Substation Scout

Changes in the latest release

The release with data as of October 1, 2026 (ERCOT-October-TPIT-No-Cost-100126.xlsx), compared with the release before it. 115 projects listed for the first time, 118 moved between tabs, 99 status changes, 250 projected in-service dates changed, and 34 no longer listed.

Projects no longer listed are counted, not shown: the current workbook has no row for them. Absence is not a cancellation.

What changedProjectPrinted valuesSubstations named
First listedAdd Cochise customer sub.
ERCOT project 100408
on the Current-year planned tabNone named
First listedMonticello Switch - Allen Switch 345 kV Double-Circuit Line
Upgrade Monticello Switch - Allen Switch 345 kV Double-Circuit Line
ERCOT project 109824 · utility no. M3317 · RPG 25RPG040, 25RPG042 · RTP 2024-E9
on the Future tabMonticello Switch, Allen Switch
First listedInstall Morton 138/35kV Distribution Substation with double-tap service.
Install Morton 138/35kV Distribution Substation with double-tap service. Tap Ckt.09H to create new Ckt.09H Katy to Morton to Franz
ERCOT project 110075A
on the Future tabMorton, Katy, Franz
First listedInstall Morton 138/35kV Distribution Substation with double-tap service.
Install Morton 138/35kV Distribution Substation with double-tap service. Tap Ckt.09K to create new Ckt.09K Village Creek to Morton to Franz.
ERCOT project 110075B
on the Future tabMorton, Village Creek, Franz
First listedJewett Switch - Greene Switch 345 kV Double-Circuit Line
Establish Jewett Switch - Greene Switch 345 kV Double-Circuit Line
ERCOT project 110381 · utility no. M4428 · RPG 25RPG042 · RTP 2024-NC63
on the Future tabGreene Switch, Jewett Switch
First listedAdd Quantum 345 kV Switch
Connect Quantum 345 kV Switch to the existing Longshore - Cattleman Switch 345 kV line, approximately 13 miles Southwest of Colorado City, TX off of CR 365.
ERCOT project 110819
on the Future tabQuantum, Connect Quantum, Cattleman, Longshore
First listedCooke County Resiliency Project
Construct a new breaker station “Bulcher” near Bulcher, TX Construct a new transmission line from Bulcher to Capps Corner Construct a new transmission line from Bulcher to Sivell’s Bend
ERCOT project 110943A · RPG 26RPG007
on the Future tabNone named
First listedCooke County Resiliency Project
Rebuild the Sivells Bend Tap to Sivell’s bend transmission line
ERCOT project 110943B · RPG 26RPG007
on the Future tabNone named
First listedCooke County Resiliency Project
Rebuild the St Jo to Capps Corner transmission line Rebuild the Capps Corner to Nocona Transmission Line Rebuild the Nocona to Alcorn Transmission Line Construct a new transmission line from Bulcher to Alcorn
ERCOT project 110943C · RPG 26RPG007
on the Future tabNone named
First listedCooke County Resiliency Project
Convert existing 69 kV line from Gainesville to St Jo to 138 kV operation including: Gainesville, (future) Bud Long, (future) Hinton, Red River, (future) Gateway, (future) Army Camp, Sivells Bend, (future) Bulcher, Capps Corner, Nocona, Alcorn and St Jo
ERCOT project 110943D · RPG 26RPG007
on the Future tabNone named
First listedCooke County Resiliency Project
ERCOT project 110943E · RPG 26RPG007
on the Future tabGainesville, Sivells Bend
First listedInstall new 138/35 kV Lee Road Distribution Substation.
Install Lee Road 138/35kV Distribution Substation. Loop on existing circuit as Ckt.66D Humble to Lee Road to Treaschwig.
ERCOT project 111043A
on the Future tabLee Road, Humble, Treaschwig
First listedInstall new 138/35 kV Lee Road Distribution Substation.
Upgrade Ckt.66D Treaschwig to Westfield to increase thermal limits.
ERCOT project 111043B
on the Future tabTreaschwig, Westfield
First listedCruce: Expand 345 kV Station
Interconnect the Duval Data Center load to the Cruce 345 kV station
ERCOT project 111116
on the Future tabCruce
First listedLCRATSC Webberville Power Transformer Addition
LCRA TSC will improve reliability at the Webberville Substation by installing a second power transformer. New circuit breakers and switches shall meet LCRA TSC minimum 138-kV design standards.
ERCOT project 111193
on the Future tabWebberville
First listedStainback 345 kV Capacitor Bank
ERCOT project 111207 · utility no. M5017
on the Future tabStainback 345 kV Switch
First listedTynan: Expand 69 kV Station
Interconnect Honeycomb Solar and Storage to the Tynan 69 kV station
ERCOT project 111219 · utility no. TP2023005
on the Current-year planned tabTynan
First listedAngstrom: Expand 345 kV Station
Interconnect the Ripper Industrial load to the existing Angstrom 345 kV station
ERCOT project 111221 · utility no. TP2026123
on the Future tabAngstrom
First listedOncor_MW_62445_BaseCamp(FKA_EglMnt)_138kV_SwitchRebuild
Rebuild existing Eagle Mountain 345/138 kV Switch and rename to Base Camp 345/138 kV Switch
ERCOT project 111223 · utility no. M5261 · RPG 22RPG039
on the Current-year planned tabBase Camp
First listedLCRATSC Crosswinds Goforth Transmission Line Overhaul
Perform an overhaul on the 3 mile T661 Crosswinds - Goforth 138kV transmission line.
ERCOT project 111240
on the Future tabCrosswinds, Goforth
First listedLCRATSC Crosswinds Turnersville Transmission Line Overhaul
Perform an overhaul on the 3.8 mile T272 Crosswinds - Turnersville transmission line.
ERCOT project 111242
on the Future tabCrosswinds, Turnersville
First listedGillespie - Fredericksburg - Goehmann Lane - Kendall Transmission Line Overhaul
ERCOT project 111245A
on the Future tabGillespie, Goehmann Lane
First listedGillespie - Fredericksburg - Goehmann Lane - Kendall Transmission Line Overhaul
ERCOT project 111245B
on the Future tabGoehmann Lane, Kendall
First listedElmdale: Install capacitor bank
Install a new capacitor bank at the Elmdale 69 kV station
ERCOT project 111248 · utility no. TP2026164
on the Future tabElmdale
First listedNewby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)
Loop new Newby (NBY) 345kV CEHE Substation into Ckt.74 to create new Ckt.74 Jewett to Newby to Limestone. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.74 Newby to Limestone.
ERCOT project 111258A
on the Future tabNewby, Jewett, Limestone
First listedNewby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)
Loop new Newby (NBY) 345kV CEHE Substation into Ckt.98 to create new Ckt.98 Limestone to Newby to Jewett. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.98 Newby to Limestone.
ERCOT project 111258B
on the Future tabNewby, Limestone, Jewett
First listedNewby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)
Install dual generator leads from Newby (NBY) 345kV CEHE Substation to customer-owned Dewey Prairie - DEWEY_ (DWP)
ERCOT project 111258C
on the Future tabNewby, DEWEY
First listedFort Stockton Switch: Construct New 138 kV Terminal
Construct a new 138 kV terminal at Fort Stockton Switch for the new TNMP line to Woodhouse
ERCOT project 111270 · RPG 23RPG023
on the Future tabFort Stockton Switch
First listedSolstice: Construct New 765 kV Station
Construct the new Solstice 765 kV station and Install two 765/345 kV autotransformers and two 765 kV shunt reactors
ERCOT project 111276 · utility no. TP2024146 · RPG H.B. 5066
on the Future tabSolstice
First listedChappell Hill - Waller Transmission Line Overhaul
Perform an overhaul on the 16 mile T232 Chappell Hill - Waller transmission line replacing conductor with single-Suwannee.
ERCOT project 111280 · utility no. PLC-8346
on the Future tabChappell Hill, Waller
First listedHunt - Turtle Creek Transmission Line Storm Hardening
LCRA will replace the conductor between Hunt and Turtle Creek as part of an effort to rebuild and storm harden the circuit resulting in greater durability and reliability of assets in the area.
ERCOT project 111282 · utility no. PLC-8473
on the Future tabHunt, Turtle Creek
First listedHarligen SW: Expand 138 kV Station
Interconnect the Power Proof Properties load to the existing Harligen SW 138 kV station
ERCOT project 111302 · utility no. TP2026149
on the Future tabHarligen SW
First listedGoddard: Expand 345 kV Station
Interconnect Bayou Creek Solar to the existing Goddard 345 kV Statiom
ERCOT project 111305 · utility no. TP2026163
on the Future tabGoddard
First listedResnik: Epand 138 kV Station
Interconnect Gregory Power Partners (GPP) to the Existing Resnik 138 kV Station
ERCOT project 111307 · utility no. TP2026170
on the Future tabResnik
First listedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits.
ERCOT project 111323A · RTP 26RPG006
on the Future tabHOPSON, WARVUE
First listedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits.
ERCOT project 111323B · RTP 26RPG006
on the Future tabDALTON, BRINE
First listedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.03G Lyondell to Channelview (distribution) to Channelview (ring bus) in order to increase thermal limits.
ERCOT project 111323C · RTP 26RPG006
on the Future tabLyondell, Channelview
First listedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.08 Hermann to Grant to increase thermal limits.
ERCOT project 111323D · RTP 26RPG006
on the Future tabHermann, Grant
First listedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.06L Plaza to Knight to Gulfgate to increase thermal limits.
ERCOT project 111323E · RTP 26RPG006
on the Future tabPlaza, Gulfgate
First listedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.73B Britmoore to Woodcreek to Memorial to Westheimer in order to increase thermal limits.
ERCOT project 111323F · RTP 26RPG006
on the Future tabBritmoore, Westheimer
First listedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits.
ERCOT project 111323G · RTP 26RPG006
on the Future tabPH Robinson, HUNTER
First listedUpgrades related to the Baytown Area Load Addition
Install (3) 7.2 MVAR distribution cap banks at Bayway substation.
ERCOT project 111323H · RTP 26RPG006
on the Future tabBayway
First listedUpgrades related to the Baytown Area Load Addition
Install (1) 60 MVAR cap bank at Mykawa substation.
ERCOT project 111323I · RTP 26RPG006
on the Future tabMykawa
First listedUpgrades related to the Baytown Area Load Addition
Install (1) 60 MVAR switchable cap bank at Humble substation.
ERCOT project 111323J · RTP 26RPG006
on the Future tabHumble
First listedUpgrades related to the Baytown Area Load Addition
Install (2) 14.4 MVAR distribution cap banks at Treaschwig substation.
ERCOT project 111323K · RTP 26RPG006
on the Future tabTreaschwig
First listedJacaranda to Paulownia (Oncor): Construct two new 345 kV lines
Construct two new 345 kV lines between Jacaranda and Paulownia (Oncor)
ERCOT project 111346 · utility no. TP2026088
on the Future tabJacaranda, Paulownia
First listedDry Hollow: Construct New Switch Station
Interconnect CVEC's Hog Creek substation to the new Dry Hollow 69 kV switch station on the Redbo to Eola Tap 69 kV line
ERCOT project 111348 · utility no. TP2026180
on the Future tabDry Hollow
First listedSpecter: Construct New Switch Station
Interconnect TEC's Rainey substation to the new Specter 138 kV switch station on the Abilene Plant to Putnam 138 kV line
ERCOT project 111350 · utility no. TP2026164
on the Future tabSpecter
First listedOncor_FW_Ward - Barnsley 69 kV Line Conversion to 138 kV
Convert Ward - Barnsley 69 kV Line to 138 kV
ERCOT project 111353 · utility no. R8923
on the Future tabWard, Barnsley Sub
First listedLST_OpenSky_Second_Ckt_Loopin
Loop 2nd 345 kV circuit into Open Sky Station to support 25INR0473 project
ERCOT project 111357
on the Future tabPhantom Hill, Claytonville
First listedAdd Portsouth loop in Southmost - Waterport
ERCOT project 111361 · RPG 25RPG039
on the Future tabPORTSOUTH
First listedInstall new 138kV transmission loop and substation
ERCOT project 111364
on the Future tabNone named
First listedHairpin Portsouth HWY511 to Chalybe
ERCOT project 111370 · RPG 25RPG039
on the Future tabPORTSOUTH
First listedLCRATSC Cedar Hill Power Transformer Addition
This project will add a second power transformer (T2) to Cedar Hill substation.
ERCOT project 111372
on the Future tabCedar Hill
First listedGliese: Construct New 138 kV Station
Interconnect the Valverde load to the new Gliese 138 kV Station on the Hamilton Road to Picacho 138 kV line
ERCOT project 111374 · utility no. TP2026120
on the Future tabGliese
First listedAdd Boca Chica and double ckt to portsouth
ERCOT project 111376 · RPG 25RPG039
on the Future tabBoca Chica, PORTSOUTH
First listedLCRATSC Giddings Winchester Transmission Line Overhaul
This project performs an overhaul on the T222 Giddings - Winchester 138-kV transmission line.
ERCOT project 111378
on the Future tabGiddings, Winchester
First listedLittlestar 138 kV Switch
Establish new 138 kV Switch
ERCOT project 111417 · utility no. R8978
on the Future tabLittle Star
First listedUpgrade Driscoll - San Diego
Upgrade Driscoll - Central - Ben Bolt - San Diego
ERCOT project 111459
on the Future tabDriscoll, San Diego
First listedLCRATSC Warda Generator Circuit Breaker Addition
This project installs a new 138-kV circuit breaker and associated terminal equipment at the Warda Substation, in a ring bus configuration, to provide a new 138-kV Point of Interconnection to Staccato Storage.
ERCOT project 111495
on the Current-year planned tabWarda
First listedNBU Comal Substation Breaker and a Half Upgrade
In conjunction with LCRA's Breaker and a Half upgrade at Comal Substation, NBU will upgrade the T335 line terminal and three transformer terminals.
ERCOT project 111533
on the Future tabComal, Loop 337
First listedLCRATSC Gillespie Nimitz Storm Hardening
LCRA will replace the conductor between Gillespie and Nimitz (T266) as part of an effort to rebuild and harden the circuit resulting in greater durability and reliability of assets in the area.
ERCOT project 111604 · utility no. PLC-8473
on the Future tabGillespie, Nimitz
First listedGVEC FM725 Substation Addition
GVEC is adding a new 138 kV substation 2.5 Miles Northwest of the McQueeney Substation, cutting into T498, to serve a 40 MVA load added to the area.
ERCOT project 111644
on the Future tabMcQueeney, Schumansville
First listedSunrise 138 kV Switch
Establish Sunrise 138 kV Switch
ERCOT project 111702 · utility no. M5018
on the Future tabSunrise Switch
First listedGossip 345 kV Switch
Establish Gossip 345 kV Switch
ERCOT project 111724 · utility no. M43505
on the Future tabGossip Switch
First listedEstablish Iron Crest 138 kV Switch
ERCOT project 111794 · utility no. R6440
on the Future tabIron Crest 138 kV Switch
First listedEstablish Massey Lake 138 kV Switch
ERCOT project 111796 · utility no. R6400
on the Current-year planned tabMassey Lake 138 kV Switch
First listedEstablish Wingate 345 kV Switch
ERCOT project 111798 · utility no. R6464
on the Future tabWingate 345 kV Switch
First listedSaltdome Capacitor 2nd step addition
ERCOT project 111822
on the Future tabSaltdome
First listedEstablish Caroline Creek 138 kV Switch
ERCOT project 111870 · utility no. R6543
on the Future tabCaroline Creek 138 kV Switch
First listedBinkley 138 kV Switch
ERCOT project 111952 · utility no. M3367
on the Future tabBinkley Switch
First listedThis is a new planned substation project
BPUB has a planned new substation project that will be between our existing Waterport Substation and STEC's Southmost Substation.
ERCOT project 111985
on the Future tabWaterport, Southmost
First listedUpgrade Batesville - Crystal City SW as part of Crystal City SW to Downie upgrade
ERCOT project 112127
on the Future tabBatesville, Crystal City SW
First listedUpgrade N.Batesville - S. Batesville - Batesville Sw
Upgrade N.Batesville - S. Batesville - Batesville Sw as part of Crystal City SW to Downie rebuild
ERCOT project 112129
on the Future tabN. Batesville, Batesville
First listedUpgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie
Upgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie as part of Crystal City SW to Downie rebuild
ERCOT project 112131
on the Future tabN. Batesville, Downie
First listedEast Watermill - Martin Lake 765 kV Line
Establish East Watermill - Martin Lake 765 kV Line
ERCOT project 112226 · utility no. M4458 · RPG 25RPG025
on the Future tabEast Watermill 765 kV Switch, Martin Lake 765 kV Switch
First listedAdds Farias load serving substation
ERCOT project 112229 · RPG 25RPG016
on the Future tabFARIAS
First listedModel Cowpen 138kV Substation
ERCOT project 112234
on the Future tabCowpen
First listedSouth Watermill - Bell East 765 kV Line
Establish South Watermill - Bell East 765 kV Line
ERCOT project 112322 · utility no. M4458 · RPG 25RPG025
on the Future tabSouth Watermill, Bell East
First listedSouth Watermill - Dinosaur 765 kV Line
Establish South Watermill - Dinosaur 765 kV Line
ERCOT project 112324 · utility no. M4460 · RPG 25RPG025
on the Future tabSouth Watermill, Dinosaur
First listedSouth Watermill - East Watermill 765 kV Line
Establish South Watermill - East Watermill 765 kV Line
ERCOT project 112326 · utility no. M4478 · RPG 25RPG025
on the Future tabSouth Watermill, East Watermill
First listedBRYN_Rayburn_Load_Addition
Adding second distribution transformer at Rayburn
ERCOT project 112454
on the Future tabRayburn
First listedDesoto 345/138 kV Switch Rebuild
ERCOT project 112560 · utility no. M4448 · RPG 25RPG004 · RTP 2024-NC80
on the Future tabDesoto Switch
First listedRemoval of 140MVAr SVC and facilities from Bellaire and Crosby 138kV substations.
