → Cancelled | Mykawa |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Install (1) 60 MVAR switchable cap bank at Humble substation. ERCOT project 102546J · RTP 24RPG028 | Future → Cancelled | Humble |
| Moved between tabs | Upgrades related to the Baytown Area Load Addition Install (2) 14.4 MVAR distribution cap banks at Treaschwig substation. ERCOT project 102546K · RTP 24RPG028 | Future → Cancelled | Treaschwig |
| Moved between tabs | BRYN_ShadyLane_Rebuild Rebuild Shady Lane into a ring bus configuration. MAY NEED TO DELETE THIS LATER IF IT CONFLICTS WITH A FUTURE NOMCR OR NMMS TOPOLOGY. ERCOT project 103867 | Current-year planned → Future | Shady Lane |
| Moved between tabs | Establish Pathfinder 345 kV Switch ERCOT project 104658A · utility no. R6364 | Current-year planned → Completed | Pathfinder |
| Moved between tabs | WesternWind_Switch Establish Western Wind Switch to interconnect Adamstown solar ERCOT project 104830 | Future → Current-year planned | Krum West Switch, Riley |
| Moved between tabs | Angstrom: Expand 345 kV Station Interconnect Alila Solar to the Angstrom 345 kV station ERCOT project 109706 · utility no. TP2023019 | Current-year planned → Future | Ansgtrom |
| Moved between tabs | This models the new CEHE Raider Substation and upgrades required for a proposed load addition Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service. ERCOT project 110068A | Current-year planned → Future | Raider, Cedar Creek, Bailey |
| Moved between tabs | Hawkins to Gainesville ERCOT project 1275 | Current-year planned → Completed | Hawkins, Gainesville |
| Moved between tabs | Fincas: Build new 138 kV distribution station Construct new distribution station on the University to Wormser 138 kV line ERCOT project 48774 · utility no. 3765 | Current-year planned → Completed | Fincas |
| Moved between tabs | Mason to North Brady: Rebuild 69 kV line Rehab Mason to North Brady 69 kV line ERCOT project 50900 · utility no. 2794 · RPG 19RPG019 | Current-year planned → Completed | Mason, North Brady |
| Moved between tabs | Upgrade Moore to Hondo Creek 138 kV line Replace the 336 ACSR with 1020 ACCC conductor while keeping the existing structures that still meet our standards. ERCOT project 55873 · RPG 19RPG021 | Current-year planned → Completed | Moore, Hondo Creek |
| Moved between tabs | Matador to Turkey: Rebuild 69 kV Line Rebuild 69 kV line from Matador to Turkey ERCOT project 61552 · utility no. 1873 | Current-year planned → Completed | Matador, Turkey |
| Moved between tabs | Barrilla Junction: 69 kV Loop Rebuild Rebuild Barrilla Junction to Saragosa to Cherry Creek to Verhalen to Hoefs Road stations, convert to 138 kV ERCOT project 64042 · utility no. 1886 · RPG 21RPG023 | Future → Current-year planned | Barrilla Junction, Hoefs Road Station |
| Moved between tabs | Hyde Park to Downtown Ckt.32A Upgrades Upgrade Hyde Park to Downtown Ckt.32A ERCOT project 64499 | Current-year planned → Future | Downtown, Hyde Park |
| Moved between tabs | To add Open Sky Station To interconnect GINR 20INR0241 ERCOT project 65683 | Current-year planned → Completed | Open Sky |
| Moved between tabs | Rebuild/reconductor portions of Ckt.05A Missouri City to Sienna as a Hardening upgrade(24RPG030). Rebuild and reconductor portion of Missouri City to Sienna Ckt.05A as a Hardening upgrade ERCOT project 65719 · RPG 24RPG030 | Current-year planned → Future | Missouri City, Sienna |
| Moved between tabs | Cedar Crest - Dealey - West Levee 138 kV Line Upgrade the existing 138 kV Line ERCOT project 66188 · utility no. M4212 | Current-year planned → Completed | Ceadr Crest, West Levee |
| Moved between tabs | Upgrade Taylor - Holland 69 kV Line Rebuild the Granger - Taylor 69 kV Line ERCOT project 66200D · utility no. R6173 · RPG 22RPG036 | Current-year planned → Completed | Taylor, Holland |
| Moved between tabs | Mesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line Upgrade the Mesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line ERCOT project 66473 · utility no. M4137 | Current-year planned → Completed | Mesquite East, Oates |
| Moved between tabs | San Miguel to Cruce 345 kV lines New San Miguel to Cruce 345 kV double circuit lines ERCOT project 67329 · RPG 21RPG017 | Current-year planned → Future | San Miguel, Cruce |
| Moved between tabs | Dupont to Resnik: Rebuild 138 kV Line Rebuild the Dupont to Resnik 138 kV line ERCOT project 69467 | Current-year planned → Completed | Dupont, Resnik |
| Moved between tabs | Jaguar: Construct New Distribution Station Construct new distribution station on the McGruder to Thomaston 138 kV line ERCOT project 69473 | Current-year planned → Completed | Jaguar |
| Moved between tabs | Camp Elizabeth: Build new 69 kV station Construct new 69 kV box bay station with capacitor bank on the College Hills West to Sterling City 69 kV line ERCOT project 70305 | Current-year planned → Cancelled | Camp Elizabeth |
| Moved between tabs | Rebuild Olivia - Carancahua rebuild Olivia sw to Carancahua 795 ACSR ERCOT project 70882 | Current-year planned → Completed | Olivia SW, Carancahua |
| Moved between tabs | Flomot Tap: Rebuild 69 kV Line Rehab Flomot Tap 69 kV Line ERCOT project 70898 | Current-year planned → Completed | Flomot Tap, Flomot |
| Moved between tabs | Roanoke Area Upgrades Ramhorn Hill – Dunham 345 kV Double-Circuit Line ERCOT project 70900E · utility no. M5281 M5144 M5146 M5148 · RPG 22RPG003 | Current-year planned → Completed | Dunham Switch, Ramhorn Switch |
| Moved between tabs | Dunlavy to HO Clarke Ckt.40A Partial Reconductor Reconductor portions of Ckt.40A Dunlavy to HO Clarke ahead of future 138kV conversions ERCOT project 71106 · RPG 22RPG019 | Current-year planned → Completed | Dunlavy, HO Clarke |
| Moved between tabs | Centerville Switch - Lake Hubbard Switch 138 kV Double-Circuit Line Upgrade the existing 138 kV Double-Circuit Line ERCOT project 71130 · utility no. M4126 | Current-year planned → Completed | Lake Hubbard, Centerville |
| Moved between tabs | Upgrade Pearsall Station Upgrade Pearsall Station equipment for full auto xfmr ratings. (Upgrade station to breaker and a half is complete) ERCOT project 71319 | Current-year planned → Future | Pearsall |
| Moved between tabs | Establish Launch Pad 138 kV Switch ERCOT project 71903 · utility no. R6156 | Current-year planned → Completed | Launch Pad |
| Moved between tabs | Upgrade Hondo Creek to Castroville to 138kV Upgrade Castroville sub to 138kV and line from Hondo creek to Castroville ERCOT project 71935 · RPG 22RPG022 | Current-year planned → Completed | Castroville |
| Moved between tabs | Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Loop new CEHE 138kV substation Ashville (ASH) into Ckt.06F Garden Villas to Holmes to create new Ckt.06 Garden Villas to Ashville to Holmes ERCOT project 72029A | Current-year planned → Cancelled | Ashville, Garden Villas, Holmes |
| Moved between tabs | Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ Solar. Utilize same generator lead as Dori BQ BESS. ERCOT project 72029B | Current-year planned → Cancelled | Ashville, SUNLIT |
| Moved between tabs | Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ BESS. Utilize same generator lead as Dori BQ Solar. ERCOT project 72029C | Current-year planned → Cancelled | Ashville, SUNLIT |
| Moved between tabs | Cedar Valley to Friendship Storm Hardening Rebuild single circuit section of Cedar Valley to Friendship and reconductor with bundled 795 ACSR Conductor, 440 MVA. Replaces Project ID 61268 ERCOT project 72566 | Current-year planned → Completed | Cedar Valley, Friendship |
| Moved between tabs | Trading Post to Cedar Valley Storm Hardening Upgrading switch to bring line to full rating ERCOT project 72588C | Current-year planned → Completed | None named |
| Moved between tabs | PEC_MarshallFord_Paleface_StormHardening Upgrade to terminal equipment and update to final circuit rating. Terminal end equipment update to be completed Fall 2024 based on original project schedule. (Replaces ERCOT Project # 61274C) ERCOT project 72596C | Current-year planned → Completed | Paleface, Marshall Ford |
| Moved between tabs | Bluff Creek: 138 kV Station Work Replace fourteen (14) 138 kV Breakers and one (1) Circuit Switcher ERCOT project 72942 | Current-year planned → Completed | Bluff Creek |
| Moved between tabs | Barrera: Construct New Distribution Station Construct new distribution station on the North Laredo Switch to Reveille 138 kV line ERCOT project 73059 | Current-year planned → Future | Barrera |
| Moved between tabs | Big Foot to Lytle: Convert to 138 kV Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station ERCOT project 73063 · utility no. TP2022155 | Current-year planned → Future | Big Foot, Lytle |
| Moved between tabs | Castroville Cut-in 138 kV Cut the AEP line from Quihi to CPS Castroville into the newly converted to 138 kV STEC Castroville station. ERCOT project 73098 · RPG 22RPG022 | Current-year planned → Future | Quihi, Castroville (CPS) |
| Moved between tabs | This converts Bell County to Gabriel to 138 KV ERCOT project 75524 | Current-year planned → Future | Bell County, Gabriel |
| Moved between tabs | Install new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar Install new 345kV Speedway (SPD) substation for generator interconnection to CRADLE/ Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. ERCOT project 75810A | Future → Cancelled | Speedway, DOW, Oasis |
| Moved between tabs | Install new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar Install generator lead from Speedway (SPD) substation to CRADLE (CDL) customer substation (23INR0150). ERCOT project 75810B | Future → Cancelled | Speedway, CRADLE |
| Moved between tabs | Juncus: Construct New 69 kV Station Interconnect the TEC Snodgrass load to the new Juncus 69 kV station on the Abilene South to Steamboat 69 kV line ERCOT project 76139 · utility no. TP2023074 | Current-year planned → Completed | Juncus |
| Moved between tabs | Lytle: Construct New 138 kV Terminal Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station ERCOT project 76242 · utility no. TP2022155 | Current-year planned → Future | Lytle |
| Moved between tabs | Hecker to Resnik: Rebuild 138 kV Line Rebuild the Hecker to Resnik 138 kV line ERCOT project 76286 · utility no. TP2023506 | Current-year planned → Future | Hecker, Resnik |
| Moved between tabs | Establish Walleye Creek 345/138 kV Switch ERCOT project 76650 · utility no. R6243 · RPG 23RPG030 | Current-year planned → Completed | Walleye Creek |
| Moved between tabs | Line Termination at Cypress Waters Vineyard Switch – Hackberry Switch 138 kV Line Termination at Cypress Waters 138 kV Switch ERCOT project 76652 · utility no. M5344 | Current-year planned → Completed | Cypress Waters |
| Moved between tabs | Ocelot: Construct New 138 kV Station Interconnect the Ocelot load to the new Ocelot 138 kV station on the Military Highway to Palo Alto 138 kV line ERCOT project 76914 | Current-year planned → Future | Ocelot |
| Moved between tabs | Primavera 138 kV: Construct new station New station to serve Tesla load ERCOT project 76918 · utility no. TP2023059 | Current-year planned → Completed | Primavera |
| Moved between tabs | Rebuild Old Lake Sw - Ringgold Magnolia 69 kV line ERCOT project 77174 · utility no. M3508 | Current-year planned → Completed | Old Lake Switch, Ringgold Magnolia |
| Moved between tabs | Wilmer 345/138 kV Switch Establish Wilmer 345/138 kV Switch ERCOT project 78357 · utility no. M4369 M4371 M4372 · RPG 24RPG022 | Current-year planned → Completed | Wilmer |
| Moved between tabs | Gunter 345/138 kV Switch Establish Gunter 345/138 kV Switch ERCOT project 78363 · utility no. M3301 · RPG 24RPG025 | Current-year planned → Completed | Gunter |
| Moved between tabs | Britmoore to Bellaire Ckt.24B Upgrades Upgrade Ckt.24B Hayes to Britmoore to increase thermal limits. ERCOT project 78485F · RPG 23RPG025 | Current-year planned → Completed | Hayes, Britmoore |
| Moved between tabs | Expand HO Clarke substation for Callisto II (22INR0558) ERCOT project 79462 | Current-year planned → Completed | HO Clarke |
| Moved between tabs | Lucero: Construct New 345 kV Station Interconnect SanPat Solar I and SanPat Solar II to the new Lucero 345 kV station on the Angstrom to Naismith 345 kV line ERCOT project 79988 | Current-year planned → Future | Lucero |
| Moved between tabs | Devine: Install Cap Bank Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch ERCOT project 80319 · utility no. TA2018040 · RPG 23RPG024 | Current-year planned → Future | Devine |
| Moved between tabs | Upgrade the Hutto & Round Rock - Salado 138 kV Line Rebuild and double-circuit the Georgetown East - Sonterra 138 kV Line Section ERCOT project 80546C · utility no. R6203, R6202 · RPG 24RPG018, 25RPG006 · RTP 2023-SC17 | Current-year planned → Future | Georgetown East, Sonterra |
| Moved between tabs | Oklaunion: Reconfigure 138 kV Station Reconfigure the Oklaunion 138 kV station from a straight bus to a ring bus ERCOT project 81215 | Current-year planned → Future | Oklaunion |
| Moved between tabs | Ranger Camp – Cattleman 345 kV Double-Circuit Line Construct a new 345 kV double-circuit line from Ranger Camp to Cattleman ERCOT project 81274 · utility no. R8648 · RPG 23RPG029 | Current-year planned → Completed | Ranger Camp, Cattleman |
