Cruce
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Jim Hogg County. First named in the release with data as of June 1, 2024.
Described as new. The quoted wording calls this substation new. “Cruce: Construct New 345 kV Station” — project 67318 title, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Jim Hogg, TX: ERCOT queue, 9 active of 9. Same county, not the same substation.
Location
Jim Hogg County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: TPIT lists 67318 as Under Construction with ISD 2026-11, so the station may enter service soon.
Sources: PUCT Docket 55151, Order: Cruce-to-Del Sol double-circuit 345-kV transmission line (2024-02-01), Order p.4, finding 15 · PUCT Docket 55397, Order: Cruce-to-Reforzar 345-kV transmission line (2024-01-29), Order p.2, finding 9 · AEP Texas / STEC / ETT, Cruce-to-Del Sol 345-kV line, notice map (Attachment 9b) (2022-2023), p.1, main map and inset · ERCOT TPIT, projects 67318, 67320, 67322, 67324 (release 39, 2026-10-01). Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Cruce: Construct New 345 kV Station Construct a new 345 kV station on the Cenizo to Reforzar 345 kV line and the Del Sol to San Miguel 345 kV line ERCOT project 67318 · utility no. TP2022034 · RPG 21RPG017 |
AEP TCC Tier 1 |
Under Construction Current-year planned tab |
345 | Nov 2026 | Cruce Jim Hogg County |
Cruce |
| Cruce to Reforzar: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Cruce to Reforzar ERCOT project 67320 · utility no. TP2022033 · RPG 21RPG017 |
AEP TCC Tier 1 |
Under Construction Current-year planned tab |
345 | Oct 2026 | Cruce to Reforzar Jim Hogg / Brooks County |
Cruce, Reforzar |
| Cenizo to Cruce: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Cenizo to Cruce ERCOT project 67322 · utility no. TP2022031 · RPG 21RPG017 |
AEP TCC/ETT Tier 1 |
Under Construction Current-year planned tab |
345 | Nov 2026 | Cenizo to Cruce Webb / Jim Hogg County |
Cenizo, Cruce |
| Cruce to Del Sol: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Cruce to Del Sol ERCOT project 67324 · utility no. TP2022032 · RPG 21RPG017 |
AEP TCC/ETT Tier 1 |
Under Construction Current-year planned tab |
345 | Nov 2026 | Cruce to Del Sol Jim Hogg / Starr County |
Cruce, Del Sol |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 67320 | Projected in-service date | Sep 2026 → Oct 2026 |
| February 1, 2026 | 67318 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 67320 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 67322 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 67324 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 67318 | Status as reported | Planned → Under Construction |
| October 1, 2025 | 67320 | Status as reported | Planned → Under Construction |
| October 1, 2025 | 67322 | Status as reported | Planned → Under Construction |
| October 1, 2025 | 67324 | Status as reported | Planned → Under Construction |
| February 1, 2025 | 67320 | Projected in-service date | Jan 2027 → Sep 2026 |
| October 1, 2024 | 67320 | Projected in-service date | Nov 2026 → Jan 2027 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.