Remove the 140MVAr SVC and facilities from Bellaire 138kV substation
ERCOT project 112585A
on the Future tabBellaire
First listedRemoval of 140MVAr SVC and facilities from Bellaire and Crosby 138kV substations.
Remove the 140MVAr SVC and facilities from Crosby 138kV substation
ERCOT project 112585B
on the Future tabCrosby
First listedHagansport 138 kV Switch
ERCOT project 112656 · utility no. M3333
on the Future tabHagansport Switch
First listedWETT Binturong 345 kV Station for Synchronous Condensers
ERCOT project 112684 · RPG 24RPG041
on the Future tabBearkat, Binturong
First listedWETT Buck Canyon 345 kV Station for Synchronous Condensers
ERCOT project 112691 · RPG 24RPG041
on the Future tabLong Draw, Buck Canyon
First listedWETT Pitchfork 345 kV Station for Synchronous Condensers
ERCOT project 112695 · RPG 25RPG005
on the Future tabCottonwood, Pitchfork
First listedFixes Islanded Pilot Point and energize load.
Adding two transmission lines from Pilot Point to Gunter Switch.
ERCOT project 113226
on the Current-year planned tabGunter
First listedOncor_MNW_113229_Cashion_Switch
Establish Cashion 345 kV Switch POI for Nymphaea
ERCOT project 113229
on the Future tabCashion
First listedOncor_MW_113288_Halsell_Switch
Establish Halsell 345 kV Switch (POI for Possum Kingdom Solar and Storage)
ERCOT project 113288
on the Future tabHalsell
First listedInstall new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (2) 300 MVAr switchable line reactors and 2-225MVAR bus reactors.
Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (1) 300 MVAr switchable line reactors and 2-225MVAR bus reactors.
ERCOT project 116019A
on the Future tabMorley
First listedInstall new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (2) 300 MVAr switchable line reactors and 2-225MVAR bus reactors.
Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (1) 300 MVAr switchable line reactors.
ERCOT project 116019B
on the Future tabMartin Lake
First listedTeal 345/138 kV Switch connected to LCRA POI (Limmer)
Teal 345 kV Switch, Autotransformers, and 345 kV Tie Lines to Limmer (LCRA)
ERCOT project 69552E · utility no. R6165 · RPG 22RPG027
on the Completed tabTeal
First listedCreate_GP_Solar_POI_Bus
Created GP Solar POI bus.
ERCOT project 70550
on the Future tabGlen Pine, Explorer
First listedRockhound - Connell 345 kV Double-Circuit Line
Rockhound - Sale Ranch 138 kV Double-Circuit Line
ERCOT project 73436A · utility no. R8718, R8807 · RPG 24RPG020
on the Current-year planned tabRockhound, Sale Ranch
First listedRockhound - Connell 345 kV Double-Circuit Line
ERCOT project 73436B · utility no. R8718, R8807 · RPG 24RPG020
on the Future tabRockhound, Connell
First listedSilverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG
Construct TNMP Silverleaf 345kV-138kV BAAH substation. Install three 750 MVA 345kV-138kV transformers. Cut both Pecos to Cedarvale 138kV lines and Bone Springs Tap 138kV line into Silverleaf 138kV bus. Construct three 345kV tie lines from TNMP Silverleaf 345kV to Oncor Rock Draw 345kV Switching Station (PMCR # 78044).
ERCOT project 77807A · RPG 23RPG013
on the Current-year planned tabSilverleaf, BAAH, Rock Draw, Pecos, Cedarvale
First listedSilverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG
ERCOT project 77807B · RPG 23RPG013
on the Current-year planned tabSilverleaf
First listedMobile substation
Project is to add a mobile substation next to Airport Substation tapping into the Transmission line that is Filter Plant to Airport Substation. Then connecting lines South Plant to Southmost by passing Airport Substation. This is due to Airport Substation being decommissioned in April.
ERCOT project 81726
on the Completed tab59420 Filter Plant, 59500 South Plant, Mobile substation, 5789 Southmost
First listedPMCR for Adding TNMP Woodhouse New Station
ERCOT project 82298A · RPG 23RTP023
on the Current-year planned tabWoodhouse
First listedPMCR for Adding TNMP Woodhouse New Station
ERCOT project 82298B · RPG 23RTP023
on the Current-year planned tabWoodhouse
First listedAdds TNMP White Oak Substation
New TNMP White Oak substation.
ERCOT project 82851A
on the Future tabWhite Oak
First listedAdds TNMP White Oak Substation
In-service Whiteoak bus and loads, and match CNP ISD date to interconnect together.
ERCOT project 82851B
on the Future tabWhite Oak
First listedALUVIUM gen tie station
ERCOT project 90903
on the Future tabNone named
First listedEstablish Drane 345 kV Switch
ERCOT project 91457A · utility no. R6410
on the Current-year planned tabDrane 345 kV Switch
First listedEstablish Drane 345 kV Switch
Drane 345 kV Switch Gen Tie
ERCOT project 91457B · utility no. R6410
on the Future tabDrane 345 kV Switch, Tormes Solar
First listedEstablish Tarantula 345 kV Switch
ERCOT project 91461A · utility no. R6412
on the Current-year planned tabTarantula 345 kV Switch
First listedEstablish Tarantula 345 kV Switch
Establish Tarantula 345 kV Switch Gen Tie
ERCOT project 91461B · utility no. R6412
on the Future tabTarantula 345 kV Switch, Tehuacana Creek Solar
First listedWhitebaker 345kV - Part of Upgrade L13 2024 Permian Basin Study
ERCOT project 92274 · utility no. PBRP Upgrade L13
on the Future tabNone named
First listedUtley_Substation_and_Transmission_Line_Addition
ERCOT project 93250A · utility no. PLC-8065
on the Future tabUtley
First listedUtley_Substation_and_Transmission_Line_Addition
ERCOT project 93250B · utility no. PLC-8065
on the Future tabUtley
First listedEstablish Baines Creek 138 kV Switch
ERCOT project 99544A · utility no. R6375
on the Current-year planned tabBaines Creek 138 kV Switch
First listedEstablish Baines Creek 138 kV Switch
Baines Creek 138 kV Switch Gen Tie
ERCOT project 99544B · utility no. R6375
on the Current-year planned tabBaines Creek 138 kV Switch, Bonham Solar I
Moved between tabsGristmill_Substation_Addition
LCRA TSC will construct a new Gristmill Substation to provide transformation service to a PEC-member load
ERCOT project 100165
Future → CancelledGristmill
Moved between tabsLST_SamSwitch_Resiliency_(GTC)_Project
This project loops Helix to Navarro Circuit into LST Sam Switch station
ERCOT project 102401 · RPG 25RPG031
Current-year planned → CompletedHelix, Navarro
Moved between tabsUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits.
ERCOT project 102546A · RTP 24RPG028
Future → CancelledHOPSON, WARVUE
Moved between tabsUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits.
ERCOT project 102546B · RTP 24RPG028
Future → CancelledDALTON, BRINE
Moved between tabsUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.03G Lyondell to Channelview (distribution) to Channelview (ring bus) in order to increase thermal limits.
ERCOT project 102546C · RTP 24RPG028
Future → CancelledLyondell, Channelview
Moved between tabsUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.08 Hermann to Grant to increase thermal limits.
ERCOT project 102546D · RTP 24RPG028
Future → CancelledHermann, Grant
Moved between tabsUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.06L Plaza to Knight to Gulfgate to increase thermal limits.
ERCOT project 102546E · RTP 24RPG028
Future → CancelledPlaza, Gulfgate
Moved between tabsUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.73B Britmoore to Woodcreek to Memorial to Westheimer in order to increase thermal limits.
ERCOT project 102546F · RTP 24RPG028
Future → CancelledBritmoore, Westheimer
Moved between tabsUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits.
ERCOT project 102546G · RTP 24RPG028
Future → CancelledPH Robinson, HUNTER
Moved between tabsUpgrades related to the Baytown Area Load Addition
Install (3) 7.2 MVAR distribution cap banks at Bayway substation.
ERCOT project 102546H · RTP 24RPG028
Future → CancelledBayway
Moved between tabsUpgrades related to the Baytown Area Load Addition
Install (1) 60 MVAR cap bank at Mykawa substation.
ERCOT project 102546I · RTP 24RPG028
Future → CancelledMykawa
Moved between tabsUpgrades related to the Baytown Area Load Addition
Install (1) 60 MVAR switchable cap bank at Humble substation.
ERCOT project 102546J · RTP 24RPG028
Future → CancelledHumble
Moved between tabsUpgrades related to the Baytown Area Load Addition
Install (2) 14.4 MVAR distribution cap banks at Treaschwig substation.
ERCOT project 102546K · RTP 24RPG028
Future → CancelledTreaschwig
Moved between tabsBRYN_ShadyLane_Rebuild
Rebuild Shady Lane into a ring bus configuration. MAY NEED TO DELETE THIS LATER IF IT CONFLICTS WITH A FUTURE NOMCR OR NMMS TOPOLOGY.
ERCOT project 103867
Current-year planned → FutureShady Lane
Moved between tabsEstablish Pathfinder 345 kV Switch
ERCOT project 104658A · utility no. R6364
Current-year planned → CompletedPathfinder
Moved between tabsWesternWind_Switch
Establish Western Wind Switch to interconnect Adamstown solar
ERCOT project 104830
Future → Current-year plannedKrum West Switch, Riley
Moved between tabsAngstrom: Expand 345 kV Station
Interconnect Alila Solar to the Angstrom 345 kV station
ERCOT project 109706 · utility no. TP2023019
Current-year planned → FutureAnsgtrom
Moved between tabsThis models the new CEHE Raider Substation and upgrades required for a proposed load addition
Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service.
ERCOT project 110068A
Current-year planned → FutureRaider, Cedar Creek, Bailey
Moved between tabsHawkins to Gainesville
ERCOT project 1275
Current-year planned → CompletedHawkins, Gainesville
Moved between tabsFincas: Build new 138 kV distribution station
Construct new distribution station on the University to Wormser 138 kV line
ERCOT project 48774 · utility no. 3765
Current-year planned → CompletedFincas
Moved between tabsMason to North Brady: Rebuild 69 kV line
Rehab Mason to North Brady 69 kV line
ERCOT project 50900 · utility no. 2794 · RPG 19RPG019
Current-year planned → CompletedMason, North Brady
Moved between tabsUpgrade Moore to Hondo Creek 138 kV line
Replace the 336 ACSR with 1020 ACCC conductor while keeping the existing structures that still meet our standards.
ERCOT project 55873 · RPG 19RPG021
Current-year planned → CompletedMoore, Hondo Creek
Moved between tabsMatador to Turkey: Rebuild 69 kV Line
Rebuild 69 kV line from Matador to Turkey
ERCOT project 61552 · utility no. 1873
Current-year planned → CompletedMatador, Turkey
Moved between tabsBarrilla Junction: 69 kV Loop Rebuild
Rebuild Barrilla Junction to Saragosa to Cherry Creek to Verhalen to Hoefs Road stations, convert to 138 kV
ERCOT project 64042 · utility no. 1886 · RPG 21RPG023
Future → Current-year plannedBarrilla Junction, Hoefs Road Station
Moved between tabsHyde Park to Downtown Ckt.32A Upgrades
Upgrade Hyde Park to Downtown Ckt.32A
ERCOT project 64499
Current-year planned → FutureDowntown, Hyde Park
Moved between tabsTo add Open Sky Station
To interconnect GINR 20INR0241
ERCOT project 65683
Current-year planned → CompletedOpen Sky
Moved between tabsRebuild/reconductor portions of Ckt.05A Missouri City to Sienna as a Hardening upgrade(24RPG030).
Rebuild and reconductor portion of Missouri City to Sienna Ckt.05A as a Hardening upgrade
ERCOT project 65719 · RPG 24RPG030
Current-year planned → FutureMissouri City, Sienna
Moved between tabsCedar Crest - Dealey - West Levee 138 kV Line
Upgrade the existing 138 kV Line
ERCOT project 66188 · utility no. M4212
Current-year planned → CompletedCeadr Crest, West Levee
Moved between tabsUpgrade Taylor - Holland 69 kV Line
Rebuild the Granger - Taylor 69 kV Line
ERCOT project 66200D · utility no. R6173 · RPG 22RPG036
Current-year planned → CompletedTaylor, Holland
Moved between tabsMesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line
Upgrade the Mesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line
ERCOT project 66473 · utility no. M4137
Current-year planned → CompletedMesquite East, Oates
Moved between tabsSan Miguel to Cruce 345 kV lines
New San Miguel to Cruce 345 kV double circuit lines
ERCOT project 67329 · RPG 21RPG017
Current-year planned → FutureSan Miguel, Cruce
Moved between tabsDupont to Resnik: Rebuild 138 kV Line
Rebuild the Dupont to Resnik 138 kV line
ERCOT project 69467
Current-year planned → CompletedDupont, Resnik
Moved between tabsJaguar: Construct New Distribution Station
Construct new distribution station on the McGruder to Thomaston 138 kV line
ERCOT project 69473
Current-year planned → CompletedJaguar
Moved between tabsCamp Elizabeth: Build new 69 kV station
Construct new 69 kV box bay station with capacitor bank on the College Hills West to Sterling City 69 kV line
ERCOT project 70305
Current-year planned → CancelledCamp Elizabeth
Moved between tabsRebuild Olivia - Carancahua
rebuild Olivia sw to Carancahua 795 ACSR
ERCOT project 70882
Current-year planned → CompletedOlivia SW, Carancahua
Moved between tabsFlomot Tap: Rebuild 69 kV Line
Rehab Flomot Tap 69 kV Line
ERCOT project 70898
Current-year planned → CompletedFlomot Tap, Flomot
Moved between tabsRoanoke Area Upgrades
Ramhorn Hill – Dunham 345 kV Double-Circuit Line
ERCOT project 70900E · utility no. M5281 M5144 M5146 M5148 · RPG 22RPG003
Current-year planned → CompletedDunham Switch, Ramhorn Switch
Moved between tabsDunlavy to HO Clarke Ckt.40A Partial Reconductor
Reconductor portions of Ckt.40A Dunlavy to HO Clarke ahead of future 138kV conversions
ERCOT project 71106 · RPG 22RPG019
Current-year planned → CompletedDunlavy, HO Clarke
Moved between tabsCenterville Switch - Lake Hubbard Switch 138 kV Double-Circuit Line
Upgrade the existing 138 kV Double-Circuit Line
ERCOT project 71130 · utility no. M4126
Current-year planned → CompletedLake Hubbard, Centerville
Moved between tabsUpgrade Pearsall Station
Upgrade Pearsall Station equipment for full auto xfmr ratings. (Upgrade station to breaker and a half is complete)
ERCOT project 71319
Current-year planned → FuturePearsall
Moved between tabsEstablish Launch Pad 138 kV Switch
ERCOT project 71903 · utility no. R6156
Current-year planned → CompletedLaunch Pad
Moved between tabsUpgrade Hondo Creek to Castroville to 138kV
Upgrade Castroville sub to 138kV and line from Hondo creek to Castroville
ERCOT project 71935 · RPG 22RPG022
Current-year planned → CompletedCastroville
Moved between tabsAshville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)
Loop new CEHE 138kV substation Ashville (ASH) into Ckt.06F Garden Villas to Holmes to create new Ckt.06 Garden Villas to Ashville to Holmes
ERCOT project 72029A
Current-year planned → CancelledAshville, Garden Villas, Holmes
Moved between tabsAshville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)
Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ Solar. Utilize same generator lead as Dori BQ BESS.
ERCOT project 72029B
Current-year planned → CancelledAshville, SUNLIT
Moved between tabsAshville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)
Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ BESS. Utilize same generator lead as Dori BQ Solar.
ERCOT project 72029C
Current-year planned → CancelledAshville, SUNLIT
Moved between tabsCedar Valley to Friendship Storm Hardening
Rebuild single circuit section of Cedar Valley to Friendship and reconductor with bundled 795 ACSR Conductor, 440 MVA. Replaces Project ID 61268
ERCOT project 72566
Current-year planned → CompletedCedar Valley, Friendship
Moved between tabsTrading Post to Cedar Valley Storm Hardening
Upgrading switch to bring line to full rating
ERCOT project 72588C
Current-year planned → CompletedNone named
Moved between tabsPEC_MarshallFord_Paleface_StormHardening
Upgrade to terminal equipment and update to final circuit rating. Terminal end equipment update to be completed Fall 2024 based on original project schedule. (Replaces ERCOT Project # 61274C)
ERCOT project 72596C
Current-year planned → CompletedPaleface, Marshall Ford
Moved between tabsBluff Creek: 138 kV Station Work
Replace fourteen (14) 138 kV Breakers and one (1) Circuit Switcher
ERCOT project 72942
Current-year planned → CompletedBluff Creek
Moved between tabsBarrera: Construct New Distribution Station
Construct new distribution station on the North Laredo Switch to Reveille 138 kV line
ERCOT project 73059
Current-year planned → FutureBarrera
Moved between tabsBig Foot to Lytle: Convert to 138 kV
Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station
ERCOT project 73063 · utility no. TP2022155
Current-year planned → FutureBig Foot, Lytle
Moved between tabsCastroville Cut-in 138 kV
Cut the AEP line from Quihi to CPS Castroville into the newly converted to 138 kV STEC Castroville station.