| Moved between tabs | GSEC_9452_Add_Snodgrass_Sub Adding new Snodgrass sub to connect to AEP's Juncus Station. ERCOT project 81354 | Current-year planned → Completed | Snodgrass, Juncus |
| Moved between tabs | Rio Pecos: Upgrade 138 kV Terminals Upgrade the Soaptree and Whitebaker 138 kV terminals at the Rio Pecos 138 kV station ERCOT project 81368 | Future → Current-year planned | Rio Pecos |
| Moved between tabs | Oncor_FW_81410_Averitt Synchronous Condenser Add Averitt Switch Synchronous Condenser ERCOT project 81410 · utility no. D20231 · RPG 23RPG029 | Future → Current-year planned | Averitt |
| Moved between tabs | GSEC_9466_Add_CampSprings_Sub Add Big Country's Camp Springs Sub 9MW ERCOT project 81544 | Current-year planned → Completed | CampSprings, Big Country's Camp Springs |
| Moved between tabs | Rio Medina substation Adds Rio Medina Load serving station ERCOT project 81590 | Future → Current-year planned | Rio Medina |
| Moved between tabs | Olympus 138 kV Switch Establish POI for Gaia Solar ERCOT project 82810C · utility no. R6330 | Current-year planned → Completed | Olympus, Gaia |
| Moved between tabs | New Furhman Substation Adds New Furhman switching station on Rayburn - Vanderbilt line for generator interconnect ERCOT project 82829 | Current-year planned → Completed | Rayburn, Vanderbilt |
| Moved between tabs | RGEC_Altuda 69-kV In-line_Breaker_Installation Install 69-kV breaker between Alpine Switch and Persimmon Gap substation at Altuda substation. ERCOT project 85965 | Current-year planned → Future | Alpr2A, PrsmnGap2A |
| Moved between tabs | Athena (ATH) 138kV CEHE Station for RAVEN (RVN) / Raven Solar & Storage (24INR0209 & 24INR0210) Install one generator lead from Athena CEHE 138kV substation to RAVEN / Raven Solar & Storage (24INR0209 & 24INR0210). ERCOT project 85970B | Current-year planned → Completed | Athena, RAVEN |
| Moved between tabs | Expand ADLONG substation for XE Murat Storage (24INR0329) Expand facilities at customer-owned ADLONG substation for XE Murat Storage (24INR0329). Utilize existing generator lead Eastgate to XE Murat Solar. ERCOT project 86009 | Current-year planned → Completed | Eastgate, ADLONG |
| Moved between tabs | Snug 138kV Substation expansion for Cottonwood Bayou Storage (21INR0443) Install Cottonwood Bayou Storage (21INR0443) at Snug 138kV substation. Connect at the same generator lead as Cottonwood Bayou Solar. ERCOT project 86011 | Current-year planned → Completed | Snug |
| Moved between tabs | Fairmont Distribution Reconfigurations with 4th Transformer Install fourth Fairmont distribution transformer on Ckt.95F to create new Ckt.95F SOUTH to Fairmont TR4 tap to Clear Lake tap to Polaris tap to Kemah tap to PH Robinson 138kV North. Remove Fairmont TR3 from Ckt.95F and onto the Ckt.35A Fairmont line position. ERCOT project 86013 | Current-year planned → Completed | Fairmont |
| Moved between tabs | Scissortail: Construct New 138 kV Station Interconnect the TNMP Flycatcher station to the new Scissortail 138 kV station on the Saragosa to Solstice 138 kV line between Hoef's Road and Verhalen ERCOT project 86771 | Current-year planned → Future | Scissortail |
| Moved between tabs | Add Dansk load serving substation Cuts in new Dansk load serving station on existing Red Bluff to Danevang transmission line ERCOT project 86782 | Current-year planned → Future | None named |
| Moved between tabs | Buccaneer: Construct New 69 kV Station Interconnect the Oncor Regency station to the new Buccaneer 69 kV station on the Eden to North Brady 69 kV line between Melvin and North Brady ERCOT project 86796 | Current-year planned → Future | Buccaneer |
| Moved between tabs | Primavera: Construct New 138 kV Terminal Interconnect Project Lynx Storage to the Primavera 138 kV station ERCOT project 87031 · utility no. TP2024100 | Current-year planned → Completed | Primavera |
| Moved between tabs | GSEC_Tier4_9468_Add_Bull_Sub New Substation Load out of 68001 Claytonville ERCOT project 87146 | Current-year planned → Completed | Claytonville |
| Moved between tabs | Establish Fallstown Switch – Pleasant Valley/Fisher Road 138 kV Double-Circuit Line and Fallstown Switch – Ceramic/Wichita Falls PPG 138 kV Double-Circuit Line ERCOT project 87413 · utility no. R4024 | Future → Current-year planned | Fallstown Switch, Pleasant Valley, Fisher Road |
| Moved between tabs | Rosita Creek Substation 138-kV T2 Power Transformer Addition. Replacing Committed project 57343 Add second 138/13.09-kV power transformer bay with new 138-kV transmission switch and circuit switcher interconnected at LCRA Switch# 12669. New power transformer capacity will be 15/20/25 MVA. Replaces committed project 57343. ERCOT project 88867 | Current-year planned → Completed | Rosita Creek |
| Moved between tabs | Olmos to Wilson T297 Transmission Line Rebuild Rebuild 7.18 miles of 138 kV from 477 conductor wood pole line to 795 drake conductor concrete/steel transmission line ERCOT project 89912 | Current-year planned → Future | Olmos, Wilson |
| Moved between tabs | Cascabel: Construct New 345 kV Station Interconnect Moccasin Solar to the new Cascabel 345 kV station on the Clear Crossing to Figaro 345 kV line between Clear Crossing and Kirchoff ERCOT project 90059 · utility no. TP2024121 | Current-year planned → Future | Cascabel |
| Moved between tabs | Abilene Northwest to Mulberry Creek: Rebuild 138 kV Line Rebuild the Abilene Northwest to Mulberry Creek 138 kV line ERCOT project 90065 · utility no. TP2023881 | Current-year planned → Future | Abilene Northwest, Mulberry Creek |
| Moved between tabs | Install new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers. Convert Pinehurst to unity power factor substation. ERCOT project 90161C | Current-year planned → Future | Pinehurst |
| Moved between tabs | Buchanan_Burnet_TL_Overhaul Perform an overhaul on the 11.4 mile T108 Buchanan - Burnet 69-kV (de-energized) transmission line ERCOT project 91402 · utility no. PLC-6943 · RTP 25RPG015 | Current-year planned → Completed | Buchanan, Burnet |
| Moved between tabs | Establish Glaze Lake 138 kV Switch ERCOT project 91534A · utility no. R6345 | Current-year planned → Completed | Glaze Lake 138 kV Switch |
| Moved between tabs | Establish Glaze Lake 138 kV Switch Establish Glaze Lake 138 kV Switch Gen Tie ERCOT project 91534B · utility no. R6345 | Current-year planned → Completed | Glaze Lake 138 kV Switch, Leon Solar |
| Moved between tabs | White Mule (fka Elmar) 138 kV Substation Reconfiguration Construct a new White Mule (fka Elmar) 138 kV Substation on the Quarry Field - Border 138 kV Line ERCOT project 91664 · utility no. R8804 | Future → Current-year planned | White Mule |
| Moved between tabs | Establish Gristmill 345 kV Switch Establish Gristmill 345 kV Switch for Yaupon Solar and Storage ERCOT project 91911 · utility no. R6232 | Current-year planned → Completed | Gristmill |
| Moved between tabs | Chelsea 138 kV Switch ERCOT project 92625 · utility no. M5019 | Current-year planned → Future | Chelsea Switch |
| Moved between tabs | Saddlewood 138 kV Switch ERCOT project 92646 · utility no. M3242 | Current-year planned → Completed | Saddlewood |
| Moved between tabs | Stainback 345 kV Switch Establish Stainback 345 kV Switch ERCOT project 92680 · utility no. M4383 | Current-year planned → Completed | Stainback 345 kV Switch |
| Moved between tabs | Watermill to Reindeer 138 kV Line Upgrade Watermill to Reindeer 138 kV Line ERCOT project 92845 · utility no. M4430 | Current-year planned → Completed | Watermill Switch, Reindeer |
| Moved between tabs | Bradberry Switch 138 kV Capacitors (Skybox Lancaster) ERCOT project 92870 · utility no. M4431 | Current-year planned → Completed | Bradberry Switch |
| Moved between tabs | Bear_Pen 345 kV Switch Establish Bear pen 345 kV Switch ERCOT project 92874 · utility no. M3063 | Future → Cancelled | Bear Pen 345 kV Switch |
| Moved between tabs | Bent Tree 138 kV Substation Establish Bent Tree 138 kV Substation with 55.2 MVAR capacitor bank using 3-18.4 MVAR stages ERCOT project 93191 · utility no. R6388 | Current-year planned → Future | Bent Tree Substation |
| Moved between tabs | Quanah: Rebuild 69 kV Station Rehab Quanah 69 kV station ERCOT project 98593 · utility no. TA2018027 | Current-year planned → Future | Quanah |
| Moved between tabs | Plover: Rebuild 69 kV Station Rebuild Eldorado Cities Service Co. Tap and rename to Plover ERCOT project 98612 | Current-year planned → Future | Plover |
| Moved between tabs | Dotterel: Rebuild 69 kV Station Rebuild Middle Valley REA Tap and rename to Dotterel ERCOT project 98616 | Current-year planned → Future | Dotterel |
| Moved between tabs | Expand Channelview 138kV substation for Brookview Road BESS (27INR0243) ERCOT project 99132 | Future → Cancelled | Channelview |
| Moved between tabs | TH Wharton CB2 Cap Bank Remove 120 MVAR CB1 cap bank from Velasco substation. Install removed CB1 cap bank at TH Wharton substation as replacement for THW CB2. ERCOT project 99399 | Current-year planned → Completed | Velasco, TH Wharton |
| Moved between tabs | Daybreak_Substation_Addition Substation addition to provide Point of Interconnection for Oncor's Good Morning substation addition. Requires coordination with Oncor. ERCOT project 99411 | Current-year planned → Future | Daybreak, Good Morning |
| Moved between tabs | Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.69B Greens Bayou to Deepwater to increase thermal limits as part of FRM2 upgrades ERCOT project 99453B | Current-year planned → Future | Greens Bayou, Deepwater |
| Moved between tabs | Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.97B King to North Belt to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453E | Current-year planned → Future | King, North Belt |
| Moved between tabs | Laredo VFT North: 138 kV Breaker Addition Install additional 138 kV breaker on the Lobo circuit #1 138 kV terminal at the Laredo VFT North 138 kV station ERCOT project 99744 | Current-year planned → Completed | Laredo VFT North |
| Moved between tabs | Marconi: Expand 138 kV Station Interconnect Pajarita BESS to the existing Marconi 138 kV station ERCOT project 99800 · utility no. TP2025326 | Future → Cancelled | Marconi |
| Moved between tabs | Kirkland 138 kV Capacitor Bank ERCOT project 99941 · utility no. M4022 | Current-year planned → Future | Kirkland |
| Status as reported | 23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit This project is Phase 1 of the Spruce to Pawnee Double Circuit Rebuild. This Phase captures the completion of the new second circuit from Spruce to Pawnee with the final rating of circuit 2. ERCOT project 100018 · utility no. T-0400 · RPG 23RPG032 | Planned → Under Construction | None named |
| Status as reported | 23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit This project is phase 2 of the Spruce to Pawnee Double circuit rebuild. Phase 2 captures the CPS owned portion of the existing Spruce to Pawnee circuit 1 being upgraded. The remaining STEC owned portion will be upgraded/completed at a later date. ERCOT project 100020 · utility no. T-0400 · RPG 23RPG032 | Planned → Under Construction | None named |
| Status as reported | Gristmill_Substation_Addition LCRA TSC will construct a new Gristmill Substation to provide transformation service to a PEC-member load ERCOT project 100165 | Planned → In-Service | Gristmill |
| Status as reported | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits. ERCOT project 102546A · RTP 24RPG028 | Planned → Conceptual | HOPSON, WARVUE |
| Status as reported | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits. ERCOT project 102546B · RTP 24RPG028 | Planned → Conceptual | DALTON, BRINE |
| Status as reported | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.03G Lyondell to Channelview (distribution) to Channelview (ring bus) in order to increase thermal limits. ERCOT project 102546C · RTP 24RPG028 | Planned → Conceptual | Lyondell, Channelview |
| Status as reported | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.08 Hermann to Grant to increase thermal limits. ERCOT project 102546D · RTP 24RPG028 | Planned → Conceptual | Hermann, Grant |
| Status as reported | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.06L Plaza to Knight to Gulfgate to increase thermal limits. ERCOT project 102546E · RTP 24RPG028 | Planned → Conceptual | Plaza, Gulfgate |
| Status as reported | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.73B Britmoore to Woodcreek to Memorial to Westheimer in order to increase thermal limits. ERCOT project 102546F · RTP 24RPG028 | Planned → Conceptual | Britmoore, Westheimer |
| Status as reported | Upgrades related to the Baytown Area Load Addition Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits. ERCOT project 102546G · RTP 24RPG028 | Planned → Conceptual | PH Robinson, HUNTER |
| Status as reported | Upgrades related to the Baytown Area Load Addition Install (3) 7.2 MVAR distribution cap banks at Bayway substation. ERCOT project 102546H · RTP 24RPG028 | Planned → Conceptual | Bayway |
| Status as reported | Upgrades related to the Baytown Area Load Addition Install (1) 60 MVAR cap bank at Mykawa substation. ERCOT project 102546I · RTP 24RPG028 | Planned → Conceptual | Mykawa |
