Hamilton Road
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Val Verde County. First named in the release with data as of February 1, 2015.
Val Verdecounty as printed
138kV
AEP TCC, AEP TCC/ETTutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Val Verde, TX: ERCOT queue, 3 active of 5. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Ganso to Hamilton Road: Rebuild 138 kV line Rebuild 138 kV line from Ganso to Hamilton Road ERCOT project 55626 · utility no. 3824 · RPG 22RPG044 |
AEP TCC Tier 3 |
Planned Future tab |
138 | Sep 2028 | Maverick to Hamilton Road Maverick / Val Verde County |
Maverick, Hamilton Road |
| Hamilton Road to Maxwell: Rebuild 138 kV Line Rebuild the Hamilton Road to Maxwell 138 kV line ERCOT project 61396 · utility no. TA2019800 · RPG 20RPG022 |
AEP TCC Tier 3 |
Planned Current-year planned tab |
138 | Nov 2026 | Hamilton Road to Maxwell Val Verde County |
Hamilton Road, Maxwell |
| Hamilton Road: Construct New 138 kV Terminal Interconnect Tierra Seca BESS to the Hamilton Road 138 kV station ERCOT project 76274 · utility no. TP2023133 |
AEP TCC/ETT Tier 4 |
In-Service Completed tab |
138 | Oct 2025 actual 2025-10 |
Hamilton Road Val Verde County |
Hamilton Road |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 55626 | Projected in-service date | Feb 2028 → Sep 2028 |
| February 1, 2026 | 61396 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 76274 | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 76274 | Status as reported | Under Construction → In-Service |
| October 1, 2025 | 76274 | Projected in-service date | May 2025 → Oct 2025 |
| June 1, 2025 | 76274 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 76274 | Status as reported | Planned → Under Construction |
| June 1, 2024 | 55626 | Projected in-service date | Dec 2026 → Feb 2028 |
| June 1, 2024 | 61396 | Projected in-service date | Nov 2024 → Nov 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.