ERCOT project 73098 · RPG 22RPG022
Current-year planned → FutureQuihi, Castroville (CPS)
Moved between tabsThis converts Bell County to Gabriel to 138 KV
ERCOT project 75524
Current-year planned → FutureBell County, Gabriel
Moved between tabsInstall new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar
Install new 345kV Speedway (SPD) substation for generator interconnection to CRADLE/ Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW.
ERCOT project 75810A
Future → CancelledSpeedway, DOW, Oasis
Moved between tabsInstall new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar
Install generator lead from Speedway (SPD) substation to CRADLE (CDL) customer substation (23INR0150).
ERCOT project 75810B
Future → CancelledSpeedway, CRADLE
Moved between tabsJuncus: Construct New 69 kV Station
Interconnect the TEC Snodgrass load to the new Juncus 69 kV station on the Abilene South to Steamboat 69 kV line
ERCOT project 76139 · utility no. TP2023074
Current-year planned → CompletedJuncus
Moved between tabsLytle: Construct New 138 kV Terminal
Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station
ERCOT project 76242 · utility no. TP2022155
Current-year planned → FutureLytle
Moved between tabsHecker to Resnik: Rebuild 138 kV Line
Rebuild the Hecker to Resnik 138 kV line
ERCOT project 76286 · utility no. TP2023506
Current-year planned → FutureHecker, Resnik
Moved between tabsEstablish Walleye Creek 345/138 kV Switch
ERCOT project 76650 · utility no. R6243 · RPG 23RPG030
Current-year planned → CompletedWalleye Creek
Moved between tabsLine Termination at Cypress Waters
Vineyard Switch – Hackberry Switch 138 kV Line Termination at Cypress Waters 138 kV Switch
ERCOT project 76652 · utility no. M5344
Current-year planned → CompletedCypress Waters
Moved between tabsOcelot: Construct New 138 kV Station
Interconnect the Ocelot load to the new Ocelot 138 kV station on the Military Highway to Palo Alto 138 kV line
ERCOT project 76914
Current-year planned → FutureOcelot
Moved between tabsPrimavera 138 kV: Construct new station
New station to serve Tesla load
ERCOT project 76918 · utility no. TP2023059
Current-year planned → CompletedPrimavera
Moved between tabsRebuild Old Lake Sw - Ringgold Magnolia 69 kV line
ERCOT project 77174 · utility no. M3508
Current-year planned → CompletedOld Lake Switch, Ringgold Magnolia
Moved between tabsWilmer 345/138 kV Switch
Establish Wilmer 345/138 kV Switch
ERCOT project 78357 · utility no. M4369 M4371 M4372 · RPG 24RPG022
Current-year planned → CompletedWilmer
Moved between tabsGunter 345/138 kV Switch
Establish Gunter 345/138 kV Switch
ERCOT project 78363 · utility no. M3301 · RPG 24RPG025
Current-year planned → CompletedGunter
Moved between tabsBritmoore to Bellaire Ckt.24B Upgrades
Upgrade Ckt.24B Hayes to Britmoore to increase thermal limits.
ERCOT project 78485F · RPG 23RPG025
Current-year planned → CompletedHayes, Britmoore
Moved between tabsExpand HO Clarke substation for Callisto II (22INR0558)
ERCOT project 79462
Current-year planned → CompletedHO Clarke
Moved between tabsLucero: Construct New 345 kV Station
Interconnect SanPat Solar I and SanPat Solar II to the new Lucero 345 kV station on the Angstrom to Naismith 345 kV line
ERCOT project 79988
Current-year planned → FutureLucero
Moved between tabsDevine: Install Cap Bank
Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch
ERCOT project 80319 · utility no. TA2018040 · RPG 23RPG024
Current-year planned → FutureDevine
Moved between tabsUpgrade the Hutto & Round Rock - Salado 138 kV Line
Rebuild and double-circuit the Georgetown East - Sonterra 138 kV Line Section
ERCOT project 80546C · utility no. R6203, R6202 · RPG 24RPG018, 25RPG006 · RTP 2023-SC17
Current-year planned → FutureGeorgetown East, Sonterra
Moved between tabsOklaunion: Reconfigure 138 kV Station
Reconfigure the Oklaunion 138 kV station from a straight bus to a ring bus
ERCOT project 81215
Current-year planned → FutureOklaunion
Moved between tabsRanger Camp – Cattleman 345 kV Double-Circuit Line
Construct a new 345 kV double-circuit line from Ranger Camp to Cattleman
ERCOT project 81274 · utility no. R8648 · RPG 23RPG029
Current-year planned → CompletedRanger Camp, Cattleman
Moved between tabsGSEC_9452_Add_Snodgrass_Sub
Adding new Snodgrass sub to connect to AEP's Juncus Station.
ERCOT project 81354
Current-year planned → CompletedSnodgrass, Juncus
Moved between tabsRio Pecos: Upgrade 138 kV Terminals
Upgrade the Soaptree and Whitebaker 138 kV terminals at the Rio Pecos 138 kV station
ERCOT project 81368
Future → Current-year plannedRio Pecos
Moved between tabsOncor_FW_81410_Averitt Synchronous Condenser
Add Averitt Switch Synchronous Condenser
ERCOT project 81410 · utility no. D20231 · RPG 23RPG029
Future → Current-year plannedAveritt
Moved between tabsGSEC_9466_Add_CampSprings_Sub
Add Big Country's Camp Springs Sub 9MW
ERCOT project 81544
Current-year planned → CompletedCampSprings, Big Country's Camp Springs
Moved between tabsRio Medina substation
Adds Rio Medina Load serving station
ERCOT project 81590
Future → Current-year plannedRio Medina
Moved between tabsOlympus 138 kV Switch
Establish POI for Gaia Solar
ERCOT project 82810C · utility no. R6330
Current-year planned → CompletedOlympus, Gaia
Moved between tabsNew Furhman Substation
Adds New Furhman switching station on Rayburn - Vanderbilt line for generator interconnect
ERCOT project 82829
Current-year planned → CompletedRayburn, Vanderbilt
Moved between tabsRGEC_Altuda 69-kV In-line_Breaker_Installation
Install 69-kV breaker between Alpine Switch and Persimmon Gap substation at Altuda substation.
ERCOT project 85965
Current-year planned → FutureAlpr2A, PrsmnGap2A
Moved between tabsAthena (ATH) 138kV CEHE Station for RAVEN (RVN) / Raven Solar & Storage (24INR0209 & 24INR0210)
Install one generator lead from Athena CEHE 138kV substation to RAVEN / Raven Solar & Storage (24INR0209 & 24INR0210).
ERCOT project 85970B
Current-year planned → CompletedAthena, RAVEN
Moved between tabsExpand ADLONG substation for XE Murat Storage (24INR0329)
Expand facilities at customer-owned ADLONG substation for XE Murat Storage (24INR0329). Utilize existing generator lead Eastgate to XE Murat Solar.
ERCOT project 86009
Current-year planned → CompletedEastgate, ADLONG
Moved between tabsSnug 138kV Substation expansion for Cottonwood Bayou Storage (21INR0443)
Install Cottonwood Bayou Storage (21INR0443) at Snug 138kV substation. Connect at the same generator lead as Cottonwood Bayou Solar.
ERCOT project 86011
Current-year planned → CompletedSnug
Moved between tabsFairmont Distribution Reconfigurations with 4th Transformer
Install fourth Fairmont distribution transformer on Ckt.95F to create new Ckt.95F SOUTH to Fairmont TR4 tap to Clear Lake tap to Polaris tap to Kemah tap to PH Robinson 138kV North. Remove Fairmont TR3 from Ckt.95F and onto the Ckt.35A Fairmont line position.
ERCOT project 86013
Current-year planned → CompletedFairmont
Moved between tabsScissortail: Construct New 138 kV Station
Interconnect the TNMP Flycatcher station to the new Scissortail 138 kV station on the Saragosa to Solstice 138 kV line between Hoef's Road and Verhalen
ERCOT project 86771
Current-year planned → FutureScissortail
Moved between tabsAdd Dansk load serving substation
Cuts in new Dansk load serving station on existing Red Bluff to Danevang transmission line
ERCOT project 86782
Current-year planned → FutureNone named
Moved between tabsBuccaneer: Construct New 69 kV Station
Interconnect the Oncor Regency station to the new Buccaneer 69 kV station on the Eden to North Brady 69 kV line between Melvin and North Brady
ERCOT project 86796
Current-year planned → FutureBuccaneer
Moved between tabsPrimavera: Construct New 138 kV Terminal
Interconnect Project Lynx Storage to the Primavera 138 kV station
ERCOT project 87031 · utility no. TP2024100
Current-year planned → CompletedPrimavera
Moved between tabsGSEC_Tier4_9468_Add_Bull_Sub
New Substation Load out of 68001 Claytonville
ERCOT project 87146
Current-year planned → CompletedClaytonville
Moved between tabsEstablish Fallstown Switch – Pleasant Valley/Fisher Road 138 kV Double-Circuit Line and Fallstown Switch – Ceramic/Wichita Falls PPG 138 kV Double-Circuit Line
ERCOT project 87413 · utility no. R4024
Future → Current-year plannedFallstown Switch, Pleasant Valley, Fisher Road
Moved between tabsRosita Creek Substation 138-kV T2 Power Transformer Addition. Replacing Committed project 57343
Add second 138/13.09-kV power transformer bay with new 138-kV transmission switch and circuit switcher interconnected at LCRA Switch# 12669. New power transformer capacity will be 15/20/25 MVA. Replaces committed project 57343.
ERCOT project 88867
Current-year planned → CompletedRosita Creek
Moved between tabsOlmos to Wilson T297 Transmission Line Rebuild
Rebuild 7.18 miles of 138 kV from 477 conductor wood pole line to 795 drake conductor concrete/steel transmission line
ERCOT project 89912
Current-year planned → FutureOlmos, Wilson
Moved between tabsCascabel: Construct New 345 kV Station
Interconnect Moccasin Solar to the new Cascabel 345 kV station on the Clear Crossing to Figaro 345 kV line between Clear Crossing and Kirchoff
ERCOT project 90059 · utility no. TP2024121
Current-year planned → FutureCascabel
Moved between tabsAbilene Northwest to Mulberry Creek: Rebuild 138 kV Line
Rebuild the Abilene Northwest to Mulberry Creek 138 kV line
ERCOT project 90065 · utility no. TP2023881
Current-year planned → FutureAbilene Northwest, Mulberry Creek
Moved between tabsInstall new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers.
Convert Pinehurst to unity power factor substation.
ERCOT project 90161C
Current-year planned → FuturePinehurst
Moved between tabsBuchanan_Burnet_TL_Overhaul
Perform an overhaul on the 11.4 mile T108 Buchanan - Burnet 69-kV (de-energized) transmission line
ERCOT project 91402 · utility no. PLC-6943 · RTP 25RPG015
Current-year planned → CompletedBuchanan, Burnet
Moved between tabsEstablish Glaze Lake 138 kV Switch
ERCOT project 91534A · utility no. R6345
Current-year planned → CompletedGlaze Lake 138 kV Switch
Moved between tabsEstablish Glaze Lake 138 kV Switch
Establish Glaze Lake 138 kV Switch Gen Tie
ERCOT project 91534B · utility no. R6345
Current-year planned → CompletedGlaze Lake 138 kV Switch, Leon Solar
Moved between tabsWhite Mule (fka Elmar) 138 kV Substation Reconfiguration
Construct a new White Mule (fka Elmar) 138 kV Substation on the Quarry Field - Border 138 kV Line
ERCOT project 91664 · utility no. R8804
Future → Current-year plannedWhite Mule
Moved between tabsEstablish Gristmill 345 kV Switch
Establish Gristmill 345 kV Switch for Yaupon Solar and Storage
ERCOT project 91911 · utility no. R6232
Current-year planned → CompletedGristmill
Moved between tabsChelsea 138 kV Switch
ERCOT project 92625 · utility no. M5019
Current-year planned → FutureChelsea Switch
Moved between tabsSaddlewood 138 kV Switch
ERCOT project 92646 · utility no. M3242
Current-year planned → CompletedSaddlewood
Moved between tabsStainback 345 kV Switch
Establish Stainback 345 kV Switch
ERCOT project 92680 · utility no. M4383
Current-year planned → CompletedStainback 345 kV Switch
Moved between tabsWatermill to Reindeer 138 kV Line
Upgrade Watermill to Reindeer 138 kV Line
ERCOT project 92845 · utility no. M4430
Current-year planned → CompletedWatermill Switch, Reindeer
Moved between tabsBradberry Switch 138 kV Capacitors (Skybox Lancaster)
ERCOT project 92870 · utility no. M4431
Current-year planned → CompletedBradberry Switch
Moved between tabsBear_Pen 345 kV Switch
Establish Bear pen 345 kV Switch
ERCOT project 92874 · utility no. M3063
Future → CancelledBear Pen 345 kV Switch
Moved between tabsBent Tree 138 kV Substation
Establish Bent Tree 138 kV Substation with 55.2 MVAR capacitor bank using 3-18.4 MVAR stages
ERCOT project 93191 · utility no. R6388
Current-year planned → FutureBent Tree Substation
Moved between tabsQuanah: Rebuild 69 kV Station
Rehab Quanah 69 kV station
ERCOT project 98593 · utility no. TA2018027
Current-year planned → FutureQuanah
Moved between tabsPlover: Rebuild 69 kV Station
Rebuild Eldorado Cities Service Co. Tap and rename to Plover
ERCOT project 98612
Current-year planned → FuturePlover
Moved between tabsDotterel: Rebuild 69 kV Station
Rebuild Middle Valley REA Tap and rename to Dotterel
ERCOT project 98616
Current-year planned → FutureDotterel
Moved between tabsExpand Channelview 138kV substation for Brookview Road BESS (27INR0243)
ERCOT project 99132
Future → CancelledChannelview
Moved between tabsTH Wharton CB2 Cap Bank
Remove 120 MVAR CB1 cap bank from Velasco substation. Install removed CB1 cap bank at TH Wharton substation as replacement for THW CB2.
ERCOT project 99399
Current-year planned → CompletedVelasco, TH Wharton
Moved between tabsDaybreak_Substation_Addition
Substation addition to provide Point of Interconnection for Oncor's Good Morning substation addition. Requires coordination with Oncor.
ERCOT project 99411
Current-year planned → FutureDaybreak, Good Morning
Moved between tabsFacility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.69B Greens Bayou to Deepwater to increase thermal limits as part of FRM2 upgrades
ERCOT project 99453B
Current-year planned → FutureGreens Bayou, Deepwater
Moved between tabsFacility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.97B King to North Belt to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453E
Current-year planned → FutureKing, North Belt
Moved between tabsLaredo VFT North: 138 kV Breaker Addition
Install additional 138 kV breaker on the Lobo circuit #1 138 kV terminal at the Laredo VFT North 138 kV station
ERCOT project 99744
Current-year planned → CompletedLaredo VFT North
Moved between tabsMarconi: Expand 138 kV Station
Interconnect Pajarita BESS to the existing Marconi 138 kV station
ERCOT project 99800 · utility no. TP2025326
Future → CancelledMarconi
Moved between tabsKirkland 138 kV Capacitor Bank
ERCOT project 99941 · utility no. M4022
Current-year planned → FutureKirkland
Status as reported23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit
This project is Phase 1 of the Spruce to Pawnee Double Circuit Rebuild. This Phase captures the completion of the new second circuit from Spruce to Pawnee with the final rating of circuit 2.
ERCOT project 100018 · utility no. T-0400 · RPG 23RPG032
Planned → Under ConstructionNone named
Status as reported23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit
This project is phase 2 of the Spruce to Pawnee Double circuit rebuild. Phase 2 captures the CPS owned portion of the existing Spruce to Pawnee circuit 1 being upgraded. The remaining STEC owned portion will be upgraded/completed at a later date.
ERCOT project 100020 · utility no. T-0400 · RPG 23RPG032
Planned → Under ConstructionNone named
Status as reportedGristmill_Substation_Addition
LCRA TSC will construct a new Gristmill Substation to provide transformation service to a PEC-member load
ERCOT project 100165
Planned → In-ServiceGristmill
Status as reportedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits.
ERCOT project 102546A · RTP 24RPG028
Planned → ConceptualHOPSON, WARVUE
Status as reportedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits.
ERCOT project 102546B · RTP 24RPG028
Planned → ConceptualDALTON, BRINE
Status as reportedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.03G Lyondell to Channelview (distribution) to Channelview (ring bus) in order to increase thermal limits.
ERCOT project 102546C · RTP 24RPG028
Planned → ConceptualLyondell, Channelview
Status as reportedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.08 Hermann to Grant to increase thermal limits.
ERCOT project 102546D · RTP 24RPG028
Planned → ConceptualHermann, Grant
Status as reportedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.06L Plaza to Knight to Gulfgate to increase thermal limits.
ERCOT project 102546E · RTP 24RPG028
Planned → ConceptualPlaza, Gulfgate
Status as reportedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.73B Britmoore to Woodcreek to Memorial to Westheimer in order to increase thermal limits.
ERCOT project 102546F · RTP 24RPG028
Planned → ConceptualBritmoore, Westheimer
Status as reportedUpgrades related to the Baytown Area Load Addition
Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits.