| Status as reported | Upgrades related to the Baytown Area Load Addition Install (1) 60 MVAR switchable cap bank at Humble substation. ERCOT project 102546J · RTP 24RPG028 | Planned → Conceptual | Humble |
| Status as reported | Upgrades related to the Baytown Area Load Addition Install (2) 14.4 MVAR distribution cap banks at Treaschwig substation. ERCOT project 102546K · RTP 24RPG028 | Planned → Conceptual | Treaschwig |
| Status as reported | Establish Pathfinder 345 kV Switch ERCOT project 104658A · utility no. R6364 | Planned → In-Service | Pathfinder |
| Status as reported | Establish Pathfinder 345 kV Switch Pathfinder 345 kV Switch Gen Tie ERCOT project 104658B · utility no. R6364 | Planned → In-Service | Pathfinder, Piedra Solar |
| Status as reported | Upgrade Killeen Switch - Salado Switch 345 kV Line Ckt #1 ERCOT project 109892 · utility no. R6567 | Planned → Conceptual | Killeen, Salado |
| Status as reported | Install Jewett Switch - Crockett Switch 138 kV Line Ckt #2 ERCOT project 110000 · utility no. R6554 | Planned → Conceptual | Jewett Switch, Crockett Switch |
| Status as reported | Install Crockett Switch - Lufkin Switch 138 kV Line Ckt#2 ERCOT project 110002 · utility no. R6555 | Planned → Conceptual | Crockett Switch, Lufkin Switch |
| Status as reported | This models the new CEHE Raider Substation and upgrades required for a proposed load addition Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service. ERCOT project 110068A | Conceptual → Planned | Raider, Cedar Creek, Bailey |
| Status as reported | This models the new CEHE Raider Substation and upgrades required for a proposed load addition Loop 345 kV Ckt. 64 Wolf-Hillje line into the new 345 kV CEHE Raider substation. Upgrade line relaying on Ckt 64 WOLF-Raider-Hillje. ERCOT project 110068B | Conceptual → Planned | Raider, Wolf, Hillje |
| Status as reported | A new Helotes 345kV substation will be constructed ERCOT project 110263 · utility no. T-0410 · RPG 25RPG013 and 25RPG017 | Planned → Under Construction | Helotes |
| Status as reported | Upgrade Salado Switch - Puma 138 kV Line Section ERCOT project 110336 · utility no. R6570 | Planned → Conceptual | Salado, Puma |
| Status as reported | Rebuild Voss Lake Switch - Minerva Switch 138 kV Line ERCOT project 110338 · utility no. R6571 | Planned → Conceptual | Voss Lake, Minerva |
| Status as reported | Add Temple Switch - Fryers Creek Switch 138 kV Line Ckt #2 ERCOT project 110340 · utility no. R6572 | Planned → Conceptual | Temple, Fryers Creek |
| Status as reported | Rio Hondo to Bonilla: Rebuild/Reconductor 345 kV Line Rebuild/Reconductor Rio Hondo to Bonilla 345 kV line ERCOT project 110437 | Conceptual → Planned | Rio Hondo, Bonilla |
| Status as reported | Fincas: Build new 138 kV distribution station Construct new distribution station on the University to Wormser 138 kV line ERCOT project 48774 · utility no. 3765 | Under Construction → In-Service | Fincas |
| Status as reported | Structure 31/8 - Kenedy SS: Line Rebuild Coleto Creek - Kenedy SS: Line Rebuild ERCOT project 50866 · utility no. 3779 · RPG 20RPG014 | Planned → Under Construction | Rosata, Kenedy SS |
| Status as reported | Port Lavaca: Station Rebuild (Cangrejo) Rebuild the Port Lavaca (Cangrejo) station ERCOT project 50890 · utility no. 3787 TA2019045 · RPG 21RPG002 | Planned → Under Construction | Port Lavaca |
| Status as reported | Ballinger to Concho: Rebuild 69 kV line Rebuild Ballinger to Concho 69 kV line, install POP switch for Rowena, install CB at Miles, install POP switch for Harriett REA ERCOT project 55421 · utility no. 1861 · RPG 20RPG004 | Planned → Under Construction | Ballinger, San Angelo Concho |
| Status as reported | Upgrade Moore to Hondo Creek 138 kV line Replace the 336 ACSR with 1020 ACCC conductor while keeping the existing structures that still meet our standards. ERCOT project 55873 · RPG 19RPG021 | Planned → In-Service | Moore, Hondo Creek |
| Status as reported | Matador to Turkey: Rebuild 69 kV Line Rebuild 69 kV line from Matador to Turkey ERCOT project 61552 · utility no. 1873 | Under Construction → In-Service | Matador, Turkey |
| Status as reported | New Cachena 345kV Switchyard The New 345kV Cachena switchyard will be looped into the future 345 kV Elm Creek to New Hickory ckt 1 transmission line . This loop should be rated to match or exceed the existing line rating. ERCOT project 65837 · utility no. S-0966 | Planned → Under Construction | Cachena |
| Status as reported | Cedar Crest - Dealey - West Levee 138 kV Line Upgrade the existing 138 kV Line ERCOT project 66188 · utility no. M4212 | Planned → In-Service | Ceadr Crest, West Levee |
| Status as reported | Upgrade Taylor - Holland 69 kV Line Rebuild the Granger - Taylor 69 kV Line ERCOT project 66200D · utility no. R6173 · RPG 22RPG036 | Planned → In-Service | Taylor, Holland |
| Status as reported | Mesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line Upgrade the Mesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line ERCOT project 66473 · utility no. M4137 | Planned → In-Service | Mesquite East, Oates |
| Status as reported | Rosata: Build 138kV Substation Build new Rosata 138 kV POD Switch on the Coleto Creek to Kenedy 138 kV line ERCOT project 6749 · utility no. 3682 | Planned → In-Service | Rosata |
| Status as reported | CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade Shepherd Rd to Valley Rd 138kV line Reconfiguration. ERCOT project 67992A | Planned → In-Service | Howard Switching, Shepherd Rd, Valley Rd |
| Status as reported | CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade Looping of 345KV Howard Rd switching station into existing Cagnon to AVR and Cagnon to Spruce 34KV lies. The switching station will have 2 600MVA 345KV/138KV autotransformers. ERCOT project 67992C | Planned → In-Service | 5400 and 5475 |
| Status as reported | CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade Upgrade Hamilton to Medical Center 138KV Line to 469MVA ERCOT project 67992D | Planned → In-Service | Howard Switching |
| Status as reported | Jaguar: Construct New Distribution Station Construct new distribution station on the McGruder to Thomaston 138 kV line ERCOT project 69473 | Under Construction → In-Service | Jaguar |
| Status as reported | Rebuild Olivia - Carancahua rebuild Olivia sw to Carancahua 795 ACSR ERCOT project 70882 | Planned → In-Service | Olivia SW, Carancahua |
| Status as reported | Flomot Tap: Rebuild 69 kV Line Rehab Flomot Tap 69 kV Line ERCOT project 70898 | Planned → In-Service | Flomot Tap, Flomot |
| Status as reported | Roanoke Area Upgrades Ramhorn Hill – Dunham 345 kV Double-Circuit Line ERCOT project 70900E · utility no. M5281 M5144 M5146 M5148 · RPG 22RPG003 | Planned → In-Service | Dunham Switch, Ramhorn Switch |
| Status as reported | Roanoke Area Upgrades Establish Roanoke_Exchange 138 kV Line ERCOT project 70900F · utility no. M5281 M5144 M5146 M5148 · RPG 22RPG003 | Planned → Under Construction | Roanoke Switch, Exchange Switch |
| Status as reported | Centerville Switch - Lake Hubbard Switch 138 kV Double-Circuit Line Upgrade the existing 138 kV Double-Circuit Line ERCOT project 71130 · utility no. M4126 | Planned → In-Service | Lake Hubbard, Centerville |
| Status as reported | Establish Launch Pad 138 kV Switch ERCOT project 71903 · utility no. R6156 | Planned → In-Service | Launch Pad |
| Status as reported | Upgrade STEC castroville to Pearson to 138kV Upgrade STEC Bader station to 138kV. Upgrade STEC Castroville to bader and bader to pearson to 138kV ERCOT project 71917 · RPG 22RPG022 | Planned → Under Construction | Bader |
| Status as reported | Upgrade Hondo Creek to Castroville to 138kV Upgrade Castroville sub to 138kV and line from Hondo creek to Castroville ERCOT project 71935 · RPG 22RPG022 | Planned → In-Service | Castroville |
| Status as reported | Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Loop new CEHE 138kV substation Ashville (ASH) into Ckt.06F Garden Villas to Holmes to create new Ckt.06 Garden Villas to Ashville to Holmes ERCOT project 72029A | Planned → Conceptual | Ashville, Garden Villas, Holmes |
| Status as reported | Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ Solar. Utilize same generator lead as Dori BQ BESS. ERCOT project 72029B | Planned → Conceptual | Ashville, SUNLIT |
| Status as reported | Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ BESS. Utilize same generator lead as Dori BQ Solar. ERCOT project 72029C | Planned → Conceptual | Ashville, SUNLIT |
| Status as reported | New Ingram Rd 138kV Substation Install a new 138kV transmission loop in conjunction with the S-0978 QTS Ingram Rd Substation project. The substation will be looped into the Potranco to TCC/Crossroads transmission line and connected to (2) 138kV line terminals. ERCOT project 72268 · utility no. S-0978 | Planned → Under Construction | Ingram Rd, S-0978 QTS Ingram Rd |
| Status as reported | Bluff Creek: 138 kV Station Work Replace fourteen (14) 138 kV Breakers and one (1) Circuit Switcher ERCOT project 72942 | Planned → In-Service | Bluff Creek |
| Status as reported | Vertrees: Construct New Distribution Station Construct new distribution station on the Stewart Road to Weslaco Unit 138 kV line ERCOT project 73359 | Planned → In-Service | Vertrees |
| Status as reported | San Antonio South Reliability RPG Project The Leon Creek to Howard Rd circuit should be upgraded to 698 MVA, minimum. ERCOT project 75255C · RPG 22RPG048 | Planned → Under Construction | None named |
| Status as reported | San Antonio South Reliability RPG Project Rebuild approximately 3 circuit miles of 138KV Transmission from Leon Creek to South San to meet current CPS Energy and industry standards. The new line will require a rating of 478MVA. ERCOT project 75255F · RPG 22RPG048 | Planned → Under Construction | None named |
| Status as reported | Install new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar Install new 345kV Speedway (SPD) substation for generator interconnection to CRADLE/ Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. ERCOT project 75810A | Planned → Conceptual | Speedway, DOW, Oasis |
| Status as reported | Install new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar Install generator lead from Speedway (SPD) substation to CRADLE (CDL) customer substation (23INR0150). ERCOT project 75810B | Planned → Conceptual | Speedway, CRADLE |
| Status as reported | Juncus: Construct New 69 kV Station Interconnect the TEC Snodgrass load to the new Juncus 69 kV station on the Abilene South to Steamboat 69 kV line ERCOT project 76139 · utility no. TP2023074 | Planned → In-Service | Juncus |
| Status as reported | Asherton: Rebuild 138 kV station Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station ERCOT project 76569 · RPG 23RPG007 | Planned → Under Construction | Asherton |
| Status as reported | Asherton to Uvalde: Convert to 138 kV Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station ERCOT project 76576 · RPG 23RPG007 | Planned → Under Construction | Asherton, Uvalde |
| Status as reported | Poblano: Build new 138 kV station Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station ERCOT project 76580 · RPG 23RPG007 | Planned → Under Construction | Poblano |
| Status as reported | Establish Walleye Creek 345/138 kV Switch ERCOT project 76650 · utility no. R6243 · RPG 23RPG030 | Planned → In-Service | Walleye Creek |
| Status as reported | Line Termination at Cypress Waters Vineyard Switch – Hackberry Switch 138 kV Line Termination at Cypress Waters 138 kV Switch ERCOT project 76652 · utility no. M5344 | Planned → In-Service | Cypress Waters |
| Status as reported | Upgrade Driscoll- Loyola Upgrade Driscol-Ricardo-Riviera-Loyola to 795 ACSR ERCOT project 76786 | Planned → Under Construction | Driscoll, Loyola |
| Status as reported | Cowpen 138kV station from TNMP submitted Cowpen/Silverleaf RPG ERCOT project 77803 · RPG 23RPG013 | Planned → Under Construction | Cowpen |
| Status as reported | Wilmer 345/138 kV Switch Establish Wilmer 345/138 kV Switch ERCOT project 78357 · utility no. M4369 M4371 M4372 · RPG 24RPG022 | Planned → In-Service | Wilmer |
| Status as reported | Gunter 345/138 kV Switch Establish Gunter 345/138 kV Switch ERCOT project 78363 · utility no. M3301 · RPG 24RPG025 | Planned → In-Service | Gunter |
| Status as reported | Rebuild Oaks to Poteet to Pearsall 69 kV line Rebuild Oaks to Poteet to Pearsall 69 kV line from 4/0 to 795. 2023 RTP ERCOT project 78478 | Planned → Under Construction | Oaks, Pearsall |
| Status as reported | Rebuild Nada to El Campo 69 kV line Rebuild Nada to El Campo 69 kV line from 4/0 to 795. 2023 RTP ERCOT project 78483 | Planned → Under Construction | Nada, El Campo |
| Status as reported | Britmoore to Bellaire Ckt.24B Upgrades Upgrade Ckt.24B Hayes to Britmoore to increase thermal limits. ERCOT project 78485F · RPG 23RPG025 | Planned → In-Service | Hayes, Britmoore |
| Status as reported | North McAllen: Construct New 138 kV Terminal Interconnect Carambola BESS to the North McAllen 138 kV station ERCOT project 80482 | Planned → In-Service | North McAllen |
