Westside
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Nueces County. First named in the release with data as of February 1, 2015.
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Nueces, TX: ERCOT queue, 13 active of 13. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| McKenzie to Westside: Reconductor 138 kV Line Reconductor the McKenzie to Westside 138 kV line ERCOT project 86882 · utility no. TP2024025 |
AEP TCC/ETT Tier 4 |
Planned Current-year planned tab |
138 | Nov 2026 | McKenzie Road to Westside Nueces County |
McKenzie Road, Westside |
| Oso Creek to Westside: Construct New 138 kV Line Construct a new 138 kV single circuit line from Oso Creek to Westside ERCOT project 98569 · utility no. TP2025225 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Jun 2029 | Oso Creek to Westside Nueces County |
Oso Creek, Westside |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 98569 | Projected in-service date | May 2029 → Jun 2029 |
| February 1, 2026 | 86882 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 98569 | Projected in-service date | Dec 2027 → May 2029 |
| October 1, 2025 | 98569 | First listed | on the Future tab |
| October 1, 2024 | 86882 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.