ERCOT project 102546G · RTP 24RPG028
Planned → ConceptualPH Robinson, HUNTER
Status as reportedUpgrades related to the Baytown Area Load Addition
Install (3) 7.2 MVAR distribution cap banks at Bayway substation.
ERCOT project 102546H · RTP 24RPG028
Planned → ConceptualBayway
Status as reportedUpgrades related to the Baytown Area Load Addition
Install (1) 60 MVAR cap bank at Mykawa substation.
ERCOT project 102546I · RTP 24RPG028
Planned → ConceptualMykawa
Status as reportedUpgrades related to the Baytown Area Load Addition
Install (1) 60 MVAR switchable cap bank at Humble substation.
ERCOT project 102546J · RTP 24RPG028
Planned → ConceptualHumble
Status as reportedUpgrades related to the Baytown Area Load Addition
Install (2) 14.4 MVAR distribution cap banks at Treaschwig substation.
ERCOT project 102546K · RTP 24RPG028
Planned → ConceptualTreaschwig
Status as reportedEstablish Pathfinder 345 kV Switch
ERCOT project 104658A · utility no. R6364
Planned → In-ServicePathfinder
Status as reportedEstablish Pathfinder 345 kV Switch
Pathfinder 345 kV Switch Gen Tie
ERCOT project 104658B · utility no. R6364
Planned → In-ServicePathfinder, Piedra Solar
Status as reportedUpgrade Killeen Switch - Salado Switch 345 kV Line Ckt #1
ERCOT project 109892 · utility no. R6567
Planned → ConceptualKilleen, Salado
Status as reportedInstall Jewett Switch - Crockett Switch 138 kV Line Ckt #2
ERCOT project 110000 · utility no. R6554
Planned → ConceptualJewett Switch, Crockett Switch
Status as reportedInstall Crockett Switch - Lufkin Switch 138 kV Line Ckt#2
ERCOT project 110002 · utility no. R6555
Planned → ConceptualCrockett Switch, Lufkin Switch
Status as reportedThis models the new CEHE Raider Substation and upgrades required for a proposed load addition
Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service.
ERCOT project 110068A
Conceptual → PlannedRaider, Cedar Creek, Bailey
Status as reportedThis models the new CEHE Raider Substation and upgrades required for a proposed load addition
Loop 345 kV Ckt. 64 Wolf-Hillje line into the new 345 kV CEHE Raider substation. Upgrade line relaying on Ckt 64 WOLF-Raider-Hillje.
ERCOT project 110068B
Conceptual → PlannedRaider, Wolf, Hillje
Status as reportedA new Helotes 345kV substation will be constructed
ERCOT project 110263 · utility no. T-0410 · RPG 25RPG013 and 25RPG017
Planned → Under ConstructionHelotes
Status as reportedUpgrade Salado Switch - Puma 138 kV Line Section
ERCOT project 110336 · utility no. R6570
Planned → ConceptualSalado, Puma
Status as reportedRebuild Voss Lake Switch - Minerva Switch 138 kV Line
ERCOT project 110338 · utility no. R6571
Planned → ConceptualVoss Lake, Minerva
Status as reportedAdd Temple Switch - Fryers Creek Switch 138 kV Line Ckt #2
ERCOT project 110340 · utility no. R6572
Planned → ConceptualTemple, Fryers Creek
Status as reportedRio Hondo to Bonilla: Rebuild/Reconductor 345 kV Line
Rebuild/Reconductor Rio Hondo to Bonilla 345 kV line
ERCOT project 110437
Conceptual → PlannedRio Hondo, Bonilla
Status as reportedFincas: Build new 138 kV distribution station
Construct new distribution station on the University to Wormser 138 kV line
ERCOT project 48774 · utility no. 3765
Under Construction → In-ServiceFincas
Status as reportedStructure 31/8 - Kenedy SS: Line Rebuild
Coleto Creek - Kenedy SS: Line Rebuild
ERCOT project 50866 · utility no. 3779 · RPG 20RPG014
Planned → Under ConstructionRosata, Kenedy SS
Status as reportedPort Lavaca: Station Rebuild (Cangrejo)
Rebuild the Port Lavaca (Cangrejo) station
ERCOT project 50890 · utility no. 3787 TA2019045 · RPG 21RPG002
Planned → Under ConstructionPort Lavaca
Status as reportedBallinger to Concho: Rebuild 69 kV line
Rebuild Ballinger to Concho 69 kV line, install POP switch for Rowena, install CB at Miles, install POP switch for Harriett REA
ERCOT project 55421 · utility no. 1861 · RPG 20RPG004
Planned → Under ConstructionBallinger, San Angelo Concho
Status as reportedUpgrade Moore to Hondo Creek 138 kV line
Replace the 336 ACSR with 1020 ACCC conductor while keeping the existing structures that still meet our standards.
ERCOT project 55873 · RPG 19RPG021
Planned → In-ServiceMoore, Hondo Creek
Status as reportedMatador to Turkey: Rebuild 69 kV Line
Rebuild 69 kV line from Matador to Turkey
ERCOT project 61552 · utility no. 1873
Under Construction → In-ServiceMatador, Turkey
Status as reportedNew Cachena 345kV Switchyard
The New 345kV Cachena switchyard will be looped into the future 345 kV Elm Creek to New Hickory ckt 1 transmission line . This loop should be rated to match or exceed the existing line rating.
ERCOT project 65837 · utility no. S-0966
Planned → Under ConstructionCachena
Status as reportedCedar Crest - Dealey - West Levee 138 kV Line
Upgrade the existing 138 kV Line
ERCOT project 66188 · utility no. M4212
Planned → In-ServiceCeadr Crest, West Levee
Status as reportedUpgrade Taylor - Holland 69 kV Line
Rebuild the Granger - Taylor 69 kV Line
ERCOT project 66200D · utility no. R6173 · RPG 22RPG036
Planned → In-ServiceTaylor, Holland
Status as reportedMesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line
Upgrade the Mesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line
ERCOT project 66473 · utility no. M4137
Planned → In-ServiceMesquite East, Oates
Status as reportedRosata: Build 138kV Substation
Build new Rosata 138 kV POD Switch on the Coleto Creek to Kenedy 138 kV line
ERCOT project 6749 · utility no. 3682
Planned → In-ServiceRosata
Status as reportedCPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade
Shepherd Rd to Valley Rd 138kV line Reconfiguration.
ERCOT project 67992A
Planned → In-ServiceHoward Switching, Shepherd Rd, Valley Rd
Status as reportedCPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade
Looping of 345KV Howard Rd switching station into existing Cagnon to AVR and Cagnon to Spruce 34KV lies. The switching station will have 2 600MVA 345KV/138KV autotransformers.
ERCOT project 67992C
Planned → In-Service5400 and 5475
Status as reportedCPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade
Upgrade Hamilton to Medical Center 138KV Line to 469MVA
ERCOT project 67992D
Planned → In-ServiceHoward Switching
Status as reportedJaguar: Construct New Distribution Station
Construct new distribution station on the McGruder to Thomaston 138 kV line
ERCOT project 69473
Under Construction → In-ServiceJaguar
Status as reportedRebuild Olivia - Carancahua
rebuild Olivia sw to Carancahua 795 ACSR
ERCOT project 70882
Planned → In-ServiceOlivia SW, Carancahua
Status as reportedFlomot Tap: Rebuild 69 kV Line
Rehab Flomot Tap 69 kV Line
ERCOT project 70898
Planned → In-ServiceFlomot Tap, Flomot
Status as reportedRoanoke Area Upgrades
Ramhorn Hill – Dunham 345 kV Double-Circuit Line
ERCOT project 70900E · utility no. M5281 M5144 M5146 M5148 · RPG 22RPG003
Planned → In-ServiceDunham Switch, Ramhorn Switch
Status as reportedRoanoke Area Upgrades
Establish Roanoke_Exchange 138 kV Line
ERCOT project 70900F · utility no. M5281 M5144 M5146 M5148 · RPG 22RPG003
Planned → Under ConstructionRoanoke Switch, Exchange Switch
Status as reportedCenterville Switch - Lake Hubbard Switch 138 kV Double-Circuit Line
Upgrade the existing 138 kV Double-Circuit Line
ERCOT project 71130 · utility no. M4126
Planned → In-ServiceLake Hubbard, Centerville
Status as reportedEstablish Launch Pad 138 kV Switch
ERCOT project 71903 · utility no. R6156
Planned → In-ServiceLaunch Pad
Status as reportedUpgrade STEC castroville to Pearson to 138kV
Upgrade STEC Bader station to 138kV. Upgrade STEC Castroville to bader and bader to pearson to 138kV
ERCOT project 71917 · RPG 22RPG022
Planned → Under ConstructionBader
Status as reportedUpgrade Hondo Creek to Castroville to 138kV
Upgrade Castroville sub to 138kV and line from Hondo creek to Castroville
ERCOT project 71935 · RPG 22RPG022
Planned → In-ServiceCastroville
Status as reportedAshville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)
Loop new CEHE 138kV substation Ashville (ASH) into Ckt.06F Garden Villas to Holmes to create new Ckt.06 Garden Villas to Ashville to Holmes
ERCOT project 72029A
Planned → ConceptualAshville, Garden Villas, Holmes
Status as reportedAshville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)
Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ Solar. Utilize same generator lead as Dori BQ BESS.
ERCOT project 72029B
Planned → ConceptualAshville, SUNLIT
Status as reportedAshville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)
Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ BESS. Utilize same generator lead as Dori BQ Solar.
ERCOT project 72029C
Planned → ConceptualAshville, SUNLIT
Status as reportedNew Ingram Rd 138kV Substation
Install a new 138kV transmission loop in conjunction with the S-0978 QTS Ingram Rd Substation project. The substation will be looped into the Potranco to TCC/Crossroads transmission line and connected to (2) 138kV line terminals.
ERCOT project 72268 · utility no. S-0978
Planned → Under ConstructionIngram Rd, S-0978 QTS Ingram Rd
Status as reportedBluff Creek: 138 kV Station Work
Replace fourteen (14) 138 kV Breakers and one (1) Circuit Switcher
ERCOT project 72942
Planned → In-ServiceBluff Creek
Status as reportedVertrees: Construct New Distribution Station
Construct new distribution station on the Stewart Road to Weslaco Unit 138 kV line
ERCOT project 73359
Planned → In-ServiceVertrees
Status as reportedSan Antonio South Reliability RPG Project
The Leon Creek to Howard Rd circuit should be upgraded to 698 MVA, minimum.
ERCOT project 75255C · RPG 22RPG048
Planned → Under ConstructionNone named
Status as reportedSan Antonio South Reliability RPG Project
Rebuild approximately 3 circuit miles of 138KV Transmission from Leon Creek to South San to meet current CPS Energy and industry standards. The new line will require a rating of 478MVA.
ERCOT project 75255F · RPG 22RPG048
Planned → Under ConstructionNone named
Status as reportedInstall new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar
Install new 345kV Speedway (SPD) substation for generator interconnection to CRADLE/ Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW.
ERCOT project 75810A
Planned → ConceptualSpeedway, DOW, Oasis
Status as reportedInstall new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar
Install generator lead from Speedway (SPD) substation to CRADLE (CDL) customer substation (23INR0150).
ERCOT project 75810B
Planned → ConceptualSpeedway, CRADLE
Status as reportedJuncus: Construct New 69 kV Station
Interconnect the TEC Snodgrass load to the new Juncus 69 kV station on the Abilene South to Steamboat 69 kV line
ERCOT project 76139 · utility no. TP2023074
Planned → In-ServiceJuncus
Status as reportedAsherton: Rebuild 138 kV station
Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station
ERCOT project 76569 · RPG 23RPG007
Planned → Under ConstructionAsherton
Status as reportedAsherton to Uvalde: Convert to 138 kV
Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station
ERCOT project 76576 · RPG 23RPG007
Planned → Under ConstructionAsherton, Uvalde
Status as reportedPoblano: Build new 138 kV station
Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station
ERCOT project 76580 · RPG 23RPG007
Planned → Under ConstructionPoblano
Status as reportedEstablish Walleye Creek 345/138 kV Switch
ERCOT project 76650 · utility no. R6243 · RPG 23RPG030
Planned → In-ServiceWalleye Creek
Status as reportedLine Termination at Cypress Waters
Vineyard Switch – Hackberry Switch 138 kV Line Termination at Cypress Waters 138 kV Switch
ERCOT project 76652 · utility no. M5344
Planned → In-ServiceCypress Waters
Status as reportedUpgrade Driscoll- Loyola
Upgrade Driscol-Ricardo-Riviera-Loyola to 795 ACSR
ERCOT project 76786
Planned → Under ConstructionDriscoll, Loyola
Status as reportedCowpen 138kV station from TNMP submitted Cowpen/Silverleaf RPG
ERCOT project 77803 · RPG 23RPG013
Planned → Under ConstructionCowpen
Status as reportedWilmer 345/138 kV Switch
Establish Wilmer 345/138 kV Switch
ERCOT project 78357 · utility no. M4369 M4371 M4372 · RPG 24RPG022
Planned → In-ServiceWilmer
Status as reportedGunter 345/138 kV Switch
Establish Gunter 345/138 kV Switch
ERCOT project 78363 · utility no. M3301 · RPG 24RPG025
Planned → In-ServiceGunter
Status as reportedRebuild Oaks to Poteet to Pearsall 69 kV line
Rebuild Oaks to Poteet to Pearsall 69 kV line from 4/0 to 795. 2023 RTP
ERCOT project 78478
Planned → Under ConstructionOaks, Pearsall
Status as reportedRebuild Nada to El Campo 69 kV line
Rebuild Nada to El Campo 69 kV line from 4/0 to 795. 2023 RTP
ERCOT project 78483
Planned → Under ConstructionNada, El Campo
Status as reportedBritmoore to Bellaire Ckt.24B Upgrades
Upgrade Ckt.24B Hayes to Britmoore to increase thermal limits.
ERCOT project 78485F · RPG 23RPG025
Planned → In-ServiceHayes, Britmoore
Status as reportedNorth McAllen: Construct New 138 kV Terminal
Interconnect Carambola BESS to the North McAllen 138 kV station
ERCOT project 80482
Planned → In-ServiceNorth McAllen
Status as reportedRanger Camp – Cattleman 345 kV Double-Circuit Line
Construct a new 345 kV double-circuit line from Ranger Camp to Cattleman
ERCOT project 81274 · utility no. R8648 · RPG 23RPG029
Planned → In-ServiceRanger Camp, Cattleman
Status as reportedGSEC_9452_Add_Snodgrass_Sub
Adding new Snodgrass sub to connect to AEP's Juncus Station.
ERCOT project 81354
Planned → In-ServiceSnodgrass, Juncus
Status as reportedGSEC_9466_Add_CampSprings_Sub
Add Big Country's Camp Springs Sub 9MW
ERCOT project 81544
Planned → In-ServiceCampSprings, Big Country's Camp Springs
Status as reportedDunlay substation
Adds STEC Dunlay Load serving station
ERCOT project 81594
Planned → Under ConstructionDunlay
Status as reportedOlympus 138 kV Switch
Topology Correction: Add missing Olympus Switch - Kerens 138 kV Line Section
ERCOT project 82810B · utility no. R6330
Planned → In-ServiceOlympus Switch, Kerens
Status as reportedOlympus 138 kV Switch
Establish POI for Gaia Solar
ERCOT project 82810C · utility no. R6330
Planned → In-ServiceOlympus, Gaia
Status as reportedNew Furhman Substation
Adds New Furhman switching station on Rayburn - Vanderbilt line for generator interconnect
ERCOT project 82829
Planned → In-ServiceRayburn, Vanderbilt
Status as reported23RPG032: San Antonio South Reliability II: Rebuild Pawnee to Tango into a double circuit
Rebuild approximately 12 miles of existing horizontal single circuit 345kV transmission infrastructure into new vertical double circuit 345kV transmission infrastructure.
ERCOT project 84900 · utility no. T-0401 · RPG 23RPG032
Planned → Under ConstructionNone named
Status as reported23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit
The final upgrades on the STEC side will be completed and the ultimate ratings of the double circuit will be realized.
ERCOT project 84902 · utility no. T-0400 · RPG 23RPG032
Planned → Under ConstructionNone named
Status as reportedExpand ADLONG substation for XE Murat Storage (24INR0329)
Expand facilities at customer-owned ADLONG substation for XE Murat Storage (24INR0329). Utilize existing generator lead Eastgate to XE Murat Solar.
ERCOT project 86009
Planned → In-ServiceEastgate, ADLONG
Status as reportedSnug 138kV Substation expansion for Cottonwood Bayou Storage (21INR0443)
Install Cottonwood Bayou Storage (21INR0443) at Snug 138kV substation. Connect at the same generator lead as Cottonwood Bayou Solar.
ERCOT project 86011
Planned → In-ServiceSnug
Status as reportedFairmont Distribution Reconfigurations with 4th Transformer
Install fourth Fairmont distribution transformer on Ckt.95F to create new Ckt.95F SOUTH to Fairmont TR4 tap to Clear Lake tap to Polaris tap to Kemah tap to PH Robinson 138kV North. Remove Fairmont TR3 from Ckt.95F and onto the Ckt.35A Fairmont line position.