| Status as reported | Ranger Camp – Cattleman 345 kV Double-Circuit Line Construct a new 345 kV double-circuit line from Ranger Camp to Cattleman ERCOT project 81274 · utility no. R8648 · RPG 23RPG029 | Planned → In-Service | Ranger Camp, Cattleman |
| Status as reported | GSEC_9452_Add_Snodgrass_Sub Adding new Snodgrass sub to connect to AEP's Juncus Station. ERCOT project 81354 | Planned → In-Service | Snodgrass, Juncus |
| Status as reported | GSEC_9466_Add_CampSprings_Sub Add Big Country's Camp Springs Sub 9MW ERCOT project 81544 | Planned → In-Service | CampSprings, Big Country's Camp Springs |
| Status as reported | Dunlay substation Adds STEC Dunlay Load serving station ERCOT project 81594 | Planned → Under Construction | Dunlay |
| Status as reported | Olympus 138 kV Switch Topology Correction: Add missing Olympus Switch - Kerens 138 kV Line Section ERCOT project 82810B · utility no. R6330 | Planned → In-Service | Olympus Switch, Kerens |
| Status as reported | Olympus 138 kV Switch Establish POI for Gaia Solar ERCOT project 82810C · utility no. R6330 | Planned → In-Service | Olympus, Gaia |
| Status as reported | New Furhman Substation Adds New Furhman switching station on Rayburn - Vanderbilt line for generator interconnect ERCOT project 82829 | Planned → In-Service | Rayburn, Vanderbilt |
| Status as reported | 23RPG032: San Antonio South Reliability II: Rebuild Pawnee to Tango into a double circuit Rebuild approximately 12 miles of existing horizontal single circuit 345kV transmission infrastructure into new vertical double circuit 345kV transmission infrastructure. ERCOT project 84900 · utility no. T-0401 · RPG 23RPG032 | Planned → Under Construction | None named |
| Status as reported | 23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit The final upgrades on the STEC side will be completed and the ultimate ratings of the double circuit will be realized. ERCOT project 84902 · utility no. T-0400 · RPG 23RPG032 | Planned → Under Construction | None named |
| Status as reported | Expand ADLONG substation for XE Murat Storage (24INR0329) Expand facilities at customer-owned ADLONG substation for XE Murat Storage (24INR0329). Utilize existing generator lead Eastgate to XE Murat Solar. ERCOT project 86009 | Planned → In-Service | Eastgate, ADLONG |
| Status as reported | Snug 138kV Substation expansion for Cottonwood Bayou Storage (21INR0443) Install Cottonwood Bayou Storage (21INR0443) at Snug 138kV substation. Connect at the same generator lead as Cottonwood Bayou Solar. ERCOT project 86011 | Planned → In-Service | Snug |
| Status as reported | Fairmont Distribution Reconfigurations with 4th Transformer Install fourth Fairmont distribution transformer on Ckt.95F to create new Ckt.95F SOUTH to Fairmont TR4 tap to Clear Lake tap to Polaris tap to Kemah tap to PH Robinson 138kV North. Remove Fairmont TR3 from Ckt.95F and onto the Ckt.35A Fairmont line position. ERCOT project 86013 | Planned → In-Service | Fairmont |
| Status as reported | Primavera: Construct New 138 kV Terminal Interconnect Project Lynx Storage to the Primavera 138 kV station ERCOT project 87031 · utility no. TP2024100 | Planned → In-Service | Primavera |
| Status as reported | GSEC_Tier4_9468_Add_Bull_Sub New Substation Load out of 68001 Claytonville ERCOT project 87146 | Planned → In-Service | Claytonville |
| Status as reported | Old Country 345 kV Switch ERCOT project 87799 · utility no. M4172 | Planned → In-Service | Old Country |
| Status as reported | 24RPG004: Omicron Reliability Project: Rebuild Leon Creek to Pearsal Rebuild ~1.6 miles of double-ckt from Leon Creek to Pearsall transmission line with normal and emergency ratings of at least 478MVA ERCOT project 88041 · utility no. T-0396 · RPG 24RPG004 | Planned → Under Construction | None named |
| Status as reported | Establish Glaze Lake 138 kV Switch ERCOT project 91534A · utility no. R6345 | Planned → In-Service | Glaze Lake 138 kV Switch |
| Status as reported | Establish Glaze Lake 138 kV Switch Establish Glaze Lake 138 kV Switch Gen Tie ERCOT project 91534B · utility no. R6345 | Planned → In-Service | Glaze Lake 138 kV Switch, Leon Solar |
| Status as reported | Establish Gristmill 345 kV Switch Establish Gristmill 345 kV Switch for Yaupon Solar and Storage ERCOT project 91911 · utility no. R6232 | Planned → In-Service | Gristmill |
| Status as reported | Saddlewood 138 kV Switch ERCOT project 92646 · utility no. M3242 | Planned → In-Service | Saddlewood |
| Status as reported | Stainback 345 kV Switch Establish Stainback 345 kV Switch ERCOT project 92680 · utility no. M4383 | Planned → In-Service | Stainback 345 kV Switch |
| Status as reported | Watermill to Reindeer 138 kV Line Upgrade Watermill to Reindeer 138 kV Line ERCOT project 92845 · utility no. M4430 | Planned → In-Service | Watermill Switch, Reindeer |
| Status as reported | Bradberry Switch 138 kV Capacitors (Skybox Lancaster) ERCOT project 92870 · utility no. M4431 | Planned → In-Service | Bradberry Switch |
| Status as reported | Expand Channelview 138kV substation for Brookview Road BESS (27INR0243) ERCOT project 99132 | Planned → Conceptual | Channelview |
| Status as reported | TH Wharton CB2 Cap Bank Remove 120 MVAR CB1 cap bank from Velasco substation. Install removed CB1 cap bank at TH Wharton substation as replacement for THW CB2. ERCOT project 99399 | Planned → In-Service | Velasco, TH Wharton |
| Status as reported | Laredo VFT North: 138 kV Breaker Addition Install additional 138 kV breaker on the Lobo circuit #1 138 kV terminal at the Laredo VFT North 138 kV station ERCOT project 99744 | Planned → In-Service | Laredo VFT North |
| Projected in-service date | Establish Maxdale 138 kV Switch Establish Maxdale 138 kV Switch for Cosper Solar ERCOT project 100076 · utility no. R6468 | May 2027 → Dec 2027 | Maxdale |
| Projected in-service date | Install a 50MVAr Capacitor Bank at Howard Substation ERCOT project 100691 | Jun 2028 → Jan 2032 | Howard |
| Projected in-service date | BEPC_TPIT102755_Dennis ERCOT project 102755 | Dec 2027 → Mar 2028 | None named |
| Projected in-service date | Add Fort Bobcat load serving station and Tline to STEC Orange Grove ERCOT project 102871 | Aug 2026 → Sep 2026 | None named |
| Projected in-service date | Blu Lacy: Construct New 765/345 kV Station Construct new 765/345 kV station on the Lon Hill to Reforzar and Lon Hill to Nelson Sharpe 345 kV lines ERCOT project 102885 · utility no. TP2025322 · RPG 25RPG025 | Nov 2031 → Jan 2032 | Blu Lacy |
| Projected in-service date | Blu Lacy to Howard: Construct New 765 kV Line Construct a new 765 kV single circuit line from Blu Lacy to Howard ERCOT project 102901 · utility no. TP2025322 · RPG 25RPG025 | Nov 2031 → Jan 2032 | Blu Lacy, Howard |
| Projected in-service date | Llano: Build new 69 kV Station Interconnect PEC's New Junction Station to the Junction to Mason Switch 69 kV Line ERCOT project 103259 | May 2027 → Jun 2028 | Llano |
| Projected in-service date | Brownsville SW: 69 kV Breaker Replacement Replace 69 kV breakers at the Brownsville 69 kV station ERCOT project 103412 · utility no. TP2025939 | Jan 2028 → Jan 2029 | Brownsville SW |
| Projected in-service date | Rio Hondo: 138 kV Breaker Replacement Replace 138 kV breakers at the Rio Hondo 138 kV station ERCOT project 103414 · utility no. TP2025950 | Mar 2028 → Oct 2028 | Rio Hondo |
| Projected in-service date | South McAllen: 138 kV Breaker Replacement Replace 138 kV breakers at the South McAllen 138 kV station ERCOT project 103416 · utility no. TP2026008 | Dec 2028 → Nov 2029 | South McAllen |
| Projected in-service date | Welsh HVDC: Build 345 kV Bypass Line Construct new 345 kV bypass line at the Welsh HVDC 345 kV station ERCOT project 103470 · utility no. TP2024163 | Jun 2028 → Mar 2030 | Welsh HVDC |
| Projected in-service date | Taft: Rebuild Distribution Station Rebuild the Taft distribution station ERCOT project 103479 · utility no. DP25X0014 | Jun 2028 → Dec 2030 | Taft |
| Projected in-service date | BRYN_ColeLane Construct Cole Lane 138-kV Substation by cutting into the existing Keith Switch to Steep Hollow 138-kV transmission line. ERCOT project 103787 | Jun 2030 → Jun 2028 | Cole Lane, Keith, Steep Hollow |
| Projected in-service date | BRYN_GreensPrairie_Rebuild Rebuild Greens Prairie 138-kV Substation to add a second distribution transformer ERCOT project 103793 | Jun 2028 → Jun 2027 | Greens Prairie |
| Projected in-service date | Blu Lacy to Hillje: Construct New 765 kV Line Construct a new 765 kV single circuit line from Blu Lacy to Howard ERCOT project 103809 · utility no. TP2025322 · RPG 25RPG025 | Nov 2031 → Jan 2032 | Blu Lacy, Hillje |
| Projected in-service date | Montura: Construct New 345 kV Station Interconnect Bullring Wind 1, 2, and 3 to the new Montura 345 kV station on the Cruce to Del Sol 345 kV line ERCOT project 103816 · utility no. TP2025870 | Jun 2028 → Aug 2028 | Montura |
| Projected in-service date | BRYN_MillicanSwitch_Rebuild Rebuild Millican Switch to remove the 69-kV bus and transfer distribution load to the 138-kV bus. Remove Millican 69-kV Substation. ERCOT project 103826 | Jun 2028 → Jun 2031 | Millican Switch |
| Projected in-service date | BRYN_ShadyLane_Rebuild Rebuild Shady Lane into a ring bus configuration. MAY NEED TO DELETE THIS LATER IF IT CONFLICTS WITH A FUTURE NOMCR OR NMMS TOPOLOGY. ERCOT project 103867 | Oct 2026 → Oct 2027 | Shady Lane |
| Projected in-service date | Potterson Lake 138 kV Switch Establish new 138 kV Switch ERCOT project 103919 · utility no. R8908 | May 2027 → Dec 2027 | Catclaw, Mudstone |
| Projected in-service date | Wesmer: 138 kV Breaker and Circuit Switcher Replacement Replace 138 kV breakers and circuit switches at the Wesmer 138 kV station ERCOT project 103962 · utility no. TP2025940 | Dec 2028 → Jan 2029 | Wesmer |
| Projected in-service date | BRYN_KoppeBridge_Load_Addition Adding second distribution transformer at Koppe Bridge ERCOT project 104001 | Jun 2028 → Jun 2029 | Koppe Bridge |
| Projected in-service date | Lake Pauline to Quanah: Convert to 138 kV Convert the Lake Pauline to Quanah 69 kV line to 138 kV ERCOT project 104018 · utility no. TP2025249 · RPG 25RPG018 | Nov 2031 → Nov 2030 | Lake Pauline, Quanah |
| Projected in-service date | Nippert: Construct New 138/69 kV Station Construct new Nippert 138/69 kV station on the Childress to Quanah 69 kV line between Childress and Goodlet and on the Paducah to West Childress 138 kV line ERCOT project 104020 · utility no. TP2025249 · RPG 25RPG018 | Nov 2031 → Nov 2030 | Nippert |
| Projected in-service date | Morado (Abilene Northwest): Rebuild 138 kV Station Rebuild the Morado (Abilene Northwest) 138 kV station ERCOT project 104026 · utility no. TP2023700 · RPG 25RPG036 | Feb 2031 → Nov 2028 | Morado |
| Projected in-service date | Rincon to Tungsten: Rebuild 138 kV Line Rebuild the Rincon to Tungsten 138 kV line ERCOT project 104084 · utility no. TP2026007 | Nov 2028 → Jun 2029 | Rincon, Tungsten |
| Projected in-service date | North Edinburg to North McAllen: Rebuild 138 kV line ERCOT project 104151 · utility no. TA2021190 | Jan 2032 → Jan 2031 | North Edinburg, North McAllen |
| Projected in-service date | BRYN_SOSW-HLMN-DWLRD_Upgrade Upgrade South Switch to Holleman 138kV Line ERCOT project 104249A | Jun 2028 → Jun 2030 | Holleman, South Switch |
| Projected in-service date | BRYN_SOSW-HLMN-DWLRD_Upgrade Upgrade Dowling Road to Holleman 138kV Line ERCOT project 104249B | Jun 2028 → Jun 2030 | Dowling Road, Holleman |
| Projected in-service date | Salvare: Install New 345 kV Feed Install 2nd POI for IRIS Data center ERCOT project 104448 · utility no. TP2026040 | Oct 2028 → Feb 2028 | Salvare |
| Projected in-service date | Kingsbury Substation Addition Add new load serving substation 1.5 miles northwest of Kingsbury w/40 MVA PWT, station to be cut into LCRA T158 ckt. ERCOT project 104460 | Oct 2028 → Dec 2028 | Kingsbury |
| Projected in-service date | Hockley Distribution Transformer Addition with Upgrades Install 3rd Transformer and 8th 35 kV feeder at Hockley distribution substation ERCOT project 104559A | Dec 2027 → May 2028 | Hockley |
| Projected in-service date | Glint: Construct New 138 kV Station Interconnect Falcon BESS to the new Glint 138 kV station on the Lopeno to Zapata 138 kV line ERCOT project 104562 · utility no. TP2026040 | Oct 2028 → Jul 2028 | Glint |
| Projected in-service date | Colmena: Construct new 345 kV Station Interconnect Abeja Solar to the new Colmena 345 kV Station on the Tango to Goddard 345 kV line ERCOT project 104630 · utility no. TP2026011 | Dec 2028 → Mar 2029 | Colmena |
| Projected in-service date | WesternWind_Switch Establish Western Wind Switch to interconnect Adamstown solar ERCOT project 104830 | May 2027 → Dec 2026 | Krum West Switch, Riley |
| Projected in-service date | Missouri City Low Profile Conversion Convert Missouri City distribution substation to low-profile. Install Missouri City TR4 at Ckt.02A Blueridge to Missouri City to DEWALT. ERCOT project 105135 | Mar 2027 → Apr 2027 | Missouri City, Blueridge, DEWALT |
| Projected in-service date | Dinolong 765 kV Switch Establish a 765 kV midpoint station to support reactive compensation needs for the Dinosaur - Longshore 765 kV Line ERCOT project 105247 · utility no. R8970 | Dec 2031 → Dec 2029 | Dinosaur, Longshore |