ERCOT project 86013
Planned → In-ServiceFairmont
Status as reportedPrimavera: Construct New 138 kV Terminal
Interconnect Project Lynx Storage to the Primavera 138 kV station
ERCOT project 87031 · utility no. TP2024100
Planned → In-ServicePrimavera
Status as reportedGSEC_Tier4_9468_Add_Bull_Sub
New Substation Load out of 68001 Claytonville
ERCOT project 87146
Planned → In-ServiceClaytonville
Status as reportedOld Country 345 kV Switch
ERCOT project 87799 · utility no. M4172
Planned → In-ServiceOld Country
Status as reported24RPG004: Omicron Reliability Project: Rebuild Leon Creek to Pearsal
Rebuild ~1.6 miles of double-ckt from Leon Creek to Pearsall transmission line with normal and emergency ratings of at least 478MVA
ERCOT project 88041 · utility no. T-0396 · RPG 24RPG004
Planned → Under ConstructionNone named
Status as reportedEstablish Glaze Lake 138 kV Switch
ERCOT project 91534A · utility no. R6345
Planned → In-ServiceGlaze Lake 138 kV Switch
Status as reportedEstablish Glaze Lake 138 kV Switch
Establish Glaze Lake 138 kV Switch Gen Tie
ERCOT project 91534B · utility no. R6345
Planned → In-ServiceGlaze Lake 138 kV Switch, Leon Solar
Status as reportedEstablish Gristmill 345 kV Switch
Establish Gristmill 345 kV Switch for Yaupon Solar and Storage
ERCOT project 91911 · utility no. R6232
Planned → In-ServiceGristmill
Status as reportedSaddlewood 138 kV Switch
ERCOT project 92646 · utility no. M3242
Planned → In-ServiceSaddlewood
Status as reportedStainback 345 kV Switch
Establish Stainback 345 kV Switch
ERCOT project 92680 · utility no. M4383
Planned → In-ServiceStainback 345 kV Switch
Status as reportedWatermill to Reindeer 138 kV Line
Upgrade Watermill to Reindeer 138 kV Line
ERCOT project 92845 · utility no. M4430
Planned → In-ServiceWatermill Switch, Reindeer
Status as reportedBradberry Switch 138 kV Capacitors (Skybox Lancaster)
ERCOT project 92870 · utility no. M4431
Planned → In-ServiceBradberry Switch
Status as reportedExpand Channelview 138kV substation for Brookview Road BESS (27INR0243)
ERCOT project 99132
Planned → ConceptualChannelview
Status as reportedTH Wharton CB2 Cap Bank
Remove 120 MVAR CB1 cap bank from Velasco substation. Install removed CB1 cap bank at TH Wharton substation as replacement for THW CB2.
ERCOT project 99399
Planned → In-ServiceVelasco, TH Wharton
Status as reportedLaredo VFT North: 138 kV Breaker Addition
Install additional 138 kV breaker on the Lobo circuit #1 138 kV terminal at the Laredo VFT North 138 kV station
ERCOT project 99744
Planned → In-ServiceLaredo VFT North
Projected in-service dateEstablish Maxdale 138 kV Switch
Establish Maxdale 138 kV Switch for Cosper Solar
ERCOT project 100076 · utility no. R6468
May 2027 → Dec 2027Maxdale
Projected in-service dateInstall a 50MVAr Capacitor Bank at Howard Substation
ERCOT project 100691
Jun 2028 → Jan 2032Howard
Projected in-service dateBEPC_TPIT102755_Dennis
ERCOT project 102755
Dec 2027 → Mar 2028None named
Projected in-service dateAdd Fort Bobcat load serving station and Tline to STEC Orange Grove
ERCOT project 102871
Aug 2026 → Sep 2026None named
Projected in-service dateBlu Lacy: Construct New 765/345 kV Station
Construct new 765/345 kV station on the Lon Hill to Reforzar and Lon Hill to Nelson Sharpe 345 kV lines
ERCOT project 102885 · utility no. TP2025322 · RPG 25RPG025
Nov 2031 → Jan 2032Blu Lacy
Projected in-service dateBlu Lacy to Howard: Construct New 765 kV Line
Construct a new 765 kV single circuit line from Blu Lacy to Howard
ERCOT project 102901 · utility no. TP2025322 · RPG 25RPG025
Nov 2031 → Jan 2032Blu Lacy, Howard
Projected in-service dateLlano: Build new 69 kV Station
Interconnect PEC's New Junction Station to the Junction to Mason Switch 69 kV Line
ERCOT project 103259
May 2027 → Jun 2028Llano
Projected in-service dateBrownsville SW: 69 kV Breaker Replacement
Replace 69 kV breakers at the Brownsville 69 kV station
ERCOT project 103412 · utility no. TP2025939
Jan 2028 → Jan 2029Brownsville SW
Projected in-service dateRio Hondo: 138 kV Breaker Replacement
Replace 138 kV breakers at the Rio Hondo 138 kV station
ERCOT project 103414 · utility no. TP2025950
Mar 2028 → Oct 2028Rio Hondo
Projected in-service dateSouth McAllen: 138 kV Breaker Replacement
Replace 138 kV breakers at the South McAllen 138 kV station
ERCOT project 103416 · utility no. TP2026008
Dec 2028 → Nov 2029South McAllen
Projected in-service dateWelsh HVDC: Build 345 kV Bypass Line
Construct new 345 kV bypass line at the Welsh HVDC 345 kV station
ERCOT project 103470 · utility no. TP2024163
Jun 2028 → Mar 2030Welsh HVDC
Projected in-service dateTaft: Rebuild Distribution Station
Rebuild the Taft distribution station
ERCOT project 103479 · utility no. DP25X0014
Jun 2028 → Dec 2030Taft
Projected in-service dateBRYN_ColeLane
Construct Cole Lane 138-kV Substation by cutting into the existing Keith Switch to Steep Hollow 138-kV transmission line.
ERCOT project 103787
Jun 2030 → Jun 2028Cole Lane, Keith, Steep Hollow
Projected in-service dateBRYN_GreensPrairie_Rebuild
Rebuild Greens Prairie 138-kV Substation to add a second distribution transformer
ERCOT project 103793
Jun 2028 → Jun 2027Greens Prairie
Projected in-service dateBlu Lacy to Hillje: Construct New 765 kV Line
Construct a new 765 kV single circuit line from Blu Lacy to Howard
ERCOT project 103809 · utility no. TP2025322 · RPG 25RPG025
Nov 2031 → Jan 2032Blu Lacy, Hillje
Projected in-service dateMontura: Construct New 345 kV Station
Interconnect Bullring Wind 1, 2, and 3 to the new Montura 345 kV station on the Cruce to Del Sol 345 kV line
ERCOT project 103816 · utility no. TP2025870
Jun 2028 → Aug 2028Montura
Projected in-service dateBRYN_MillicanSwitch_Rebuild
Rebuild Millican Switch to remove the 69-kV bus and transfer distribution load to the 138-kV bus. Remove Millican 69-kV Substation.
ERCOT project 103826
Jun 2028 → Jun 2031Millican Switch
Projected in-service dateBRYN_ShadyLane_Rebuild
Rebuild Shady Lane into a ring bus configuration. MAY NEED TO DELETE THIS LATER IF IT CONFLICTS WITH A FUTURE NOMCR OR NMMS TOPOLOGY.
ERCOT project 103867
Oct 2026 → Oct 2027Shady Lane
Projected in-service datePotterson Lake 138 kV Switch
Establish new 138 kV Switch
ERCOT project 103919 · utility no. R8908
May 2027 → Dec 2027Catclaw, Mudstone
Projected in-service dateWesmer: 138 kV Breaker and Circuit Switcher Replacement
Replace 138 kV breakers and circuit switches at the Wesmer 138 kV station
ERCOT project 103962 · utility no. TP2025940
Dec 2028 → Jan 2029Wesmer
Projected in-service dateBRYN_KoppeBridge_Load_Addition
Adding second distribution transformer at Koppe Bridge
ERCOT project 104001
Jun 2028 → Jun 2029Koppe Bridge
Projected in-service dateLake Pauline to Quanah: Convert to 138 kV
Convert the Lake Pauline to Quanah 69 kV line to 138 kV
ERCOT project 104018 · utility no. TP2025249 · RPG 25RPG018
Nov 2031 → Nov 2030Lake Pauline, Quanah
Projected in-service dateNippert: Construct New 138/69 kV Station
Construct new Nippert 138/69 kV station on the Childress to Quanah 69 kV line between Childress and Goodlet and on the Paducah to West Childress 138 kV line
ERCOT project 104020 · utility no. TP2025249 · RPG 25RPG018
Nov 2031 → Nov 2030Nippert
Projected in-service dateMorado (Abilene Northwest): Rebuild 138 kV Station
Rebuild the Morado (Abilene Northwest) 138 kV station
ERCOT project 104026 · utility no. TP2023700 · RPG 25RPG036
Feb 2031 → Nov 2028Morado
Projected in-service dateRincon to Tungsten: Rebuild 138 kV Line
Rebuild the Rincon to Tungsten 138 kV line
ERCOT project 104084 · utility no. TP2026007
Nov 2028 → Jun 2029Rincon, Tungsten
Projected in-service dateNorth Edinburg to North McAllen: Rebuild 138 kV line
ERCOT project 104151 · utility no. TA2021190
Jan 2032 → Jan 2031North Edinburg, North McAllen
Projected in-service dateBRYN_SOSW-HLMN-DWLRD_Upgrade
Upgrade South Switch to Holleman 138kV Line
ERCOT project 104249A
Jun 2028 → Jun 2030Holleman, South Switch
Projected in-service dateBRYN_SOSW-HLMN-DWLRD_Upgrade
Upgrade Dowling Road to Holleman 138kV Line
ERCOT project 104249B
Jun 2028 → Jun 2030Dowling Road, Holleman
Projected in-service dateSalvare: Install New 345 kV Feed
Install 2nd POI for IRIS Data center
ERCOT project 104448 · utility no. TP2026040
Oct 2028 → Feb 2028Salvare
Projected in-service dateKingsbury Substation Addition
Add new load serving substation 1.5 miles northwest of Kingsbury w/40 MVA PWT, station to be cut into LCRA T158 ckt.
ERCOT project 104460
Oct 2028 → Dec 2028Kingsbury
Projected in-service dateHockley Distribution Transformer Addition with Upgrades
Install 3rd Transformer and 8th 35 kV feeder at Hockley distribution substation
ERCOT project 104559A
Dec 2027 → May 2028Hockley
Projected in-service dateGlint: Construct New 138 kV Station
Interconnect Falcon BESS to the new Glint 138 kV station on the Lopeno to Zapata 138 kV line
ERCOT project 104562 · utility no. TP2026040
Oct 2028 → Jul 2028Glint
Projected in-service dateColmena: Construct new 345 kV Station
Interconnect Abeja Solar to the new Colmena 345 kV Station on the Tango to Goddard 345 kV line
ERCOT project 104630 · utility no. TP2026011
Dec 2028 → Mar 2029Colmena
Projected in-service dateWesternWind_Switch
Establish Western Wind Switch to interconnect Adamstown solar
ERCOT project 104830
May 2027 → Dec 2026Krum West Switch, Riley
Projected in-service dateMissouri City Low Profile Conversion
Convert Missouri City distribution substation to low-profile. Install Missouri City TR4 at Ckt.02A Blueridge to Missouri City to DEWALT.
ERCOT project 105135
Mar 2027 → Apr 2027Missouri City, Blueridge, DEWALT
Projected in-service dateDinolong 765 kV Switch
Establish a 765 kV midpoint station to support reactive compensation needs for the Dinosaur - Longshore 765 kV Line
ERCOT project 105247 · utility no. R8970
Dec 2031 → Dec 2029Dinosaur, Longshore
Projected in-service dateAlba Road 345 kV Switch
Establish Alba Road 345 kV Switch
ERCOT project 105312 · utility no. M4385 · RPG 25RPG004
Dec 2028 → May 2028Alba Road Switch
Projected in-service dateGreene 345/138 kV Switch
Establish Greene 345/138 kV Switch
ERCOT project 105318 · utility no. M4255 · RPG 25RPG004
May 2028 → Dec 2028Greene Switch
Projected in-service dateMODELS FLYCATCHER
ERCOT project 105602
Jan 2027 → Mar 2027None named
Projected in-service dateAlba Road 345kV Statcom
Upgrade Alba Road 345kV Statcom
ERCOT project 105833 · utility no. M4386 · RPG 25RPG004
Dec 2029 → May 2029Alba Switch
Projected in-service dateGreene 345kV STATCOM
Establish Greene 345kV STATCOM
ERCOT project 105836 · utility no. M4387 · RPG 25RPG004
Dec 2029 → May 2029Greene
Projected in-service dateEast Watermill 765 kV Switch
Establish East Watermill 765 kV Switch
ERCOT project 105886 · utility no. M4477 · RPG 25RPG025
May 2032 → Dec 2030East Watermill 765 kV Switch
Projected in-service dateSouth Watermill 765 kV Switch
Establish South Watermill 765 kV Switch
ERCOT project 105888 · utility no. M4478, M4460, M4459 · RPG 25RPG025
May 2032 → Dec 2030South Watermill 765 kV Switch
Projected in-service dateAngstrom: Expand 345 kV Station
Interconnect Alila Solar to the Angstrom 345 kV station
ERCOT project 109706 · utility no. TP2023019
Jun 2026 → Nov 2027Ansgtrom
Projected in-service dateDonatello: Construct New 345 kV Station
Interconnect the Mirando Valley Wind and the Viento Bravo Wind to the new Donatello 345 kV station on the Cenizo to Cruze 345 kV line
ERCOT project 109739 · utility no. TP2026135
Jul 2028 → Jan 2029Donatello
Projected in-service dateHardening Project for circuit 05 WAP to Missouri City(26RPG021).
ERCOT project 109759 · RPG 26RPG021
Dec 2027 → Jun 2028HO Clarke, Missouri City
Projected in-service dateRebuild/reconductor portions of Ckt.05D Missouri City to Westchase as a Hardening Upgrade(26RPG024).
ERCOT project 109761 · RPG 26RPG024
Dec 2027 → Jun 2028Westchase, Missouri City
Projected in-service dateOncor_ME_109845_Cleburne Switch - Venus 138 kV Line Section and Rebuild Cleburne 138 kV Switch
Upgrade Cleburne Switch - Venus 138 kV Line Section and Rebuild Cleburne 138 kV Switch
ERCOT project 109845 · utility no. M5371, M5196 · RPG 25RPG040 · RTP 2024-NC04
Dec 2029 → Dec 2028Venus Substation, Cleburne Switch
Projected in-service dateRebuild the existing Medinabs to 36th Street 138-kV transmission line
ERCOT project 109940 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017
Dec 2029 → Jan 2032None named
Projected in-service dateInstall a 50MVAr Capacitor Bank at Panther Springs Substation
ERCOT project 109982 · utility no. S-XXXX · RPG 25RPG013 and 25RPG017
Dec 2029 → Jan 2032Panther Springs
Projected in-service dateConstruct a new CPS Owned switchyard construction and gen tie to accommodate connection to the HUISACHE BESS & SOLAR generation site
ERCOT project 109984 · utility no. S-XXXX · RPG 25RPG013 and 25RPG017
Dec 2029 → Jan 2032None named
Projected in-service dateRebuild Castle to Dresden 138kV Transmission Line
ERCOT project 109992 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017
Dec 2029 → Jan 2032Castle, Dresden
Projected in-service dateInstall Voss Lake 345/138 kV Auto #2
ERCOT project 110016 · utility no. R6551
Dec 2028 → Dec 2029Voss Lake
Projected in-service dateThis models the new CEHE Raider Substation and upgrades required for a proposed load addition
Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service.
ERCOT project 110068A
Oct 2026 → May 2027Raider, Cedar Creek, Bailey
Projected in-service dateThis models the new CEHE Raider Substation and upgrades required for a proposed load addition
Loop 345 kV Ckt. 64 Wolf-Hillje line into the new 345 kV CEHE Raider substation. Upgrade line relaying on Ckt 64 WOLF-Raider-Hillje.