| Projected in-service date | Alba Road 345 kV Switch Establish Alba Road 345 kV Switch ERCOT project 105312 · utility no. M4385 · RPG 25RPG004 | Dec 2028 → May 2028 | Alba Road Switch |
| Projected in-service date | Greene 345/138 kV Switch Establish Greene 345/138 kV Switch ERCOT project 105318 · utility no. M4255 · RPG 25RPG004 | May 2028 → Dec 2028 | Greene Switch |
| Projected in-service date | MODELS FLYCATCHER ERCOT project 105602 | Jan 2027 → Mar 2027 | None named |
| Projected in-service date | Alba Road 345kV Statcom Upgrade Alba Road 345kV Statcom ERCOT project 105833 · utility no. M4386 · RPG 25RPG004 | Dec 2029 → May 2029 | Alba Switch |
| Projected in-service date | Greene 345kV STATCOM Establish Greene 345kV STATCOM ERCOT project 105836 · utility no. M4387 · RPG 25RPG004 | Dec 2029 → May 2029 | Greene |
| Projected in-service date | East Watermill 765 kV Switch Establish East Watermill 765 kV Switch ERCOT project 105886 · utility no. M4477 · RPG 25RPG025 | May 2032 → Dec 2030 | East Watermill 765 kV Switch |
| Projected in-service date | South Watermill 765 kV Switch Establish South Watermill 765 kV Switch ERCOT project 105888 · utility no. M4478, M4460, M4459 · RPG 25RPG025 | May 2032 → Dec 2030 | South Watermill 765 kV Switch |
| Projected in-service date | Angstrom: Expand 345 kV Station Interconnect Alila Solar to the Angstrom 345 kV station ERCOT project 109706 · utility no. TP2023019 | Jun 2026 → Nov 2027 | Ansgtrom |
| Projected in-service date | Donatello: Construct New 345 kV Station Interconnect the Mirando Valley Wind and the Viento Bravo Wind to the new Donatello 345 kV station on the Cenizo to Cruze 345 kV line ERCOT project 109739 · utility no. TP2026135 | Jul 2028 → Jan 2029 | Donatello |
| Projected in-service date | Hardening Project for circuit 05 WAP to Missouri City(26RPG021). ERCOT project 109759 · RPG 26RPG021 | Dec 2027 → Jun 2028 | HO Clarke, Missouri City |
| Projected in-service date | Rebuild/reconductor portions of Ckt.05D Missouri City to Westchase as a Hardening Upgrade(26RPG024). ERCOT project 109761 · RPG 26RPG024 | Dec 2027 → Jun 2028 | Westchase, Missouri City |
| Projected in-service date | Oncor_ME_109845_Cleburne Switch - Venus 138 kV Line Section and Rebuild Cleburne 138 kV Switch Upgrade Cleburne Switch - Venus 138 kV Line Section and Rebuild Cleburne 138 kV Switch ERCOT project 109845 · utility no. M5371, M5196 · RPG 25RPG040 · RTP 2024-NC04 | Dec 2029 → Dec 2028 | Venus Substation, Cleburne Switch |
| Projected in-service date | Rebuild the existing Medinabs to 36th Street 138-kV transmission line ERCOT project 109940 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017 | Dec 2029 → Jan 2032 | None named |
| Projected in-service date | Install a 50MVAr Capacitor Bank at Panther Springs Substation ERCOT project 109982 · utility no. S-XXXX · RPG 25RPG013 and 25RPG017 | Dec 2029 → Jan 2032 | Panther Springs |
| Projected in-service date | Construct a new CPS Owned switchyard construction and gen tie to accommodate connection to the HUISACHE BESS & SOLAR generation site ERCOT project 109984 · utility no. S-XXXX · RPG 25RPG013 and 25RPG017 | Dec 2029 → Jan 2032 | None named |
| Projected in-service date | Rebuild Castle to Dresden 138kV Transmission Line ERCOT project 109992 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017 | Dec 2029 → Jan 2032 | Castle, Dresden |
| Projected in-service date | Install Voss Lake 345/138 kV Auto #2 ERCOT project 110016 · utility no. R6551 | Dec 2028 → Dec 2029 | Voss Lake |
| Projected in-service date | This models the new CEHE Raider Substation and upgrades required for a proposed load addition Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service. ERCOT project 110068A | Oct 2026 → May 2027 | Raider, Cedar Creek, Bailey |
| Projected in-service date | This models the new CEHE Raider Substation and upgrades required for a proposed load addition Loop 345 kV Ckt. 64 Wolf-Hillje line into the new 345 kV CEHE Raider substation. Upgrade line relaying on Ckt 64 WOLF-Raider-Hillje. ERCOT project 110068B | Oct 2028 → May 2029 | Raider, Wolf, Hillje |
| Projected in-service date | Bowman 345 kV Switch Capacitor Bank ERCOT project 110178 · utility no. M3568 | May 2028 → Dec 2029 | Bowman Switch |
| Projected in-service date | Rio Hondo to Bonilla: Rebuild/Reconductor 345 kV Line Rebuild/Reconductor Rio Hondo to Bonilla 345 kV line ERCOT project 110437 | Jun 2028 → May 2028 | Rio Hondo, Bonilla |
| Projected in-service date | Molina: Add Capacitor Install additional reactive support at Molina 138 kV station ERCOT project 110439 | Nov 2027 → Feb 2028 | Molina |
| Projected in-service date | Rio Bravo: Add Capacitor Install additional reactive support at Rio Bravo 138 kV station ERCOT project 110441 | Nov 2027 → Feb 2028 | Rio Bravo |
| Projected in-service date | STEC Rodgers Large Load Phase 3 -Upgrade CPS Martinez 345/138kV autos 1,2 to 683 MVA -Rebuild CPS Howard to Spruce 345kV to 1580MVA - Rebuild CPS Howard to Braunig to 1457 MVA -Upgrade CPS Hill Country 345/138kV autos 3,4 to 740MVA rating - Rebuild CPS Cachena to Elmcreek to 1250MVA ERCOT project 110529 · RPG 25RPG046 | Jul 2031 → Dec 2030 | Howard, Spruce |
| Projected in-service date | Paris Switch - Valley Switch 138 kV Line Paris Switch - Valley Switch 138 kV Line Upgrade ERCOT project 110647 · utility no. M3323 · RPG 25RPG040 · RTP 2024-NC31 | Aug 2033 → May 2033 | Paris Switch, Valley Switch |
| Projected in-service date | Handley - Hemphill 138 kV Line Upgrade existing line ERCOT project 4270 · utility no. M5214 | May 2028 → May 2029 | Handley, Hemphill |
| Projected in-service date | Fincas: Build new 138 kV distribution station Construct new distribution station on the University to Wormser 138 kV line ERCOT project 48774 · utility no. 3765 | Jul 2026 → Jun 2026 | Fincas |
| Projected in-service date | Ballinger: Rebuild 138 kV Station Rehab the 138/69 kV autotransformer at Ballinger ERCOT project 48818 · utility no. 2777 | Jul 2027 → Jun 2027 | Ballinger |
| Projected in-service date | Port Isabel: Rebuild As GIS Station Rebuild Port Isabel as a GIS ERCOT project 49550 · utility no. 3716 | Oct 2027 → Mar 2029 | Port Isabel |
| Projected in-service date | Ozona: Rebuild 69 kV station Replace existing Ozona 69 kV station with a new 69 kV ring bus ERCOT project 49556 · utility no. 2780 | Mar 2028 → Jan 2029 | Ozona |
| Projected in-service date | Mantle: Construct New 345 kV Station ERCOT project 49564 · utility no. 3774 TP2018166 | May 2027 → Jan 2029 | Mantle |
| Projected in-service date | Port Lavaca: Station Rebuild (Cangrejo) Rebuild the Port Lavaca (Cangrejo) station ERCOT project 50890 · utility no. 3787 TA2019045 · RPG 21RPG002 | Jun 2026 → Sep 2026 | Port Lavaca |
| Projected in-service date | Alamito Creek to Ft. Davis: Rebuild 69 kV Line Alamito Creek to Ft. Davis: Rebuild 69 kV line ERCOT project 52464 · utility no. 2831 | Sep 2027 → Mar 2028 | Alamito Creek, Ft Davis |
| Projected in-service date | Eden to North Brady: Rebuild 69 kV line Rehab Eden to North Brady 69 kV line ERCOT project 54892 · utility no. 1856 · RPG 22RPG009 | Nov 2027 → Sep 2028 | Eden, North Brady |
| Projected in-service date | Brushline: Construct New Distribution Station Construct new 138/13 kV station Brushline ERCOT project 55550 · utility no. 3826 | Dec 2027 → Jul 2028 | Brushline |
| Projected in-service date | Escondido to Ganso: Rebuild 138 kV line Rebuild 138 kV line from Escondido to Ganso ERCOT project 55624 · utility no. 3825 | Feb 2028 → Sep 2028 | Escondido, Ganso |
| Projected in-service date | Ganso to Hamilton Road: Rebuild 138 kV line Rebuild 138 kV line from Ganso to Hamilton Road ERCOT project 55626 · utility no. 3824 · RPG 22RPG044 | Feb 2028 → Sep 2028 | Maverick, Hamilton Road |
| Projected in-service date | North McAllen: Rebuild 138 kV Station Rehab the North McAllen 138 kV station ERCOT project 58010 · utility no. 3837 | Apr 2027 → Sep 2028 | McAllen |
| Projected in-service date | Corichi to Victoria: Rebuild 138 kV Line Rebuild the Corichi to Victoria 138 kV line ERCOT project 59086 · utility no. TP2020888 | Jan 2029 → Nov 2029 | Corichi, Victoria |
| Projected in-service date | RGEC Persimmon Gap Substation 69-kV Transmission Line Extension and Substation Expansion Extend Alpine-Persimmon Gap 69-kV Transmission Line at Switch# 6669 and Install Circuit Switcher to accommodate new substation power transformer and distribution bays. New power transformer capacity will be 12/16/20 MVA. ERCOT project 61232 | Jan 2027 → Dec 2027 | Persimmon Gap |
| Projected in-service date | Portilla: Construct New Distribution Station Construct new distribution station on the Lon Hill to Warburton 138 kV line ERCOT project 61394 · utility no. DP21X0008 | Jun 2026 → Dec 2026 | Portilla |
| Projected in-service date | GVEC Kicaster Substation Addition (formerly Wilson South) Add a new load-serving substation 4.35 miles south of La Vernia along FM 775 with a 40 MVA PWT. ERCOT project 61444 | Sep 2026 → Oct 2026 | Wilson South |
| Projected in-service date | Clark Church/Birdhouse (Ottine New) Substation Build New 138 Substation adjacent to LCRA Birdhouse station; replaces existing Ottine station, add 20MVA ERCOT project 61449 | Jul 2027 → Dec 2027 | Ottine |
| Projected in-service date | East Munday to Lake Pauline: Rebuild 138 kV Line Rehab East Munday to Lake Pauline 138 kV line ERCOT project 61550 · utility no. 1874 · RPG 20RPG018 | Apr 2030 → May 2029 | East Munday, Lake Pauline |
| Projected in-service date | Matador to Turkey: Rebuild 69 kV Line Rebuild 69 kV line from Matador to Turkey ERCOT project 61552 · utility no. 1873 | Jul 2026 → May 2026 | Matador, Turkey |
| Projected in-service date | Barrilla Junction: 69 kV Loop Rebuild Rebuild Barrilla Junction to Saragosa to Cherry Creek to Verhalen to Hoefs Road stations, convert to 138 kV ERCOT project 64042 · utility no. 1886 · RPG 21RPG023 | Mar 2027 → Nov 2026 | Barrilla Junction, Hoefs Road Station |
| Projected in-service date | Bessel to King Ranch: 138 kV Line Rebuild Rehab the Bessel to King Ranch 138 kV line ERCOT project 64067 · utility no. TA2020081 · RPG 23RPG001 | Feb 2029 → Jun 2028 | Bessel, Stratton |
| Projected in-service date | Hyde Park to Downtown Ckt.32A Upgrades Upgrade Hyde Park to Downtown Ckt.32A ERCOT project 64499 | Dec 2026 → Feb 2027 | Downtown, Hyde Park |
| Projected in-service date | Mason Switch to Yellowjacket: Rebuild 69 kV Line Rehab the Mason Switch to Yellowjacket 69 kV Line ERCOT project 65154 · utility no. 2836 · RPG 21RPG014 | Dec 2027 → Feb 2028 | Mason Switch, Yellowjacket |
| Projected in-service date | Rebuild/reconductor portions of Ckt.05A Missouri City to Sienna as a Hardening upgrade(24RPG030). Rebuild and reconductor portion of Missouri City to Sienna Ckt.05A as a Hardening upgrade ERCOT project 65719 · RPG 24RPG030 | Oct 2026 → Feb 2027 | Missouri City, Sienna |
| Projected in-service date | Ballinger to Eden 69 kV line: Rebuild taps Rebuild Taps on the Ballinger to Eden 69 kV line ERCOT project 6572 · utility no. 2814 | Jul 2027 → Jun 2027 | Ballinger, Eden |
| Projected in-service date | Del Sol to Frontera: Build New 345 kV Double Circuit Line Build new 345 kV double circuit line from Del Sol to Frontera. Expand Frontera Station and install two (2) autotransformers. ERCOT project 66101 · utility no. TP2020838 · RPG 21RPG017 | Sep 2026 → Oct 2026 | Del Sol, Frontera |
| Projected in-service date | East Levee - Industrial Blvd 138 kV DCKT Line Rebuild East Levee - Industrial Blvd 138 kV DCKT Line ERCOT project 66190 · utility no. M4213 | May 2027 → Dec 2027 | East Levee, Industrial |
| Projected in-service date | Upgrade Palestine-Crockett 69 kV Line Rebuild the Elkhart - Grapeland 69 kV Line ERCOT project 66202B · utility no. R6182 · RPG 22RPG035 | Sep 2026 → Dec 2026 | Elkhart, Grapeland |
| Projected in-service date | Cruce to Reforzar: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Cruce to Reforzar ERCOT project 67320 · utility no. TP2022033 · RPG 21RPG017 | Sep 2026 → Oct 2026 | Cruce, Reforzar |
| Projected in-service date | Ajo to Reforzar: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Ajo to Reforzar ERCOT project 67326 · utility no. TP2022030 · RPG 21RPG017 | Aug 2026 → Sep 2026 | Ajo, Reforzar |
| Projected in-service date | San Miguel to Cruce 345 kV lines New San Miguel to Cruce 345 kV double circuit lines ERCOT project 67329 · RPG 21RPG017 | Dec 2026 → Jan 2027 | San Miguel, Cruce |
| Projected in-service date | Rosata: Build 138kV Substation Build new Rosata 138 kV POD Switch on the Coleto Creek to Kenedy 138 kV line ERCOT project 6749 · utility no. 3682 | Jun 2026 → May 2026 | Rosata |
| Projected in-service date | Shepley: Construct New Distribution Station Construct new distribution station on the Victoria to Dupont Switch 138 kV line ERCOT project 69489 | Jul 2026 → Nov 2026 | Shepley |
| Projected in-service date | New 138kV Brushy Creek Substation ERCOT project 70282 | Jun 2027 → Jun 2028 | Thompson Creek, Snook |
| Projected in-service date | New Holleman Substation ERCOT project 70299 | Jun 2027 → Jun 2028 | Holleman |
| Projected in-service date | BRYN_Standard_PMCR_Dansby_Rebuild_fix Reference Project 4577 which was added to convert Dansby 69kV bus to Breaker and a Half configuration ERCOT project 70307A | Jun 2027 → Jun 2029 | None named |