ERCOT project 110068B
Oct 2028 → May 2029Raider, Wolf, Hillje
Projected in-service dateBowman 345 kV Switch Capacitor Bank
ERCOT project 110178 · utility no. M3568
May 2028 → Dec 2029Bowman Switch
Projected in-service dateRio Hondo to Bonilla: Rebuild/Reconductor 345 kV Line
Rebuild/Reconductor Rio Hondo to Bonilla 345 kV line
ERCOT project 110437
Jun 2028 → May 2028Rio Hondo, Bonilla
Projected in-service dateMolina: Add Capacitor
Install additional reactive support at Molina 138 kV station
ERCOT project 110439
Nov 2027 → Feb 2028Molina
Projected in-service dateRio Bravo: Add Capacitor
Install additional reactive support at Rio Bravo 138 kV station
ERCOT project 110441
Nov 2027 → Feb 2028Rio Bravo
Projected in-service dateSTEC Rodgers Large Load Phase 3
-Upgrade CPS Martinez 345/138kV autos 1,2 to 683 MVA -Rebuild CPS Howard to Spruce 345kV to 1580MVA - Rebuild CPS Howard to Braunig to 1457 MVA -Upgrade CPS Hill Country 345/138kV autos 3,4 to 740MVA rating - Rebuild CPS Cachena to Elmcreek to 1250MVA
ERCOT project 110529 · RPG 25RPG046
Jul 2031 → Dec 2030Howard, Spruce
Projected in-service dateParis Switch - Valley Switch 138 kV Line
Paris Switch - Valley Switch 138 kV Line Upgrade
ERCOT project 110647 · utility no. M3323 · RPG 25RPG040 · RTP 2024-NC31
Aug 2033 → May 2033Paris Switch, Valley Switch
Projected in-service dateHandley - Hemphill 138 kV Line
Upgrade existing line
ERCOT project 4270 · utility no. M5214
May 2028 → May 2029Handley, Hemphill
Projected in-service dateFincas: Build new 138 kV distribution station
Construct new distribution station on the University to Wormser 138 kV line
ERCOT project 48774 · utility no. 3765
Jul 2026 → Jun 2026Fincas
Projected in-service dateBallinger: Rebuild 138 kV Station
Rehab the 138/69 kV autotransformer at Ballinger
ERCOT project 48818 · utility no. 2777
Jul 2027 → Jun 2027Ballinger
Projected in-service datePort Isabel: Rebuild As GIS Station
Rebuild Port Isabel as a GIS
ERCOT project 49550 · utility no. 3716
Oct 2027 → Mar 2029Port Isabel
Projected in-service dateOzona: Rebuild 69 kV station
Replace existing Ozona 69 kV station with a new 69 kV ring bus
ERCOT project 49556 · utility no. 2780
Mar 2028 → Jan 2029Ozona
Projected in-service dateMantle: Construct New 345 kV Station
ERCOT project 49564 · utility no. 3774 TP2018166
May 2027 → Jan 2029Mantle
Projected in-service datePort Lavaca: Station Rebuild (Cangrejo)
Rebuild the Port Lavaca (Cangrejo) station
ERCOT project 50890 · utility no. 3787 TA2019045 · RPG 21RPG002
Jun 2026 → Sep 2026Port Lavaca
Projected in-service dateAlamito Creek to Ft. Davis: Rebuild 69 kV Line
Alamito Creek to Ft. Davis: Rebuild 69 kV line
ERCOT project 52464 · utility no. 2831
Sep 2027 → Mar 2028Alamito Creek, Ft Davis
Projected in-service dateEden to North Brady: Rebuild 69 kV line
Rehab Eden to North Brady 69 kV line
ERCOT project 54892 · utility no. 1856 · RPG 22RPG009
Nov 2027 → Sep 2028Eden, North Brady
Projected in-service dateBrushline: Construct New Distribution Station
Construct new 138/13 kV station Brushline
ERCOT project 55550 · utility no. 3826
Dec 2027 → Jul 2028Brushline
Projected in-service dateEscondido to Ganso: Rebuild 138 kV line
Rebuild 138 kV line from Escondido to Ganso
ERCOT project 55624 · utility no. 3825
Feb 2028 → Sep 2028Escondido, Ganso
Projected in-service dateGanso to Hamilton Road: Rebuild 138 kV line
Rebuild 138 kV line from Ganso to Hamilton Road
ERCOT project 55626 · utility no. 3824 · RPG 22RPG044
Feb 2028 → Sep 2028Maverick, Hamilton Road
Projected in-service dateNorth McAllen: Rebuild 138 kV Station
Rehab the North McAllen 138 kV station
ERCOT project 58010 · utility no. 3837
Apr 2027 → Sep 2028McAllen
Projected in-service dateCorichi to Victoria: Rebuild 138 kV Line
Rebuild the Corichi to Victoria 138 kV line
ERCOT project 59086 · utility no. TP2020888
Jan 2029 → Nov 2029Corichi, Victoria
Projected in-service dateRGEC Persimmon Gap Substation 69-kV Transmission Line Extension and Substation Expansion
Extend Alpine-Persimmon Gap 69-kV Transmission Line at Switch# 6669 and Install Circuit Switcher to accommodate new substation power transformer and distribution bays. New power transformer capacity will be 12/16/20 MVA.
ERCOT project 61232
Jan 2027 → Dec 2027Persimmon Gap
Projected in-service datePortilla: Construct New Distribution Station
Construct new distribution station on the Lon Hill to Warburton 138 kV line
ERCOT project 61394 · utility no. DP21X0008
Jun 2026 → Dec 2026Portilla
Projected in-service dateGVEC Kicaster Substation Addition (formerly Wilson South)
Add a new load-serving substation 4.35 miles south of La Vernia along FM 775 with a 40 MVA PWT.
ERCOT project 61444
Sep 2026 → Oct 2026Wilson South
Projected in-service dateClark Church/Birdhouse (Ottine New) Substation
Build New 138 Substation adjacent to LCRA Birdhouse station; replaces existing Ottine station, add 20MVA
ERCOT project 61449
Jul 2027 → Dec 2027Ottine
Projected in-service dateEast Munday to Lake Pauline: Rebuild 138 kV Line
Rehab East Munday to Lake Pauline 138 kV line
ERCOT project 61550 · utility no. 1874 · RPG 20RPG018
Apr 2030 → May 2029East Munday, Lake Pauline
Projected in-service dateMatador to Turkey: Rebuild 69 kV Line
Rebuild 69 kV line from Matador to Turkey
ERCOT project 61552 · utility no. 1873
Jul 2026 → May 2026Matador, Turkey
Projected in-service dateBarrilla Junction: 69 kV Loop Rebuild
Rebuild Barrilla Junction to Saragosa to Cherry Creek to Verhalen to Hoefs Road stations, convert to 138 kV
ERCOT project 64042 · utility no. 1886 · RPG 21RPG023
Mar 2027 → Nov 2026Barrilla Junction, Hoefs Road Station
Projected in-service dateBessel to King Ranch: 138 kV Line Rebuild
Rehab the Bessel to King Ranch 138 kV line
ERCOT project 64067 · utility no. TA2020081 · RPG 23RPG001
Feb 2029 → Jun 2028Bessel, Stratton
Projected in-service dateHyde Park to Downtown Ckt.32A Upgrades
Upgrade Hyde Park to Downtown Ckt.32A
ERCOT project 64499
Dec 2026 → Feb 2027Downtown, Hyde Park
Projected in-service dateMason Switch to Yellowjacket: Rebuild 69 kV Line
Rehab the Mason Switch to Yellowjacket 69 kV Line
ERCOT project 65154 · utility no. 2836 · RPG 21RPG014
Dec 2027 → Feb 2028Mason Switch, Yellowjacket
Projected in-service dateRebuild/reconductor portions of Ckt.05A Missouri City to Sienna as a Hardening upgrade(24RPG030).
Rebuild and reconductor portion of Missouri City to Sienna Ckt.05A as a Hardening upgrade
ERCOT project 65719 · RPG 24RPG030
Oct 2026 → Feb 2027Missouri City, Sienna
Projected in-service dateBallinger to Eden 69 kV line: Rebuild taps
Rebuild Taps on the Ballinger to Eden 69 kV line
ERCOT project 6572 · utility no. 2814
Jul 2027 → Jun 2027Ballinger, Eden
Projected in-service dateDel Sol to Frontera: Build New 345 kV Double Circuit Line
Build new 345 kV double circuit line from Del Sol to Frontera. Expand Frontera Station and install two (2) autotransformers.
ERCOT project 66101 · utility no. TP2020838 · RPG 21RPG017
Sep 2026 → Oct 2026Del Sol, Frontera
Projected in-service dateEast Levee - Industrial Blvd 138 kV DCKT Line
Rebuild East Levee - Industrial Blvd 138 kV DCKT Line
ERCOT project 66190 · utility no. M4213
May 2027 → Dec 2027East Levee, Industrial
Projected in-service dateUpgrade Palestine-Crockett 69 kV Line
Rebuild the Elkhart - Grapeland 69 kV Line
ERCOT project 66202B · utility no. R6182 · RPG 22RPG035
Sep 2026 → Dec 2026Elkhart, Grapeland
Projected in-service dateCruce to Reforzar: Construct New 345 kV Double Circuit Line
Construct a new 345 kV double circuit line from Cruce to Reforzar
ERCOT project 67320 · utility no. TP2022033 · RPG 21RPG017
Sep 2026 → Oct 2026Cruce, Reforzar
Projected in-service dateAjo to Reforzar: Construct New 345 kV Double Circuit Line
Construct a new 345 kV double circuit line from Ajo to Reforzar
ERCOT project 67326 · utility no. TP2022030 · RPG 21RPG017
Aug 2026 → Sep 2026Ajo, Reforzar
Projected in-service dateSan Miguel to Cruce 345 kV lines
New San Miguel to Cruce 345 kV double circuit lines
ERCOT project 67329 · RPG 21RPG017
Dec 2026 → Jan 2027San Miguel, Cruce
Projected in-service dateRosata: Build 138kV Substation
Build new Rosata 138 kV POD Switch on the Coleto Creek to Kenedy 138 kV line
ERCOT project 6749 · utility no. 3682
Jun 2026 → May 2026Rosata
Projected in-service dateShepley: Construct New Distribution Station
Construct new distribution station on the Victoria to Dupont Switch 138 kV line
ERCOT project 69489
Jul 2026 → Nov 2026Shepley
Projected in-service dateNew 138kV Brushy Creek Substation
ERCOT project 70282
Jun 2027 → Jun 2028Thompson Creek, Snook
Projected in-service dateNew Holleman Substation
ERCOT project 70299
Jun 2027 → Jun 2028Holleman
Projected in-service dateBRYN_Standard_PMCR_Dansby_Rebuild_fix
Reference Project 4577 which was added to convert Dansby 69kV bus to Breaker and a Half configuration
ERCOT project 70307A
Jun 2027 → Jun 2029None named
Projected in-service dateBRYN_Standard_PMCR_Dansby_Rebuild_fix
ERCOT project 70307B
Jun 2027 → Jun 2029None named
Projected in-service dateBallinger to Santa Anna: Rebuild 69 kV line
Rebuild 69 kV line and rebuild taps on the Ballinger to Santa Anna 69 kV line.
ERCOT project 70630 · utility no. TA2021193 · RPG 22RPG028
Feb 2030 → Mar 2029Ballinger, Santa Anna
Projected in-service datePlaza to Grant Ckt.08I Upgrade
Install parallel underground portion of Ckt.08I Plaza to Grant to increase thermal limits.
ERCOT project 70660
Jul 2026 → Aug 2026Plaza, Grant
Projected in-service dateClairmont Sun Oil Tap: Rebuild 69 kV Line
Rehab Clairmont Sun Oil Tap 69 kV Line
ERCOT project 70673 · utility no. TA2021233
Oct 2028 → Jan 2028Clairmont, Sun Clairmont
Projected in-service dateTungsten (Carbide): Rebuild 138/69 kV Station
Rehab the Tungsten (Carbide) 138/69 kV station
ERCOT project 70706 · RPG 21RPG024
Dec 2027 → Aug 2028Tungsten
Projected in-service dateRebuild Rio Colorado - Bay City
Rebuild Rio Colorado - Bay City 795 ACSR
ERCOT project 70884
Aug 2026 → Sep 2026Rio Colorado, Bay City
Projected in-service dateFlomot Tap: Rebuild 69 kV Line
Rehab Flomot Tap 69 kV Line
ERCOT project 70898
Jul 2026 → May 2026Flomot Tap, Flomot
Projected in-service dateTidehaven: Construct New Distribution Station
Construct new distribution station on the Blessing to Palacios 69 kV line
ERCOT project 71002 · utility no. 3767 DP21X0007
Apr 2027 → Nov 2027Tidehaven
Projected in-service dateUpgrade Pearsall Station
Upgrade Pearsall Station equipment for full auto xfmr ratings. (Upgrade station to breaker and a half is complete)
ERCOT project 71319
Dec 2026 → Jun 2027Pearsall
Projected in-service dateUpgrade STEC castroville to Pearson to 138kV
Upgrade STEC Bader station to 138kV. Upgrade STEC Castroville to bader and bader to pearson to 138kV
ERCOT project 71917 · RPG 22RPG022
Jun 2026 → Nov 2026Bader
Projected in-service dateClute 138kV Switching Station
Reconfigure existing Ckt.82F RIWOOD to CAVERN to BIPORT and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.82 RIWOOD to Clute to CAVERN to BIPORT.
ERCOT project 72044A · RPG 22RPG038
Dec 2027 → Mar 2028Clute, RIWOOD, CAVERN
Projected in-service dateClute 138kV Switching Station
Reconfigure existing Ckt.26D STRATT to SINTEK and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.26 STRATT to Clute to SINTEK.
ERCOT project 72044C · RPG 22RPG038
Dec 2027 → Mar 2028Clute, SINTEK
Projected in-service dateCedar Hill: Upgrade Relays
Upgrade relays for the Sterling City terminal and Miles terminal at the Cedar Hill 138 kV station
ERCOT project 72213 · utility no. TP2022739
Mar 2027 → May 2027Cedar Hill
Projected in-service dateHaskell to Munday: Rebuild 69 kV Line
Rehab Haskell to Munday 69 kV Line
ERCOT project 72999 · RPG 22RPG043
Oct 2028 → Jan 2029Haskell, Munday
Projected in-service dateTruscott Humble Tap: Rebuild 69 kV Line
Rehab Truscott Humble Tap 69 kV line
ERCOT project 73001
Nov 2031 → Dec 2031Moorhouse, Truscott Humble
Projected in-service dateMulberry Creek: Rebuild 138 kV Station
Rebuild Mulberry Creek 138 kV station
ERCOT project 73032 · RPG 25RPG034
Feb 2027 → Nov 2027Mulberry Creek
Projected in-service dateBarrera: Construct New Distribution Station
Construct new distribution station on the North Laredo Switch to Reveille 138 kV line
ERCOT project 73059
Nov 2026 → Aug 2027Barrera
Projected in-service dateBig Foot to Lytle: Convert to 138 kV
Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station
ERCOT project 73063 · utility no. TP2022155
Nov 2026 → Feb 2027Big Foot, Lytle
Projected in-service dateMarina: Construct New Station
Construct new network station on the Highway 9 to Morris St and Nueces Bay 138 kV lines
ERCOT project 73067
Feb 2027 → Nov 2027Marina
Projected in-service dateCastroville Cut-in 138 kV
Cut the AEP line from Quihi to CPS Castroville into the newly converted to 138 kV STEC Castroville station.
ERCOT project 73098 · RPG 22RPG022
Nov 2026 → May 2027Quihi, Castroville (CPS)
Projected in-service dateAsherton to Piloncillo: Rebuild 138 kV Line
Rehab the Asherton to Piloncillo 138 kV line
ERCOT project 73100
Dec 2027 → Jan 2028Asherton, Piloncillo
Projected in-service datePH Robinson Area 138kV Upgrades
Increase thermal limits through the application of 110% Emergency ratings for Ckt.79C BIGBAY to BAYOU. Request customers to approve the 110% Emergency rating of relevant equipment at Bigbay substation on the Ckt.79C line position. Bayou substation equipment has been upgraded and meets the Minimum ratings as of April 2025.
ERCOT project 73352C
Jul 2026 → Dec 2026BIGBAY, BAYOU
Projected in-service dateBerry Creek Substation Addition
Substation addition to provide Point of Interconnection for Oncor Andice substation addition.
ERCOT project 73567
Dec 2028 → May 2029Berry Creek
Projected in-service dateSteger Substation Addition
Substation addition to provide Point of Interconnection for Oncor New Sweden substation addition.
ERCOT project 73570
May 2028 → May 2029Steger
Projected in-service dateThis converts Bell County to Gabriel to 138 KV
ERCOT project 75524
Dec 2026 → Nov 2027Bell County, Gabriel
Projected in-service dateInstall new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar
Install new 345kV Speedway (SPD) substation for generator interconnection to CRADLE/ Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW.
ERCOT project 75810A
May 2027 → Aug 2027Speedway, DOW, Oasis
Projected in-service dateInstall new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar
Install generator lead from Speedway (SPD) substation to CRADLE (CDL) customer substation (23INR0150).
ERCOT project 75810B
May 2027 → Aug 2027Speedway, CRADLE
Projected in-service dateRebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A.
Rebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion.
ERCOT project 75856A
Mar 2027 → Aug 2027ETHYL, South Channel
Projected in-service dateRebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A.
Convert ETHYL customer 69kV substation to 138kV. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A.
ERCOT project 75856B
Mar 2027 → Aug 2027ETHYL, PHILIP, BEARLE
Projected in-service dateUnion Carbide: Rebuild 138 kV Station
Rebuild Union Carbide as new AIS station Chalybe
ERCOT project 76082
May 2027 → Aug 2028Union Carbide
Projected in-service dateLobo: 138 kV Breaker Replacement
Replace 138 kV breakers at the Lobo 138 kV station
ERCOT project 76196 · utility no. TP2023015
May 2027 → May 2028Lobo
Projected in-service dateLytle: Construct New 138 kV Terminal
Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station
ERCOT project 76242 · utility no. TP2022155
Nov 2026 → Feb 2027Lytle
Projected in-service dateHecker to Resnik: Rebuild 138 kV Line
Rebuild the Hecker to Resnik 138 kV line
ERCOT project 76286 · utility no. TP2023506
Jul 2026 → Feb 2028Hecker, Resnik
Projected in-service dateUpgraded Cedarvale–BoneSpringsTap–Fishhook
ERCOT project 76291
Oct 2027 → Jul 2027Cedarvale to Bone Springs Tap, Bone Springs Tap to Fishhook
Projected in-service dateUpgraded Cedvale-MiDiva138KV
ERCOT project 76293
Oct 2027 → Apr 2027Cerdarvale, Midiva
Projected in-service dateAsherton: Rebuild 138 kV station
Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station
ERCOT project 76569 · RPG 23RPG007
Aug 2027 → May 2027Asherton
Projected in-service dateUpgrade Victoria-Rayburn
Upgrade Victoria- Loop 463- Rayburn to 403 MVA
ERCOT project 76788
Dec 2026 → Mar 2026Rayburn, Victoria
Projected in-service dateOcelot: Construct New 138 kV Station
Interconnect the Ocelot load to the new Ocelot 138 kV station on the Military Highway to Palo Alto 138 kV line
ERCOT project 76914
Oct 2026 → Mar 2027Ocelot
Projected in-service dateLas Lomas: Construct New Distribution Station
Construct new distribution station on the La Grulla to Rio Grande City 138 kV line
ERCOT project 77031 · utility no. DP24X0003
Nov 2027 → Mar 2029Las Lomas
Projected in-service datePompano: New 138 kV Station
Final Station
ERCOT project 77144B · utility no. TP2015151
Jan 2028 → Mar 2028Pompano
Projected in-service dateHays Hill (fka Rock Draw) 345 kV Switch
Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013)
ERCOT project 78044 · utility no. R8716 · RPG 23RPG013
May 2027 → Dec 2027Sand Lake, North McCamey
Projected in-service dateBlue Goose (fka Toyah Creek) 345 kV Switch
Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013)
ERCOT project 78046 · utility no. R8715 · RPG 23RPG013
Dec 2027 → May 2027Sand Lake, Solstice
Projected in-service dateWest Columbia to Damon and Needville to Big Creek Ckt.89A Upgrades
Rebuild/reconductor portions of West Columbia to Damon Ckt.89A as a Hardening upgrade.