| Projected in-service date | BRYN_Standard_PMCR_Dansby_Rebuild_fix ERCOT project 70307B | Jun 2027 → Jun 2029 | None named |
| Projected in-service date | Ballinger to Santa Anna: Rebuild 69 kV line Rebuild 69 kV line and rebuild taps on the Ballinger to Santa Anna 69 kV line. ERCOT project 70630 · utility no. TA2021193 · RPG 22RPG028 | Feb 2030 → Mar 2029 | Ballinger, Santa Anna |
| Projected in-service date | Plaza to Grant Ckt.08I Upgrade Install parallel underground portion of Ckt.08I Plaza to Grant to increase thermal limits. ERCOT project 70660 | Jul 2026 → Aug 2026 | Plaza, Grant |
| Projected in-service date | Clairmont Sun Oil Tap: Rebuild 69 kV Line Rehab Clairmont Sun Oil Tap 69 kV Line ERCOT project 70673 · utility no. TA2021233 | Oct 2028 → Jan 2028 | Clairmont, Sun Clairmont |
| Projected in-service date | Tungsten (Carbide): Rebuild 138/69 kV Station Rehab the Tungsten (Carbide) 138/69 kV station ERCOT project 70706 · RPG 21RPG024 | Dec 2027 → Aug 2028 | Tungsten |
| Projected in-service date | Rebuild Rio Colorado - Bay City Rebuild Rio Colorado - Bay City 795 ACSR ERCOT project 70884 | Aug 2026 → Sep 2026 | Rio Colorado, Bay City |
| Projected in-service date | Flomot Tap: Rebuild 69 kV Line Rehab Flomot Tap 69 kV Line ERCOT project 70898 | Jul 2026 → May 2026 | Flomot Tap, Flomot |
| Projected in-service date | Tidehaven: Construct New Distribution Station Construct new distribution station on the Blessing to Palacios 69 kV line ERCOT project 71002 · utility no. 3767 DP21X0007 | Apr 2027 → Nov 2027 | Tidehaven |
| Projected in-service date | Upgrade Pearsall Station Upgrade Pearsall Station equipment for full auto xfmr ratings. (Upgrade station to breaker and a half is complete) ERCOT project 71319 | Dec 2026 → Jun 2027 | Pearsall |
| Projected in-service date | Upgrade STEC castroville to Pearson to 138kV Upgrade STEC Bader station to 138kV. Upgrade STEC Castroville to bader and bader to pearson to 138kV ERCOT project 71917 · RPG 22RPG022 | Jun 2026 → Nov 2026 | Bader |
| Projected in-service date | Clute 138kV Switching Station Reconfigure existing Ckt.82F RIWOOD to CAVERN to BIPORT and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.82 RIWOOD to Clute to CAVERN to BIPORT. ERCOT project 72044A · RPG 22RPG038 | Dec 2027 → Mar 2028 | Clute, RIWOOD, CAVERN |
| Projected in-service date | Clute 138kV Switching Station Reconfigure existing Ckt.26D STRATT to SINTEK and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.26 STRATT to Clute to SINTEK. ERCOT project 72044C · RPG 22RPG038 | Dec 2027 → Mar 2028 | Clute, SINTEK |
| Projected in-service date | Cedar Hill: Upgrade Relays Upgrade relays for the Sterling City terminal and Miles terminal at the Cedar Hill 138 kV station ERCOT project 72213 · utility no. TP2022739 | Mar 2027 → May 2027 | Cedar Hill |
| Projected in-service date | Haskell to Munday: Rebuild 69 kV Line Rehab Haskell to Munday 69 kV Line ERCOT project 72999 · RPG 22RPG043 | Oct 2028 → Jan 2029 | Haskell, Munday |
| Projected in-service date | Truscott Humble Tap: Rebuild 69 kV Line Rehab Truscott Humble Tap 69 kV line ERCOT project 73001 | Nov 2031 → Dec 2031 | Moorhouse, Truscott Humble |
| Projected in-service date | Mulberry Creek: Rebuild 138 kV Station Rebuild Mulberry Creek 138 kV station ERCOT project 73032 · RPG 25RPG034 | Feb 2027 → Nov 2027 | Mulberry Creek |
| Projected in-service date | Barrera: Construct New Distribution Station Construct new distribution station on the North Laredo Switch to Reveille 138 kV line ERCOT project 73059 | Nov 2026 → Aug 2027 | Barrera |
| Projected in-service date | Big Foot to Lytle: Convert to 138 kV Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station ERCOT project 73063 · utility no. TP2022155 | Nov 2026 → Feb 2027 | Big Foot, Lytle |
| Projected in-service date | Marina: Construct New Station Construct new network station on the Highway 9 to Morris St and Nueces Bay 138 kV lines ERCOT project 73067 | Feb 2027 → Nov 2027 | Marina |
| Projected in-service date | Castroville Cut-in 138 kV Cut the AEP line from Quihi to CPS Castroville into the newly converted to 138 kV STEC Castroville station. ERCOT project 73098 · RPG 22RPG022 | Nov 2026 → May 2027 | Quihi, Castroville (CPS) |
| Projected in-service date | Asherton to Piloncillo: Rebuild 138 kV Line Rehab the Asherton to Piloncillo 138 kV line ERCOT project 73100 | Dec 2027 → Jan 2028 | Asherton, Piloncillo |
| Projected in-service date | PH Robinson Area 138kV Upgrades Increase thermal limits through the application of 110% Emergency ratings for Ckt.79C BIGBAY to BAYOU. Request customers to approve the 110% Emergency rating of relevant equipment at Bigbay substation on the Ckt.79C line position. Bayou substation equipment has been upgraded and meets the Minimum ratings as of April 2025. ERCOT project 73352C | Jul 2026 → Dec 2026 | BIGBAY, BAYOU |
| Projected in-service date | Berry Creek Substation Addition Substation addition to provide Point of Interconnection for Oncor Andice substation addition. ERCOT project 73567 | Dec 2028 → May 2029 | Berry Creek |
| Projected in-service date | Steger Substation Addition Substation addition to provide Point of Interconnection for Oncor New Sweden substation addition. ERCOT project 73570 | May 2028 → May 2029 | Steger |
| Projected in-service date | This converts Bell County to Gabriel to 138 KV ERCOT project 75524 | Dec 2026 → Nov 2027 | Bell County, Gabriel |
| Projected in-service date | Install new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar Install new 345kV Speedway (SPD) substation for generator interconnection to CRADLE/ Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. ERCOT project 75810A | May 2027 → Aug 2027 | Speedway, DOW, Oasis |
| Projected in-service date | Install new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar Install generator lead from Speedway (SPD) substation to CRADLE (CDL) customer substation (23INR0150). ERCOT project 75810B | May 2027 → Aug 2027 | Speedway, CRADLE |
| Projected in-service date | Rebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A. Rebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion. ERCOT project 75856A | Mar 2027 → Aug 2027 | ETHYL, South Channel |
| Projected in-service date | Rebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A. Convert ETHYL customer 69kV substation to 138kV. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A. ERCOT project 75856B | Mar 2027 → Aug 2027 | ETHYL, PHILIP, BEARLE |
| Projected in-service date | Union Carbide: Rebuild 138 kV Station Rebuild Union Carbide as new AIS station Chalybe ERCOT project 76082 | May 2027 → Aug 2028 | Union Carbide |
| Projected in-service date | Lobo: 138 kV Breaker Replacement Replace 138 kV breakers at the Lobo 138 kV station ERCOT project 76196 · utility no. TP2023015 | May 2027 → May 2028 | Lobo |
| Projected in-service date | Lytle: Construct New 138 kV Terminal Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station ERCOT project 76242 · utility no. TP2022155 | Nov 2026 → Feb 2027 | Lytle |
| Projected in-service date | Hecker to Resnik: Rebuild 138 kV Line Rebuild the Hecker to Resnik 138 kV line ERCOT project 76286 · utility no. TP2023506 | Jul 2026 → Feb 2028 | Hecker, Resnik |
| Projected in-service date | Upgraded Cedarvale–BoneSpringsTap–Fishhook ERCOT project 76291 | Oct 2027 → Jul 2027 | Cedarvale to Bone Springs Tap, Bone Springs Tap to Fishhook |
| Projected in-service date | Upgraded Cedvale-MiDiva138KV ERCOT project 76293 | Oct 2027 → Apr 2027 | Cerdarvale, Midiva |
| Projected in-service date | Asherton: Rebuild 138 kV station Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station ERCOT project 76569 · RPG 23RPG007 | Aug 2027 → May 2027 | Asherton |
| Projected in-service date | Upgrade Victoria-Rayburn Upgrade Victoria- Loop 463- Rayburn to 403 MVA ERCOT project 76788 | Dec 2026 → Mar 2026 | Rayburn, Victoria |
| Projected in-service date | Ocelot: Construct New 138 kV Station Interconnect the Ocelot load to the new Ocelot 138 kV station on the Military Highway to Palo Alto 138 kV line ERCOT project 76914 | Oct 2026 → Mar 2027 | Ocelot |
| Projected in-service date | Las Lomas: Construct New Distribution Station Construct new distribution station on the La Grulla to Rio Grande City 138 kV line ERCOT project 77031 · utility no. DP24X0003 | Nov 2027 → Mar 2029 | Las Lomas |
| Projected in-service date | Pompano: New 138 kV Station Final Station ERCOT project 77144B · utility no. TP2015151 | Jan 2028 → Mar 2028 | Pompano |
| Projected in-service date | Hays Hill (fka Rock Draw) 345 kV Switch Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013) ERCOT project 78044 · utility no. R8716 · RPG 23RPG013 | May 2027 → Dec 2027 | Sand Lake, North McCamey |
| Projected in-service date | Blue Goose (fka Toyah Creek) 345 kV Switch Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013) ERCOT project 78046 · utility no. R8715 · RPG 23RPG013 | Dec 2027 → May 2027 | Sand Lake, Solstice |
| Projected in-service date | West Columbia to Damon and Needville to Big Creek Ckt.89A Upgrades Rebuild/reconductor portions of West Columbia to Damon Ckt.89A as a Hardening upgrade. ERCOT project 78461A · RPG 23RPG021 | Dec 2027 → May 2028 | West Columbia, Damon |
| Projected in-service date | Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102) New 345kV Pradera (PRD) substation for generator interconnection to Austin Bayou Solar (25INR0102). Loop Ckt.27 into Pradera substation to create new Ckt.27 Seabreeze to Pradera to Savannah. ERCOT project 78468A | Sep 2027 → Jan 2028 | Pradera, Savannah, Seabreeze |
| Projected in-service date | Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102) Install generator lead from Pradera (PRD) substation to AUSTIN (ABY) customer substation (25INR0102). ERCOT project 78468B | Sep 2027 → Jan 2028 | Pradera, AUSTIN |
| Projected in-service date | Rebuild Oaks to Poteet to Pearsall 69 kV line Rebuild Oaks to Poteet to Pearsall 69 kV line from 4/0 to 795. 2023 RTP ERCOT project 78478 | Oct 2026 → Dec 2026 | Oaks, Pearsall |
| Projected in-service date | Rebuild Nada to El Campo 69 kV line Rebuild Nada to El Campo 69 kV line from 4/0 to 795. 2023 RTP ERCOT project 78483 | Jul 2026 → Sep 2026 | Nada, El Campo |
| Projected in-service date | Britmoore to Bellaire Ckt.24B Upgrades Upgrade Ckt.24B Hayes to Britmoore to increase thermal limits. ERCOT project 78485F · RPG 23RPG025 | Jul 2026 → Aug 2026 | Hayes, Britmoore |
| Projected in-service date | Loop new Ancla CEHE 138kV substation into Ckt.04E Angleton to West Columbia to create new Ckt.04 Angleton to Ancla to West Columbia. Install one generator lead from Ancla CEHE 138kV substation to ROYAL / Royal River BESS. Install one generator lead from Ancla CEHE 138kV substation to ROYAL / Royal River BESS. ERCOT project 79451B | Oct 2027 → Jun 2028 | Ancla, ROYAL |
| Projected in-service date | Lucero: Construct New 345 kV Station Interconnect SanPat Solar I and SanPat Solar II to the new Lucero 345 kV station on the Angstrom to Naismith 345 kV line ERCOT project 79988 | Nov 2026 → Sep 2027 | Lucero |
| Projected in-service date | Big Foot to Pearsall: Convert to 138 kV Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch ERCOT project 80315 · utility no. 3821 · RPG 23RPG024 | Dec 2027 → Feb 2028 | Big Foot, Pearsall |
| Projected in-service date | Dilley Switch to Pearsall: Convert to 138 kV, Reroute from Dilley to Dilley Switch, Rebuild Dilley to Dilley Switch 69 kV, and Double Circuit Dilley Switch to Pearsall with Dilley to Dilley Switch Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch ERCOT project 80317 · utility no. 3822 · RPG 23RPG024 | Dec 2027 → Feb 2028 | Dilley Switch, Pearsall |
| Projected in-service date | Devine: Install Cap Bank Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch ERCOT project 80319 · utility no. TA2018040 · RPG 23RPG024 | Dec 2026 → Feb 2028 | Devine |
| Projected in-service date | No title printed Reroute East to Rodgers 69kV line to create East to Rayburn 69kV line to accommodate the TXDOT SH6 project. ERCOT project 80404 | Jan 2027 → Apr 2027 | BRYN EAST, RAYBURN |
| Projected in-service date | No title printed Rebuild / Reconductor Greens Prairie to South Switch 138kV Line ERCOT project 80420 | Jun 2027 → Jun 2028 | South Switch, Greens Pairie |
| Projected in-service date | Add_Triangle_Park_Load Adding second distribution transformer at Triangle Park ERCOT project 80422 | Jan 2027 → Jun 2027 | Triangle Park |
| Projected in-service date | No title printed Rebuild / Reconductor Dansby to Business Park 69kV for Rail Spur ERCOT project 80424 | Jun 2027 → Jun 2028 | Dansby, Business Park |
| Projected in-service date | Closner: Construct New 138 kV Terminal Interconnect Gunnar BESS to the Closner 138 kV station ERCOT project 80484 | Jun 2026 → Nov 2026 | Closner |
| Projected in-service date | Upgrade the Hutto & Round Rock - Salado 138 kV Line Rebuild and double-circuit the Georgetown East - Sonterra 138 kV Line Section ERCOT project 80546C · utility no. R6203, R6202 · RPG 24RPG018, 25RPG006 · RTP 2023-SC17 | Dec 2026 → May 2027 | Georgetown East, Sonterra |