ERCOT project 78461A · RPG 23RPG021
Dec 2027 → May 2028West Columbia, Damon
Projected in-service datePradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102)
New 345kV Pradera (PRD) substation for generator interconnection to Austin Bayou Solar (25INR0102). Loop Ckt.27 into Pradera substation to create new Ckt.27 Seabreeze to Pradera to Savannah.
ERCOT project 78468A
Sep 2027 → Jan 2028Pradera, Savannah, Seabreeze
Projected in-service datePradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102)
Install generator lead from Pradera (PRD) substation to AUSTIN (ABY) customer substation (25INR0102).
ERCOT project 78468B
Sep 2027 → Jan 2028Pradera, AUSTIN
Projected in-service dateRebuild Oaks to Poteet to Pearsall 69 kV line
Rebuild Oaks to Poteet to Pearsall 69 kV line from 4/0 to 795. 2023 RTP
ERCOT project 78478
Oct 2026 → Dec 2026Oaks, Pearsall
Projected in-service dateRebuild Nada to El Campo 69 kV line
Rebuild Nada to El Campo 69 kV line from 4/0 to 795. 2023 RTP
ERCOT project 78483
Jul 2026 → Sep 2026Nada, El Campo
Projected in-service dateBritmoore to Bellaire Ckt.24B Upgrades
Upgrade Ckt.24B Hayes to Britmoore to increase thermal limits.
ERCOT project 78485F · RPG 23RPG025
Jul 2026 → Aug 2026Hayes, Britmoore
Projected in-service dateLoop new Ancla CEHE 138kV substation into Ckt.04E Angleton to West Columbia to create new Ckt.04 Angleton to Ancla to West Columbia. Install one generator lead from Ancla CEHE 138kV substation to ROYAL / Royal River BESS.
Install one generator lead from Ancla CEHE 138kV substation to ROYAL / Royal River BESS.
ERCOT project 79451B
Oct 2027 → Jun 2028Ancla, ROYAL
Projected in-service dateLucero: Construct New 345 kV Station
Interconnect SanPat Solar I and SanPat Solar II to the new Lucero 345 kV station on the Angstrom to Naismith 345 kV line
ERCOT project 79988
Nov 2026 → Sep 2027Lucero
Projected in-service dateBig Foot to Pearsall: Convert to 138 kV
Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch
ERCOT project 80315 · utility no. 3821 · RPG 23RPG024
Dec 2027 → Feb 2028Big Foot, Pearsall
Projected in-service dateDilley Switch to Pearsall: Convert to 138 kV, Reroute from Dilley to Dilley Switch, Rebuild Dilley to Dilley Switch 69 kV, and Double Circuit Dilley Switch to Pearsall with Dilley to Dilley Switch
Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch
ERCOT project 80317 · utility no. 3822 · RPG 23RPG024
Dec 2027 → Feb 2028Dilley Switch, Pearsall
Projected in-service dateDevine: Install Cap Bank
Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch
ERCOT project 80319 · utility no. TA2018040 · RPG 23RPG024
Dec 2026 → Feb 2028Devine
Projected in-service dateNo title printed
Reroute East to Rodgers 69kV line to create East to Rayburn 69kV line to accommodate the TXDOT SH6 project.
ERCOT project 80404
Jan 2027 → Apr 2027BRYN EAST, RAYBURN
Projected in-service dateNo title printed
Rebuild / Reconductor Greens Prairie to South Switch 138kV Line
ERCOT project 80420
Jun 2027 → Jun 2028South Switch, Greens Pairie
Projected in-service dateAdd_Triangle_Park_Load
Adding second distribution transformer at Triangle Park
ERCOT project 80422
Jan 2027 → Jun 2027Triangle Park
Projected in-service dateNo title printed
Rebuild / Reconductor Dansby to Business Park 69kV for Rail Spur
ERCOT project 80424
Jun 2027 → Jun 2028Dansby, Business Park
Projected in-service dateClosner: Construct New 138 kV Terminal
Interconnect Gunnar BESS to the Closner 138 kV station
ERCOT project 80484
Jun 2026 → Nov 2026Closner
Projected in-service dateUpgrade the Hutto & Round Rock - Salado 138 kV Line
Rebuild and double-circuit the Georgetown East - Sonterra 138 kV Line Section
ERCOT project 80546C · utility no. R6203, R6202 · RPG 24RPG018, 25RPG006 · RTP 2023-SC17
Dec 2026 → May 2027Georgetown East, Sonterra
Projected in-service dateChalmers: Construct New Distribution Station
Construct new distribution station on the Lane City to Magill 138 kV line
ERCOT project 80576
Aug 2027 → Oct 2027Chalmers
Projected in-service dateAngstrom to STP: Increase 345 kV Line MOT
Increase the MOT on the Angstrom to STP 345 kV line
ERCOT project 80630
Jun 2026 → Nov 2026Angstrom, STP
Projected in-service dateLon Hill to Sinton: Bypass Waterworks 69 kV station
Relocate portion of 69 kV line between Odem and Stevens Tap to bypass Waterworks 69 kV station
ERCOT project 80850
Oct 2027 → Dec 2027Odem, Stevens Tap
Projected in-service dateSterling City: Upgrade 69 kV Relays
Upgrade relays at the Sterling City 69 kV station on the Angora 69 kV terminal
ERCOT project 80858
Apr 2027 → Aug 2027Sterling City
Projected in-service dateFort Stockton Plant: Rebuild 138/69 kV Station
Rebuild the Fort Stockton Plant 138/69 kV station
ERCOT project 80907 · RPG 25RPG032
Nov 2027 → Apr 2028Fort Stockton Plant
Projected in-service dateDIABOX Customer Load Addition with related line upgrades
Upgrade Ckt.21E MOMENT to SOLMER to SR Bertron to increase thermal limits
ERCOT project 81006
Jul 2026 → Aug 2026SOLMER, SR Bertron, MOMENT
Projected in-service dateBuford (fka China Grove) to Tributary 138 kV Line Rebuild
Rebuild Buford (fka China Grove) to Tributary 138 kV Line Rebuild
ERCOT project 81152 · utility no. R8656 · RPG 26RPG010
May 2027 → Oct 2027Rebuild Buford (fka China Grove), Tributary Switch
Projected in-service dateOklaunion: Reconfigure 138 kV Station
Reconfigure the Oklaunion 138 kV station from a straight bus to a ring bus
ERCOT project 81215
Nov 2026 → May 2027Oklaunion
Projected in-service dateZoisite: Construct New 345 kV Station and 345 kV Lines to STP
Interconnect the HIF load to the new Zoisite 345 kV station and construct two new STP to Zoisite 345 kV lines. Install two (2) capacitor banks.
ERCOT project 81238 · utility no. TP2023803
May 2028 → Dec 2028STP, Zoisite
Projected in-service dateRio Pecos: Upgrade 138 kV Terminals
Upgrade the Soaptree and Whitebaker 138 kV terminals at the Rio Pecos 138 kV station
ERCOT project 81368
Mar 2027 → Dec 2026Rio Pecos
Projected in-service dateOncor_FW_81410_Averitt Synchronous Condenser
Add Averitt Switch Synchronous Condenser
ERCOT project 81410 · utility no. D20231 · RPG 23RPG029
Mar 2027 → Aug 2026Averitt
Projected in-service dateRio Medina substation
Adds Rio Medina Load serving station
ERCOT project 81590
Jan 2027 → Nov 2026Rio Medina
Projected in-service dateDunlay substation
Adds STEC Dunlay Load serving station
ERCOT project 81594
Jul 2026 → Nov 2026Dunlay
Projected in-service dateOlmos to LaVernia TL, T533
Olmos to LaVernia TL, Rebuild 5.1 miles of 69 kV line to 138 kV transmission line
ERCOT project 85955
Dec 2028 → May 2028Olmos, LaVernia
Projected in-service dateRGEC_Altuda 69-kV In-line_Breaker_Installation
Install 69-kV breaker between Alpine Switch and Persimmon Gap substation at Altuda substation.
ERCOT project 85965
Dec 2026 → Dec 2027Alpr2A, PrsmnGap2A
Projected in-service dateExpand ADLONG substation for XE Murat Storage (24INR0329)
Expand facilities at customer-owned ADLONG substation for XE Murat Storage (24INR0329). Utilize existing generator lead Eastgate to XE Murat Solar.
ERCOT project 86009
Jul 2026 → Aug 2026Eastgate, ADLONG
Projected in-service dateSnug 138kV Substation expansion for Cottonwood Bayou Storage (21INR0443)
Install Cottonwood Bayou Storage (21INR0443) at Snug 138kV substation. Connect at the same generator lead as Cottonwood Bayou Solar.
ERCOT project 86011
Jul 2026 → Aug 2026Snug
Projected in-service dateScissortail: Construct New 138 kV Station
Interconnect the TNMP Flycatcher station to the new Scissortail 138 kV station on the Saragosa to Solstice 138 kV line between Hoef's Road and Verhalen
ERCOT project 86771
Dec 2026 → Mar 2027Scissortail
Projected in-service dateAdd Dansk load serving substation
Cuts in new Dansk load serving station on existing Red Bluff to Danevang transmission line
ERCOT project 86782
Dec 2026 → Apr 2027None named
Projected in-service dateBuccaneer: Construct New 69 kV Station
Interconnect the Oncor Regency station to the new Buccaneer 69 kV station on the Eden to North Brady 69 kV line between Melvin and North Brady
ERCOT project 86796
Dec 2026 → Jan 2027Buccaneer
Projected in-service dateSaragosa: Construct New 138 kV Terminal
Interconnect Bracero Pecan Storage to the Saragosa 138 kV station
ERCOT project 86884
Apr 2027 → Apr 2028Saragosa, Bracero Pecan
Projected in-service datePrimavera: Construct New 138 kV Terminal
Interconnect Project Lynx Storage to the Primavera 138 kV station
ERCOT project 87031 · utility no. TP2024100
Jun 2026 → Mar 2026Primavera
Projected in-service dateEstablish Fallstown Switch – Pleasant Valley/Fisher Road 138 kV Double-Circuit Line and Fallstown Switch – Ceramic/Wichita Falls PPG 138 kV Double-Circuit Line
ERCOT project 87413 · utility no. R4024
Feb 2027 → Dec 2026Fallstown Switch, Pleasant Valley, Fisher Road
Projected in-service dateCarver to Poblano: Convert 69 kV Line to 138 kV
Convert the Sonora to Uvalde 69 kV line to 138 kV and reterminate at Carver and Poblano
ERCOT project 87648 · utility no. TP2024058 · RPG 24RPG009
Dec 2028 → Jan 2031Carver, Poblano
Projected in-service dateBell County - Poage - Seaton 69 kV Line Conversion to 138 kV
ERCOT project 87697 · utility no. R6367 · RPG 24RPG001
May 2028 → Mar 2027Bell County, Seaton
Projected in-service dateEstablish a 110.4 MVAR Capacitor Bank at Midnight 138 kV Substation
ERCOT project 87770 · utility no. R6346
May 2029 → May 2030Midnight
Projected in-service dateOlmos to Wilson T297 Transmission Line Rebuild
Rebuild 7.18 miles of 138 kV from 477 conductor wood pole line to 795 drake conductor concrete/steel transmission line
ERCOT project 89912
Dec 2026 → May 2027Olmos, Wilson
Projected in-service dateWhaley 345kV Substation Expansion for ROSE/Rock Rose Energy BESS (26INR0201)
Expand Whaley 345kV Substation for ROSE / Rock Rose Energy BESS (26INR0201). Connect generator through one new generator lead.
ERCOT project 89922
Oct 2027 → Mar 2027Waterhole
Projected in-service dateUpgrade San Diego - Orange Grove SW
Upgrade San Diego - Orange Grove SW to 795 ACSR. 2024 RTP
ERCOT project 90000
May 2029 → Jun 2028San Diego, Orange Grove SW
Projected in-service dateTango to Pawnee: Rebuild 345 kV Line
Rebuild the Tango to Pawnee 345 kV line
ERCOT project 90008 · utility no. TP2024118 · RPG 22RPG048
Feb 2027 → May 2027Tango, Pawnee
Projected in-service dateFestin: Construct New 345 kV Station
Interconnect Sunscape Renewable Solar and Storage to the new Festin 345 kV station on the Lon Hill to Reforzar 345 kV line
ERCOT project 90025 · utility no. TP2024111
May 2028 → Jul 2028Festin
Projected in-service dateCross Plains to Rising Star: Rebuild 69 kV Line
Rehab the Cross Plains to Rising Star 69 kV line
ERCOT project 90027
May 2029 → May 2030Cross Plains, Rising Star
Projected in-service dateEdith Clarke: Expand 345 kV Station
Interconnect Seine BESS to the existing Edith Clarke 345 kV station
ERCOT project 90035 · utility no. TP2024193
Jul 2027 → Dec 2027Edith Clarke
Projected in-service dateDokmai: Construct New 138 kV Station
Interconnect Hyfuels Western Farmland Wind to the new Dokmai 138 kV station on the Cangrejo to Dacosta 138 kV line between Beecher and Cangrejo
ERCOT project 90053 · utility no. TP2024120
Mar 2027 → Oct 2027Dokmai
Projected in-service dateCascabel: Construct New 345 kV Station
Interconnect Moccasin Solar to the new Cascabel 345 kV station on the Clear Crossing to Figaro 345 kV line between Clear Crossing and Kirchoff
ERCOT project 90059 · utility no. TP2024121
Dec 2026 → Jan 2027Cascabel
Projected in-service dateAbilene Northwest to Mulberry Creek: Rebuild 138 kV Line
Rebuild the Abilene Northwest to Mulberry Creek 138 kV line
ERCOT project 90065 · utility no. TP2023881
Nov 2026 → Jan 2027Abilene Northwest, Mulberry Creek
Projected in-service dateInstall new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers.
Install new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers. Loop substation on Ckt.81G to create new Ckt.81G Pinehurst to Mill Creek to Tomball.
ERCOT project 90161A
Oct 2027 → Dec 2027Mill Creek, Pinehurst, Tomball
Projected in-service dateInstall new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers.
Convert Pinehurst to unity power factor substation.
ERCOT project 90161C
Dec 2026 → Dec 2027Pinehurst
Projected in-service dateFacility Ratings Methodology (FRM) Upgrades
Upgrade Ckt.03A PSARCO to BIGVUE to increase thermal limits as part of FRM upgrades
ERCOT project 90232A
Jul 2026 → Aug 2026PSARCO, BIGVUE
Projected in-service dateFacility Ratings Methodology (FRM) Upgrades
Upgrade Ckt.06D NASA to Webster to increase thermal limits as part of FRM upgrades
ERCOT project 90232C
Jul 2026 → Aug 2026NASA, Webster
Projected in-service dateFacility Ratings Methodology (FRM) Upgrades
Upgrade Bellaire to WAP Ckt.50A to increase thermal limits as part of FRM upgrades
ERCOT project 90232D
Jul 2026 → Aug 2026Bellaire, WA Parish
Projected in-service dateFacility Ratings Methodology (FRM) Upgrades
Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits as part of FRM upgrades
ERCOT project 90232E
Jul 2026 → Sep 2026Jeanetta, WA Parish
Projected in-service dateFacility Ratings Methodology (FRM) Upgrades
Upgrade Bellaire to Jeanetta Ckt.64B to increase thermal limits as part of FRM upgrades
ERCOT project 90232F
Jul 2026 → Aug 2026Bellaire, Jeanetta
Projected in-service dateFacility Ratings Methodology (FRM) Upgrades
Upgrade Stadium to Fannin Ckt.08B to increase thermal limits as part of FRM upgrades
ERCOT project 90232G
Jul 2026 → Aug 2026Stadium, Fannin
Projected in-service dateJordan / Mont Belvieu Area Improvement Project
Upgrade Ckt.86H BRINE to Mont Belvieu to increase thermal limits.
ERCOT project 90255D · RPG 24RPG026
Mar 2028 → Apr 2028BRINE, Mont Belvieu
Projected in-service dateFisk 345 kV Switch
Construct a new 345 kV Switch.