| Projected in-service date | Chalmers: Construct New Distribution Station Construct new distribution station on the Lane City to Magill 138 kV line ERCOT project 80576 | Aug 2027 → Oct 2027 | Chalmers |
| Projected in-service date | Angstrom to STP: Increase 345 kV Line MOT Increase the MOT on the Angstrom to STP 345 kV line ERCOT project 80630 | Jun 2026 → Nov 2026 | Angstrom, STP |
| Projected in-service date | Lon Hill to Sinton: Bypass Waterworks 69 kV station Relocate portion of 69 kV line between Odem and Stevens Tap to bypass Waterworks 69 kV station ERCOT project 80850 | Oct 2027 → Dec 2027 | Odem, Stevens Tap |
| Projected in-service date | Sterling City: Upgrade 69 kV Relays Upgrade relays at the Sterling City 69 kV station on the Angora 69 kV terminal ERCOT project 80858 | Apr 2027 → Aug 2027 | Sterling City |
| Projected in-service date | Fort Stockton Plant: Rebuild 138/69 kV Station Rebuild the Fort Stockton Plant 138/69 kV station ERCOT project 80907 · RPG 25RPG032 | Nov 2027 → Apr 2028 | Fort Stockton Plant |
| Projected in-service date | DIABOX Customer Load Addition with related line upgrades Upgrade Ckt.21E MOMENT to SOLMER to SR Bertron to increase thermal limits ERCOT project 81006 | Jul 2026 → Aug 2026 | SOLMER, SR Bertron, MOMENT |
| Projected in-service date | Buford (fka China Grove) to Tributary 138 kV Line Rebuild Rebuild Buford (fka China Grove) to Tributary 138 kV Line Rebuild ERCOT project 81152 · utility no. R8656 · RPG 26RPG010 | May 2027 → Oct 2027 | Rebuild Buford (fka China Grove), Tributary Switch |
| Projected in-service date | Oklaunion: Reconfigure 138 kV Station Reconfigure the Oklaunion 138 kV station from a straight bus to a ring bus ERCOT project 81215 | Nov 2026 → May 2027 | Oklaunion |
| Projected in-service date | Zoisite: Construct New 345 kV Station and 345 kV Lines to STP Interconnect the HIF load to the new Zoisite 345 kV station and construct two new STP to Zoisite 345 kV lines. Install two (2) capacitor banks. ERCOT project 81238 · utility no. TP2023803 | May 2028 → Dec 2028 | STP, Zoisite |
| Projected in-service date | Rio Pecos: Upgrade 138 kV Terminals Upgrade the Soaptree and Whitebaker 138 kV terminals at the Rio Pecos 138 kV station ERCOT project 81368 | Mar 2027 → Dec 2026 | Rio Pecos |
| Projected in-service date | Oncor_FW_81410_Averitt Synchronous Condenser Add Averitt Switch Synchronous Condenser ERCOT project 81410 · utility no. D20231 · RPG 23RPG029 | Mar 2027 → Aug 2026 | Averitt |
| Projected in-service date | Rio Medina substation Adds Rio Medina Load serving station ERCOT project 81590 | Jan 2027 → Nov 2026 | Rio Medina |
| Projected in-service date | Dunlay substation Adds STEC Dunlay Load serving station ERCOT project 81594 | Jul 2026 → Nov 2026 | Dunlay |
| Projected in-service date | Olmos to LaVernia TL, T533 Olmos to LaVernia TL, Rebuild 5.1 miles of 69 kV line to 138 kV transmission line ERCOT project 85955 | Dec 2028 → May 2028 | Olmos, LaVernia |
| Projected in-service date | RGEC_Altuda 69-kV In-line_Breaker_Installation Install 69-kV breaker between Alpine Switch and Persimmon Gap substation at Altuda substation. ERCOT project 85965 | Dec 2026 → Dec 2027 | Alpr2A, PrsmnGap2A |
| Projected in-service date | Expand ADLONG substation for XE Murat Storage (24INR0329) Expand facilities at customer-owned ADLONG substation for XE Murat Storage (24INR0329). Utilize existing generator lead Eastgate to XE Murat Solar. ERCOT project 86009 | Jul 2026 → Aug 2026 | Eastgate, ADLONG |
| Projected in-service date | Snug 138kV Substation expansion for Cottonwood Bayou Storage (21INR0443) Install Cottonwood Bayou Storage (21INR0443) at Snug 138kV substation. Connect at the same generator lead as Cottonwood Bayou Solar. ERCOT project 86011 | Jul 2026 → Aug 2026 | Snug |
| Projected in-service date | Scissortail: Construct New 138 kV Station Interconnect the TNMP Flycatcher station to the new Scissortail 138 kV station on the Saragosa to Solstice 138 kV line between Hoef's Road and Verhalen ERCOT project 86771 | Dec 2026 → Mar 2027 | Scissortail |
| Projected in-service date | Add Dansk load serving substation Cuts in new Dansk load serving station on existing Red Bluff to Danevang transmission line ERCOT project 86782 | Dec 2026 → Apr 2027 | None named |
| Projected in-service date | Buccaneer: Construct New 69 kV Station Interconnect the Oncor Regency station to the new Buccaneer 69 kV station on the Eden to North Brady 69 kV line between Melvin and North Brady ERCOT project 86796 | Dec 2026 → Jan 2027 | Buccaneer |
| Projected in-service date | Saragosa: Construct New 138 kV Terminal Interconnect Bracero Pecan Storage to the Saragosa 138 kV station ERCOT project 86884 | Apr 2027 → Apr 2028 | Saragosa, Bracero Pecan |
| Projected in-service date | Primavera: Construct New 138 kV Terminal Interconnect Project Lynx Storage to the Primavera 138 kV station ERCOT project 87031 · utility no. TP2024100 | Jun 2026 → Mar 2026 | Primavera |
| Projected in-service date | Establish Fallstown Switch – Pleasant Valley/Fisher Road 138 kV Double-Circuit Line and Fallstown Switch – Ceramic/Wichita Falls PPG 138 kV Double-Circuit Line ERCOT project 87413 · utility no. R4024 | Feb 2027 → Dec 2026 | Fallstown Switch, Pleasant Valley, Fisher Road |
| Projected in-service date | Carver to Poblano: Convert 69 kV Line to 138 kV Convert the Sonora to Uvalde 69 kV line to 138 kV and reterminate at Carver and Poblano ERCOT project 87648 · utility no. TP2024058 · RPG 24RPG009 | Dec 2028 → Jan 2031 | Carver, Poblano |
| Projected in-service date | Bell County - Poage - Seaton 69 kV Line Conversion to 138 kV ERCOT project 87697 · utility no. R6367 · RPG 24RPG001 | May 2028 → Mar 2027 | Bell County, Seaton |
| Projected in-service date | Establish a 110.4 MVAR Capacitor Bank at Midnight 138 kV Substation ERCOT project 87770 · utility no. R6346 | May 2029 → May 2030 | Midnight |
| Projected in-service date | Olmos to Wilson T297 Transmission Line Rebuild Rebuild 7.18 miles of 138 kV from 477 conductor wood pole line to 795 drake conductor concrete/steel transmission line ERCOT project 89912 | Dec 2026 → May 2027 | Olmos, Wilson |
| Projected in-service date | Whaley 345kV Substation Expansion for ROSE/Rock Rose Energy BESS (26INR0201) Expand Whaley 345kV Substation for ROSE / Rock Rose Energy BESS (26INR0201). Connect generator through one new generator lead. ERCOT project 89922 | Oct 2027 → Mar 2027 | Waterhole |
| Projected in-service date | Upgrade San Diego - Orange Grove SW Upgrade San Diego - Orange Grove SW to 795 ACSR. 2024 RTP ERCOT project 90000 | May 2029 → Jun 2028 | San Diego, Orange Grove SW |
| Projected in-service date | Tango to Pawnee: Rebuild 345 kV Line Rebuild the Tango to Pawnee 345 kV line ERCOT project 90008 · utility no. TP2024118 · RPG 22RPG048 | Feb 2027 → May 2027 | Tango, Pawnee |
| Projected in-service date | Festin: Construct New 345 kV Station Interconnect Sunscape Renewable Solar and Storage to the new Festin 345 kV station on the Lon Hill to Reforzar 345 kV line ERCOT project 90025 · utility no. TP2024111 | May 2028 → Jul 2028 | Festin |
| Projected in-service date | Cross Plains to Rising Star: Rebuild 69 kV Line Rehab the Cross Plains to Rising Star 69 kV line ERCOT project 90027 | May 2029 → May 2030 | Cross Plains, Rising Star |
| Projected in-service date | Edith Clarke: Expand 345 kV Station Interconnect Seine BESS to the existing Edith Clarke 345 kV station ERCOT project 90035 · utility no. TP2024193 | Jul 2027 → Dec 2027 | Edith Clarke |
| Projected in-service date | Dokmai: Construct New 138 kV Station Interconnect Hyfuels Western Farmland Wind to the new Dokmai 138 kV station on the Cangrejo to Dacosta 138 kV line between Beecher and Cangrejo ERCOT project 90053 · utility no. TP2024120 | Mar 2027 → Oct 2027 | Dokmai |
| Projected in-service date | Cascabel: Construct New 345 kV Station Interconnect Moccasin Solar to the new Cascabel 345 kV station on the Clear Crossing to Figaro 345 kV line between Clear Crossing and Kirchoff ERCOT project 90059 · utility no. TP2024121 | Dec 2026 → Jan 2027 | Cascabel |
| Projected in-service date | Abilene Northwest to Mulberry Creek: Rebuild 138 kV Line Rebuild the Abilene Northwest to Mulberry Creek 138 kV line ERCOT project 90065 · utility no. TP2023881 | Nov 2026 → Jan 2027 | Abilene Northwest, Mulberry Creek |
| Projected in-service date | Install new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers. Install new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers. Loop substation on Ckt.81G to create new Ckt.81G Pinehurst to Mill Creek to Tomball. ERCOT project 90161A | Oct 2027 → Dec 2027 | Mill Creek, Pinehurst, Tomball |
| Projected in-service date | Install new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers. Convert Pinehurst to unity power factor substation. ERCOT project 90161C | Dec 2026 → Dec 2027 | Pinehurst |
| Projected in-service date | Facility Ratings Methodology (FRM) Upgrades Upgrade Ckt.03A PSARCO to BIGVUE to increase thermal limits as part of FRM upgrades ERCOT project 90232A | Jul 2026 → Aug 2026 | PSARCO, BIGVUE |
| Projected in-service date | Facility Ratings Methodology (FRM) Upgrades Upgrade Ckt.06D NASA to Webster to increase thermal limits as part of FRM upgrades ERCOT project 90232C | Jul 2026 → Aug 2026 | NASA, Webster |
| Projected in-service date | Facility Ratings Methodology (FRM) Upgrades Upgrade Bellaire to WAP Ckt.50A to increase thermal limits as part of FRM upgrades ERCOT project 90232D | Jul 2026 → Aug 2026 | Bellaire, WA Parish |
| Projected in-service date | Facility Ratings Methodology (FRM) Upgrades Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits as part of FRM upgrades ERCOT project 90232E | Jul 2026 → Sep 2026 | Jeanetta, WA Parish |
| Projected in-service date | Facility Ratings Methodology (FRM) Upgrades Upgrade Bellaire to Jeanetta Ckt.64B to increase thermal limits as part of FRM upgrades ERCOT project 90232F | Jul 2026 → Aug 2026 | Bellaire, Jeanetta |
| Projected in-service date | Facility Ratings Methodology (FRM) Upgrades Upgrade Stadium to Fannin Ckt.08B to increase thermal limits as part of FRM upgrades ERCOT project 90232G | Jul 2026 → Aug 2026 | Stadium, Fannin |
| Projected in-service date | Jordan / Mont Belvieu Area Improvement Project Upgrade Ckt.86H BRINE to Mont Belvieu to increase thermal limits. ERCOT project 90255D · RPG 24RPG026 | Mar 2028 → Apr 2028 | BRINE, Mont Belvieu |
| Projected in-service date | Fisk 345 kV Switch Construct a new 345 kV Switch. ERCOT project 91108 · utility no. R6328 | Apr 2027 → Aug 2027 | Brown Switch, Central Bluff |
| Projected in-service date | White Mule (fka Elmar) 138 kV Substation Reconfiguration Construct a new White Mule (fka Elmar) 138 kV Substation on the Quarry Field - Border 138 kV Line ERCOT project 91664 · utility no. R8804 | Jan 2027 → Dec 2026 | White Mule |
| Projected in-service date | Install (1) 40 MVAr switchable cap bank at Hockley substation. ERCOT project 91713 | Dec 2027 → May 2027 | Hockley |
| Projected in-service date | East Munday: Rebuild 138 kV Station Rebuild the East Munday 138 kV station ERCOT project 91843 · utility no. TP2023800 · RPG 25RPG002 | May 2027 → May 2028 | East Munday |
| Projected in-service date | Fort Stockton Plant to Solstice: Rebuild 138 kV Line Rebuild the Fort Stockton Plant to Solstice 138 kV line and retire the PST at Solstice ERCOT project 91853 · utility no. TP2025145 · RPG H.B. 5066 | Nov 2029 → Nov 2028 | Fort Stockton Plant, Solstice |
| Projected in-service date | La Palma to Stillman: Rebuild 138 kV Line Rebuild the La Palma to Stillman 138 kV line ERCOT project 91883 · utility no. TP2025011 · RPG 24RPG008 | May 2028 → May 2030 | La Palma, Stillman |
| Projected in-service date | La Palma to Military Highway: Rebuild 138 kV Line Rebuild the La Palma to Military Highway 138 kV line ERCOT project 91896 · utility no. TP2025011 · RPG 24RPG008 | May 2028 → May 2030 | La Palma, Military Highway |
| Projected in-service date | Iowa: Construct New Distribution Station Construct new distribution station on the Bates to Liston 138 kV line ERCOT project 91903 | Oct 2028 → Feb 2029 | Iowa |
| Projected in-service date | Carver to Friend Ranch: Rebuild 138 kV Line Rebuild the Carver to Friend Ranch 138 kV line ERCOT project 91906 · utility no. TP2025168 · RPG H.B. 5066 | May 2028 → Nov 2028 | Carver, Friend Ranch |
| Projected in-service date | Cryo to Faulkner: Construct New 138 kV Line Construct a new 138 kV single circuit line from Cryo to Faulkner ERCOT project 91937 · utility no. TP2025146 · RPG H.B. 5066 | Jan 2029 → Aug 2029 | Cryo, Faulkner |
| Projected in-service date | Solstice to Bottlebrush: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Solstice to Bottlebrush ERCOT project 91939 · utility no. TP2024076 · RPG H.B. 5066 | Dec 2030 → Nov 2029 | Solstice, Bottlebrush |
| Projected in-service date | Chelsea 138 kV Switch ERCOT project 92625 · utility no. M5019 | Jun 2026 → May 2027 | Chelsea Switch |
| Projected in-service date | Jersey 138 kV Switch ERCOT project 92655 · utility no. M3343 | Aug 2026 → Dec 2026 | Jersey Switch |
| Projected in-service date | Renner Switch – Plano West Switch 138 kV Double-Circuit Line Upgrade Renner Switch – Plano West Switch 138 kV Double-Circuit Line ERCOT project 92867 · utility no. M4246 | May 2029 → Dec 2029 | Renner, Plano West |
| Projected in-service date | Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV Double-Circuit Line Rebuild 345 kV Double-Circuit Line Rebuild Add Permian Basin Reliability Plan Upgrade ID L24A. LCRA and Oncor joint project to add L24A Upgrade the existing Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV double-circuit line ERCOT project 93088A · utility no. PB_L24_A | Jun 2028 → Dec 2027 | Cattleman, Longshore |
| Projected in-service date | Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV Double-Circuit Line Rebuild 345 kV Double-Circuit Line Rebuild Add Permian Basin Reliability Plan Upgrade ID L24A. LCRA and Oncor joint project to add L24A Upgrade the existing Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV double-circuit line ERCOT project 93088B · utility no. PB_L24_A | May 2030 → Jun 2028 | Cattleman, Longshore |
| Projected in-service date | Lueders: Construct New Distribution Station Construct new distribution station on the Fort Phantom to Paint Creek 138 kV line between California Creek and Fort Phantom ERCOT project 93127 · utility no. DR23N0002 | Nov 2026 → Dec 2026 | Lueders |
| Projected in-service date | Diablo: Construct New Distribution Station Construct new distribution station on the North McCamey to Palouse 138 kV line between Crossover and Palouse ERCOT project 93163 · utility no. DR24N0002 | May 2027 → Feb 2028 | Diablo |
| Projected in-service date | Bent Tree 138 kV Substation Establish Bent Tree 138 kV Substation with 55.2 MVAR capacitor bank using 3-18.4 MVAR stages ERCOT project 93191 · utility no. R6388 | Dec 2026 → May 2027 | Bent Tree Substation |
| Projected in-service date | Solstice to Hayter Tap: Rebuild 138 kV Line Double Circuit Rebuild the Solstice to Hayter Tap 138 kV line as a double circuit ERCOT project 98561 · RPG H.B. 5066 | May 2028 → Nov 2028 | Solstice, Hayter Tap |
| Projected in-service date | Oso Creek to Westside: Construct New 138 kV Line Construct a new 138 kV single circuit line from Oso Creek to Westside ERCOT project 98569 · utility no. TP2025225 | May 2029 → Jun 2029 | Oso Creek, Westside |
| Projected in-service date | Quanah: Rebuild 69 kV Station Rehab Quanah 69 kV station ERCOT project 98593 · utility no. TA2018027 | Dec 2026 → Jan 2027 | Quanah |
| Projected in-service date | Solstice to Howard: Construct New 765 kV Single Circuit Line Construct a new 765 kV single circuit line from Solstice to Howard ERCOT project 98595 · RPG H.B. 5066 | Jan 2029 → Oct 2030 | Solstice, Howard |
| Projected in-service date | Plover: Rebuild 69 kV Station Rebuild Eldorado Cities Service Co. Tap and rename to Plover ERCOT project 98612 | Dec 2026 → Jun 2027 | Plover |
| Projected in-service date | Dotterel: Rebuild 69 kV Station Rebuild Middle Valley REA Tap and rename to Dotterel ERCOT project 98616 | Dec 2026 → Jun 2027 | Dotterel |
| Projected in-service date | Claror: Construct New 345 kV Station Interconnect Bigway Solar I and II to the new Claror 345 kV station on the Edith Clarke to Cottonwood 345 kV line ERCOT project 98802 · utility no. TP2025175 | May 2027 → Oct 2027 | Claror |
| Projected in-service date | BRYN_99100_RELLIS_CAPS Install first 54 MVAr (in three 18 MVAr stages) 138-kV capacitor bank at RELLIS ERCOT project 99100A · RPG 25RPG001 | Jun 2027 → Jun 2028 | RELLIS |
| Projected in-service date | BRYN_99100_RELLIS_CAPS Install second 54 MVAr (in three 18 MVAr stages) 138-kV capacitor bank at RELLIS ERCOT project 99100B · RPG 25RPG001 | Jun 2027 → Jun 2028 | RELLIS |
| Projected in-service date | BRYN_99117_ATK-TAMU_UPGRADE Re-build the existing Atkins to TAMU 138-kV single-circuit transmission line on double-circuit capable structures with one circuit in place with normal and emergency ratings of at least 495 MVA and 521 MVA, respectively, approximately 3.3-mile. ERCOT project 99117 · RPG 25RPG001 | Oct 2029 → Oct 2030 | Atkins, TAMU |
| Projected in-service date | Rebuild Flower Grove - Vincent 138 kV Line Rebuild Upgrade the existing Flower Grove - Vincent 138 kV Line Section ERCOT project 99141 · utility no. R8736 | Dec 2028 → Dec 2029 | Flower Grove, Vincent |
| Projected in-service date | TH Wharton CB2 Cap Bank Remove 120 MVAR CB1 cap bank from Velasco substation. Install removed CB1 cap bank at TH Wharton substation as replacement for THW CB2. ERCOT project 99399 | Jul 2026 → Aug 2026 | Velasco, TH Wharton |
| Projected in-service date | Daybreak_Substation_Addition Substation addition to provide Point of Interconnection for Oncor's Good Morning substation addition. Requires coordination with Oncor. ERCOT project 99411 | Dec 2026 → Dec 2029 | Daybreak, Good Morning |
| Projected in-service date | Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.69B Greens Bayou to Deepwater to increase thermal limits as part of FRM2 upgrades ERCOT project 99453B | Dec 2026 → Mar 2028 | Greens Bayou, Deepwater |
| Projected in-service date | Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.97B King to North Belt to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453E | Oct 2026 → May 2027 | King, North Belt |
| Projected in-service date | Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.97C Jordan to King to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453H | Jul 2026 → Nov 2026 | Jordan, King |
| Projected in-service date | Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.02B WA Parish to Nash to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453I | Jul 2026 → Nov 2026 | WA Parish, Nash |
| Projected in-service date | Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.75H King to Rothwood to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453M | Jul 2026 → Aug 2026 | King, Rothwood |
| Projected in-service date | Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.62B Waterhole to Jones Creek to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453P | Oct 2026 → Nov 2026 | Waterhole, Jones Creek |
| Projected in-service date | Deep Creek - Snyder - China Grove 138 kV Line Rebuild Add Permian Basin Reliability Plan Upgrade ID L22E. Upgrade the existing Deep Creek - China Grove 138-kV line ERCOT project 99530 · utility no. PB_L22_E | Dec 2028 → Oct 2028 | Deep Creek, China Grove |
| Projected in-service date | Establish Guthrie 138 kV Switch Establish 138 kV Switch ERCOT project 99532 · utility no. R8916 | May 2027 → May 2028 | Big Spring Switch, Tributary |
| Projected in-service date | Establish Belltown 138 kV Switch ERCOT project 99605 · utility no. R6414 | May 2028 → May 2030 | Belltown 138 kV Switch |
| Projected in-service date | Upgrade Redland Switch - Herty Tap 138 kV Line Section ERCOT project 99624 · utility no. R6291 | Dec 2027 → May 2027 | Redland 138 kV Switch, Herty Tap |
| Projected in-service date | Static: Expand 345 kV Station Install two 345 kV breakers at the existing Static 345 kV station ERCOT project 99641 · utility no. TP2025246 | Jun 2026 → Oct 2026 | Static |
| Projected in-service date | Laredo VFT North: 138 kV Breaker Addition Install additional 138 kV breaker on the Lobo circuit #1 138 kV terminal at the Laredo VFT North 138 kV station ERCOT project 99744 | Jun 2026 → Apr 2026 | Laredo VFT North |
| Projected in-service date | Additional Facility Ratings Methodology Phase 2 (FRM2) Substation Upgrades. Upgrade Ckt.79C BIGBAY to BAYOU to increase thermal limits as part of FRM2 upgrades. ERCOT project 99791B | Jul 2026 → Dec 2026 | BIGBAY, BAYOU |
| Projected in-service date | Frontera: 138 kV Breaker Replacement Replace 138 kV breakers at the Frontera 138 kV station ERCOT project 99794 · utility no. TP2025213 | Mar 2028 → Nov 2028 | Frontera |
| Projected in-service date | Boiken: Construct New 345 kV Station Interconnect Lancium data center load to the new Boiken 345 kV station on the Tesla to Tule Canyon 345 kV line ERCOT project 99825 · utility no. TP2025947 | Jun 2028 → Apr 2028 | Boiken |
| Projected in-service date | Kirkland 138 kV Capacitor Bank ERCOT project 99941 · utility no. M4022 | Dec 2026 → May 2027 | Kirkland |
Every release
| Data as of | Workbook | Projects | First listed | Date changes | Tab moves | No longer listed |
|---|---|---|---|---|---|---|
| October 1, 2026 | ERCOT-October-TPIT-No-Cost-100126.xlsx | 2,203 | 115 | 250 | 118 | 34 |
| July 13, 2026 | ERCOT-July-Ad-Hoc-TPIT-No-Cost-071326-UPDATE.xlsx | 2,122 | 44 | 99 | 15 | 4 |
| July 13, 2026 | ERCOT July Ad-Hoc TPIT No Cost 071326.xlsx from ERCOT’s archive |
2,082 | 404 | 148 | 58 | 11 |
| June 1, 2026 | ERCOT June TPIT No Cost 060126.xlsx from ERCOT’s archive |
1,689 | 258 | 212 | 101 | 24 |
| February 1, 2026 | ERCOT-February-TPIT-No-Cost-020126.xlsx from ERCOT’s archive |
1,455 | 58 | 366 | 416 | 28 +260 off Completed |
| October 1, 2025 | ERCOT-October-TPIT-No-Cost-100125.xlsx from ERCOT’s archive |
1,685 | 318 | 305 | 93 | 10 +4 off Completed |
| June 1, 2025 | ERCOT-June-TPIT-No-Cost-060125.xlsx from ERCOT’s archive |
1,381 | 200 | 140 | 299 | 24 +77 off Completed |
| February 1, 2025 | ERCOT February TPIT No Cost 020125.xlsx from ERCOT’s archive |
1,282 | 110 | 315 | 110 | 21 +202 off Completed |
| October 1, 2024 | ERCOT-October-TPIT-No-Cost-100124.xlsx from ERCOT’s archive |
1,395 | 200 | 262 | 60 | 7 +1 off Completed |
| June 1, 2024 | ERCOT-June-TPIT-No-Cost-060124.xlsx from ERCOT’s archive |
1,203 | 169 | 255 | 163 | 17 |
| February 1, 2024 | ERCOT-February-TPIT-No-Cost-020124.xlsx from ERCOT’s archive |
1,051 | 75 | 347 | 154 | 19 +220 off Completed |
| October 1, 2023 | ERCOT-October-TPIT-No-Cost-100123.xlsx from ERCOT’s archive |
1,215 | 143 | 204 | 105 | 17 +2 off Completed |
| May 12, 2023 | ERCOT-May-TPIT-No-Cost-051223.xlsx from ERCOT’s archive |
1,091 | 145 | 223 | 42 | 34 +1 off Completed |
| February 1, 2023 | ERCOT-February-TPIT-No-Cost-020123.xlsx from ERCOT’s archive |
981 | 90 | 158 | 94 | 32 +243 off Completed |
| October 1, 2022 | ERCOT October TPIT No Cost 100122.xlsx from ERCOT’s archive |
1,166 | 139 | 215 | 72 | 17 +4 off Completed |
| June 1, 2022 | ERCOT June TPIT No Cost 060122.xlsx from ERCOT’s archive |
1,048 | 124 | 106 | 159 | 6 +2 off Completed |
| February 1, 2022 | ERCOT_February_TPIT_No_Cost_020122.xlsx from ERCOT’s archive |
932 | 89 | 183 | 97 | 12 +231 off Completed |
| October 1, 2021 | ERCOT_October_TPIT_No_Cost_100121.xlsx from ERCOT’s archive |
1,086 | 99 | 129 | 61 | 17 +1 off Completed |
| June 1, 2021 | ERCOT_June_TPIT_No_Cost_060121.xlsx from ERCOT’s archive |
1,005 | 113 | 137 | 142 | 8 |
| February 1, 2021 | ERCOT_February_TPIT_No_Cost_020121.xlsx from ERCOT’s archive |
900 | 78 | 224 | 104 | 22 +249 off Completed |
| October 1, 2020 | ERCOT_October_TPIT_No_Cost_100120.xlsx from ERCOT’s archive |
1,093 | 67 | 124 | 46 | 4 +1 off Completed |
| June 1, 2020 | ERCOT_June_TPIT_No_Cost_060120.xlsx from ERCOT’s archive |
1,031 | 89 | 169 | 111 | 23 +1 off Completed |
| February 1, 2020 | ERCOT_February_TPIT_No_Cost_020120.xlsx from ERCOT’s archive |
966 | 124 | 249 | 121 | 16 +242 off Completed |
| October 1, 2019 | ERCOT October TPIT No Cost 100119.xlsx from ERCOT’s archive |
1,100 | 80 | 133 | 63 | 3 +3 off Completed |
| June 1, 2019 | ERCOT_June_TPIT_No_Cost_060119_.xlsx from ERCOT’s archive |
1,026 | 0 | 2 | 0 | 0 |
| June 1, 2019 | ERCOT_June_TPIT_No_Cost_060119_old.xlsx from ERCOT’s archive |
1,026 | 95 | 211 | 127 | 12 +1 off Completed |
| February 1, 2019 | ERCOT_February_TPIT_No_Cost_020119.xlsx from ERCOT’s archive |
944 | 121 | 276 | 99 | 40 +160 off Completed |
| October 1, 2018 | ERCOT_October_TPIT_No_Cost_100118.xlsx from ERCOT’s archive |
1,023 | 66 | 127 | 51 | 12 +12 off Completed |
| June 1, 2018 | ERCOT_June_TPIT_No_Cost_060118.xlsx from ERCOT’s archive |
981 | 98 | 151 | 102 | 12 +1 off Completed |
| February 1, 2018 | ERCOT February TPIT No Cost 020118.xlsx from ERCOT’s archive |
896 | 82 | 219 | 75 | 32 +223 off Completed |
| October 1, 2017 | ERCOT October TPIT No Cost 100117.xlsx from ERCOT’s archive |
1,069 | 40 | 153 | 46 | 6 +1 off Completed |
| June 1, 2017 | ERCOT June TPIT No Cost 060117.xlsx from ERCOT’s archive |
1,036 | 114 | 143 | 112 | 15 +1 off Completed |
| February 1, 2017 | ERCOT February TPIT No Cost 020117.xlsx from ERCOT’s archive |
938 | 153 | 166 | 69 | 24 +194 off Completed |
| October 1, 2016 | ERCOT October TPIT No Cost 100116.xlsx from ERCOT’s archive |
1,003 | 35 | 138 | 81 | 9 +2 off Completed |
| June 1, 2016 | ERCOT June TPIT No Cost 060116.xlsx from ERCOT’s archive |
979 | 120 | 164 | 114 | 67 +1 off Completed |
| February 1, 2016 | ERCOT February TPIT No Cost 020116.xlsx from ERCOT’s archive |
927 | 120 | 200 | 91 | 102 +180 off Completed |
| October 1, 2015 | ERCOT October TPIT No Cost 100115.xlsx from ERCOT’s archive |
1,089 | 52 | 147 | 63 | 9 +3 off Completed |
| June 1, 2015 | ERCOT June TPIT No Cost 060115.xlsx from ERCOT’s archive |
1,049 | 135 | 221 | 101 | 28 +4 off Completed |
| February 1, 2015 | ERCOT February TPIT No Cost 020115.xlsx from ERCOT’s archive |
946 | baseline |
Counts compare each release with the one before it. ERCOT’s Completed tab keeps recent completions only, so each new year’s first release drops the older ones; those are counted separately as “off Completed.” A project that is no longer listed is reported as exactly that, not as cancelled.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.