ERCOT project 91108 · utility no. R6328
Apr 2027 → Aug 2027Brown Switch, Central Bluff
Projected in-service dateWhite Mule (fka Elmar) 138 kV Substation Reconfiguration
Construct a new White Mule (fka Elmar) 138 kV Substation on the Quarry Field - Border 138 kV Line
ERCOT project 91664 · utility no. R8804
Jan 2027 → Dec 2026White Mule
Projected in-service dateInstall (1) 40 MVAr switchable cap bank at Hockley substation.
ERCOT project 91713
Dec 2027 → May 2027Hockley
Projected in-service dateEast Munday: Rebuild 138 kV Station
Rebuild the East Munday 138 kV station
ERCOT project 91843 · utility no. TP2023800 · RPG 25RPG002
May 2027 → May 2028East Munday
Projected in-service dateFort Stockton Plant to Solstice: Rebuild 138 kV Line
Rebuild the Fort Stockton Plant to Solstice 138 kV line and retire the PST at Solstice
ERCOT project 91853 · utility no. TP2025145 · RPG H.B. 5066
Nov 2029 → Nov 2028Fort Stockton Plant, Solstice
Projected in-service dateLa Palma to Stillman: Rebuild 138 kV Line
Rebuild the La Palma to Stillman 138 kV line
ERCOT project 91883 · utility no. TP2025011 · RPG 24RPG008
May 2028 → May 2030La Palma, Stillman
Projected in-service dateLa Palma to Military Highway: Rebuild 138 kV Line
Rebuild the La Palma to Military Highway 138 kV line
ERCOT project 91896 · utility no. TP2025011 · RPG 24RPG008
May 2028 → May 2030La Palma, Military Highway
Projected in-service dateIowa: Construct New Distribution Station
Construct new distribution station on the Bates to Liston 138 kV line
ERCOT project 91903
Oct 2028 → Feb 2029Iowa
Projected in-service dateCarver to Friend Ranch: Rebuild 138 kV Line
Rebuild the Carver to Friend Ranch 138 kV line
ERCOT project 91906 · utility no. TP2025168 · RPG H.B. 5066
May 2028 → Nov 2028Carver, Friend Ranch
Projected in-service dateCryo to Faulkner: Construct New 138 kV Line
Construct a new 138 kV single circuit line from Cryo to Faulkner
ERCOT project 91937 · utility no. TP2025146 · RPG H.B. 5066
Jan 2029 → Aug 2029Cryo, Faulkner
Projected in-service dateSolstice to Bottlebrush: Construct New 345 kV Double Circuit Line
Construct a new 345 kV double circuit line from Solstice to Bottlebrush
ERCOT project 91939 · utility no. TP2024076 · RPG H.B. 5066
Dec 2030 → Nov 2029Solstice, Bottlebrush
Projected in-service dateChelsea 138 kV Switch
ERCOT project 92625 · utility no. M5019
Jun 2026 → May 2027Chelsea Switch
Projected in-service dateJersey 138 kV Switch
ERCOT project 92655 · utility no. M3343
Aug 2026 → Dec 2026Jersey Switch
Projected in-service dateRenner Switch – Plano West Switch 138 kV Double-Circuit Line
Upgrade Renner Switch – Plano West Switch 138 kV Double-Circuit Line
ERCOT project 92867 · utility no. M4246
May 2029 → Dec 2029Renner, Plano West
Projected in-service dateCattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV Double-Circuit Line Rebuild 345 kV Double-Circuit Line Rebuild
Add Permian Basin Reliability Plan Upgrade ID L24A. LCRA and Oncor joint project to add L24A Upgrade the existing Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV double-circuit line
ERCOT project 93088A · utility no. PB_L24_A
Jun 2028 → Dec 2027Cattleman, Longshore
Projected in-service dateCattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV Double-Circuit Line Rebuild 345 kV Double-Circuit Line Rebuild
Add Permian Basin Reliability Plan Upgrade ID L24A. LCRA and Oncor joint project to add L24A Upgrade the existing Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV double-circuit line
ERCOT project 93088B · utility no. PB_L24_A
May 2030 → Jun 2028Cattleman, Longshore
Projected in-service dateLueders: Construct New Distribution Station
Construct new distribution station on the Fort Phantom to Paint Creek 138 kV line between California Creek and Fort Phantom
ERCOT project 93127 · utility no. DR23N0002
Nov 2026 → Dec 2026Lueders
Projected in-service dateDiablo: Construct New Distribution Station
Construct new distribution station on the North McCamey to Palouse 138 kV line between Crossover and Palouse
ERCOT project 93163 · utility no. DR24N0002
May 2027 → Feb 2028Diablo
Projected in-service dateBent Tree 138 kV Substation
Establish Bent Tree 138 kV Substation with 55.2 MVAR capacitor bank using 3-18.4 MVAR stages
ERCOT project 93191 · utility no. R6388
Dec 2026 → May 2027Bent Tree Substation
Projected in-service dateSolstice to Hayter Tap: Rebuild 138 kV Line Double Circuit
Rebuild the Solstice to Hayter Tap 138 kV line as a double circuit
ERCOT project 98561 · RPG H.B. 5066
May 2028 → Nov 2028Solstice, Hayter Tap
Projected in-service dateOso Creek to Westside: Construct New 138 kV Line
Construct a new 138 kV single circuit line from Oso Creek to Westside
ERCOT project 98569 · utility no. TP2025225
May 2029 → Jun 2029Oso Creek, Westside
Projected in-service dateQuanah: Rebuild 69 kV Station
Rehab Quanah 69 kV station
ERCOT project 98593 · utility no. TA2018027
Dec 2026 → Jan 2027Quanah
Projected in-service dateSolstice to Howard: Construct New 765 kV Single Circuit Line
Construct a new 765 kV single circuit line from Solstice to Howard
ERCOT project 98595 · RPG H.B. 5066
Jan 2029 → Oct 2030Solstice, Howard
Projected in-service datePlover: Rebuild 69 kV Station
Rebuild Eldorado Cities Service Co. Tap and rename to Plover
ERCOT project 98612
Dec 2026 → Jun 2027Plover
Projected in-service dateDotterel: Rebuild 69 kV Station
Rebuild Middle Valley REA Tap and rename to Dotterel
ERCOT project 98616
Dec 2026 → Jun 2027Dotterel
Projected in-service dateClaror: Construct New 345 kV Station
Interconnect Bigway Solar I and II to the new Claror 345 kV station on the Edith Clarke to Cottonwood 345 kV line
ERCOT project 98802 · utility no. TP2025175
May 2027 → Oct 2027Claror
Projected in-service dateBRYN_99100_RELLIS_CAPS
Install first 54 MVAr (in three 18 MVAr stages) 138-kV capacitor bank at RELLIS
ERCOT project 99100A · RPG 25RPG001
Jun 2027 → Jun 2028RELLIS
Projected in-service dateBRYN_99100_RELLIS_CAPS
Install second 54 MVAr (in three 18 MVAr stages) 138-kV capacitor bank at RELLIS
ERCOT project 99100B · RPG 25RPG001
Jun 2027 → Jun 2028RELLIS
Projected in-service dateBRYN_99117_ATK-TAMU_UPGRADE
Re-build the existing Atkins to TAMU 138-kV single-circuit transmission line on double-circuit capable structures with one circuit in place with normal and emergency ratings of at least 495 MVA and 521 MVA, respectively, approximately 3.3-mile.
ERCOT project 99117 · RPG 25RPG001
Oct 2029 → Oct 2030Atkins, TAMU
Projected in-service dateRebuild Flower Grove - Vincent 138 kV Line Rebuild
Upgrade the existing Flower Grove - Vincent 138 kV Line Section
ERCOT project 99141 · utility no. R8736
Dec 2028 → Dec 2029Flower Grove, Vincent
Projected in-service dateTH Wharton CB2 Cap Bank
Remove 120 MVAR CB1 cap bank from Velasco substation. Install removed CB1 cap bank at TH Wharton substation as replacement for THW CB2.
ERCOT project 99399
Jul 2026 → Aug 2026Velasco, TH Wharton
Projected in-service dateDaybreak_Substation_Addition
Substation addition to provide Point of Interconnection for Oncor's Good Morning substation addition. Requires coordination with Oncor.
ERCOT project 99411
Dec 2026 → Dec 2029Daybreak, Good Morning
Projected in-service dateFacility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.69B Greens Bayou to Deepwater to increase thermal limits as part of FRM2 upgrades
ERCOT project 99453B
Dec 2026 → Mar 2028Greens Bayou, Deepwater
Projected in-service dateFacility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.97B King to North Belt to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453E
Oct 2026 → May 2027King, North Belt
Projected in-service dateFacility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.97C Jordan to King to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453H
Jul 2026 → Nov 2026Jordan, King
Projected in-service dateFacility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.02B WA Parish to Nash to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453I
Jul 2026 → Nov 2026WA Parish, Nash
Projected in-service dateFacility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.75H King to Rothwood to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453M
Jul 2026 → Aug 2026King, Rothwood
Projected in-service dateFacility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.62B Waterhole to Jones Creek to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453P
Oct 2026 → Nov 2026Waterhole, Jones Creek
Projected in-service dateDeep Creek - Snyder - China Grove 138 kV Line Rebuild
Add Permian Basin Reliability Plan Upgrade ID L22E. Upgrade the existing Deep Creek - China Grove 138-kV line
ERCOT project 99530 · utility no. PB_L22_E
Dec 2028 → Oct 2028Deep Creek, China Grove
Projected in-service dateEstablish Guthrie 138 kV Switch
Establish 138 kV Switch
ERCOT project 99532 · utility no. R8916
May 2027 → May 2028Big Spring Switch, Tributary
Projected in-service dateEstablish Belltown 138 kV Switch
ERCOT project 99605 · utility no. R6414
May 2028 → May 2030Belltown 138 kV Switch
Projected in-service dateUpgrade Redland Switch - Herty Tap 138 kV Line Section
ERCOT project 99624 · utility no. R6291
Dec 2027 → May 2027Redland 138 kV Switch, Herty Tap
Projected in-service dateStatic: Expand 345 kV Station
Install two 345 kV breakers at the existing Static 345 kV station
ERCOT project 99641 · utility no. TP2025246
Jun 2026 → Oct 2026Static
Projected in-service dateLaredo VFT North: 138 kV Breaker Addition
Install additional 138 kV breaker on the Lobo circuit #1 138 kV terminal at the Laredo VFT North 138 kV station
ERCOT project 99744
Jun 2026 → Apr 2026Laredo VFT North
Projected in-service dateAdditional Facility Ratings Methodology Phase 2 (FRM2) Substation Upgrades.
Upgrade Ckt.79C BIGBAY to BAYOU to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99791B
Jul 2026 → Dec 2026BIGBAY, BAYOU
Projected in-service dateFrontera: 138 kV Breaker Replacement
Replace 138 kV breakers at the Frontera 138 kV station
ERCOT project 99794 · utility no. TP2025213
Mar 2028 → Nov 2028Frontera
Projected in-service dateBoiken: Construct New 345 kV Station
Interconnect Lancium data center load to the new Boiken 345 kV station on the Tesla to Tule Canyon 345 kV line
ERCOT project 99825 · utility no. TP2025947
Jun 2028 → Apr 2028Boiken
Projected in-service dateKirkland 138 kV Capacitor Bank
ERCOT project 99941 · utility no. M4022
Dec 2026 → May 2027Kirkland

Every release

Data as ofWorkbookProjectsFirst listedDate changesTab movesNo longer listed
October 1, 2026 ERCOT-October-TPIT-No-Cost-100126.xlsx 2,203 115 250 118 34
July 13, 2026 ERCOT-July-Ad-Hoc-TPIT-No-Cost-071326-UPDATE.xlsx 2,122 44 99 15 4
July 13, 2026 ERCOT July Ad-Hoc TPIT No Cost 071326.xlsx
from ERCOT’s archive
2,082 404 148 58 11
June 1, 2026 ERCOT June TPIT No Cost 060126.xlsx
from ERCOT’s archive
1,689 258 212 101 24
February 1, 2026 ERCOT-February-TPIT-No-Cost-020126.xlsx
from ERCOT’s archive
1,455 58 366 416 28
+260 off Completed
October 1, 2025 ERCOT-October-TPIT-No-Cost-100125.xlsx
from ERCOT’s archive
1,685 318 305 93 10
+4 off Completed
June 1, 2025 ERCOT-June-TPIT-No-Cost-060125.xlsx
from ERCOT’s archive
1,381 200 140 299 24
+77 off Completed
February 1, 2025 ERCOT February TPIT No Cost 020125.xlsx
from ERCOT’s archive
1,282 110 315 110 21
+202 off Completed
October 1, 2024 ERCOT-October-TPIT-No-Cost-100124.xlsx
from ERCOT’s archive
1,395 200 262 60 7
+1 off Completed
June 1, 2024 ERCOT-June-TPIT-No-Cost-060124.xlsx
from ERCOT’s archive
1,203 169 255 163 17
February 1, 2024 ERCOT-February-TPIT-No-Cost-020124.xlsx
from ERCOT’s archive
1,051 75 347 154 19
+220 off Completed
October 1, 2023 ERCOT-October-TPIT-No-Cost-100123.xlsx
from ERCOT’s archive
1,215 143 204 105 17
+2 off Completed
May 12, 2023 ERCOT-May-TPIT-No-Cost-051223.xlsx
from ERCOT’s archive
1,091 145 223 42 34
+1 off Completed
February 1, 2023 ERCOT-February-TPIT-No-Cost-020123.xlsx
from ERCOT’s archive
981 90 158 94 32
+243 off Completed
October 1, 2022 ERCOT October TPIT No Cost 100122.xlsx
from ERCOT’s archive
1,166 139 215 72 17
+4 off Completed
June 1, 2022 ERCOT June TPIT No Cost 060122.xlsx
from ERCOT’s archive
1,048 124 106 159 6
+2 off Completed
February 1, 2022 ERCOT_February_TPIT_No_Cost_020122.xlsx
from ERCOT’s archive
932 89 183 97 12
+231 off Completed
October 1, 2021 ERCOT_October_TPIT_No_Cost_100121.xlsx
from ERCOT’s archive
1,086 99 129 61 17
+1 off Completed
June 1, 2021 ERCOT_June_TPIT_No_Cost_060121.xlsx
from ERCOT’s archive
1,005 113 137 142 8
February 1, 2021 ERCOT_February_TPIT_No_Cost_020121.xlsx
from ERCOT’s archive
900 78 224 104 22
+249 off Completed
October 1, 2020 ERCOT_October_TPIT_No_Cost_100120.xlsx
from ERCOT’s archive
1,093 67 124 46 4
+1 off Completed
June 1, 2020 ERCOT_June_TPIT_No_Cost_060120.xlsx
from ERCOT’s archive
1,031 89 169 111 23
+1 off Completed
February 1, 2020 ERCOT_February_TPIT_No_Cost_020120.xlsx
from ERCOT’s archive
966 124 249 121 16
+242 off Completed
October 1, 2019 ERCOT October TPIT No Cost 100119.xlsx
from ERCOT’s archive
1,100 80 133 63 3
+3 off Completed
June 1, 2019 ERCOT_June_TPIT_No_Cost_060119_.xlsx
from ERCOT’s archive
1,026 0 2 0 0
June 1, 2019 ERCOT_June_TPIT_No_Cost_060119_old.xlsx
from ERCOT’s archive
1,026 95 211 127 12
+1 off Completed
February 1, 2019 ERCOT_February_TPIT_No_Cost_020119.xlsx
from ERCOT’s archive
944 121 276 99 40
+160 off Completed
October 1, 2018 ERCOT_October_TPIT_No_Cost_100118.xlsx
from ERCOT’s archive
1,023 66 127 51 12
+12 off Completed
June 1, 2018 ERCOT_June_TPIT_No_Cost_060118.xlsx
from ERCOT’s archive
981 98 151 102 12
+1 off Completed
February 1, 2018 ERCOT February TPIT No Cost 020118.xlsx
from ERCOT’s archive
896 82 219 75 32
+223 off Completed
October 1, 2017 ERCOT October TPIT No Cost 100117.xlsx
from ERCOT’s archive
1,069 40 153 46 6
+1 off Completed
June 1, 2017 ERCOT June TPIT No Cost 060117.xlsx
from ERCOT’s archive
1,036 114 143 112 15
+1 off Completed
February 1, 2017 ERCOT February TPIT No Cost 020117.xlsx
from ERCOT’s archive
938 153 166 69 24
+194 off Completed
October 1, 2016 ERCOT October TPIT No Cost 100116.xlsx
from ERCOT’s archive
1,003 35 138 81 9
+2 off Completed
June 1, 2016 ERCOT June TPIT No Cost 060116.xlsx
from ERCOT’s archive
979 120 164 114 67
+1 off Completed
February 1, 2016 ERCOT February TPIT No Cost 020116.xlsx
from ERCOT’s archive
927 120 200 91 102
+180 off Completed
October 1, 2015 ERCOT October TPIT No Cost 100115.xlsx
from ERCOT’s archive
1,089 52 147 63 9
+3 off Completed
June 1, 2015 ERCOT June TPIT No Cost 060115.xlsx
from ERCOT’s archive
1,049 135 221 101 28
+4 off Completed
February 1, 2015 ERCOT February TPIT No Cost 020115.xlsx
from ERCOT’s archive
946 baseline

Counts compare each release with the one before it. ERCOT’s Completed tab keeps recent completions only, so each new year’s first release drops the older ones; those are counted separately as “off Completed.” A project that is no longer listed is reported as exactly that, not as cancelled.

Before relying on any of this