Farias
Named in 2 listed projects in ERCOT’s transmission project tracking workbook. First named in the release with data as of July 13, 2026.
Described as new. The quoted wording calls this substation new. “new Farias 345-kV substation” — project 110443 description, as the utility reported it
Also printed as: FARIAS
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Nueces, TX: ERCOT queue, 13 active of 13. Same county, not the same substation.
Location
27.8323, -97.6691 · Nueces County, TX · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±500 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the green 345-kV substation circle labelled Nueces POI on ERCOT Figure 4.4 (Option 3, the option ERCOT staff recommended to its Board). Farias = ERCOT's 'Nueces Load POI' (identity: TPIT 110443 and 112229 carry RPG 25RPG016 and the same scope wording, with 'Farias' in place of 'Nueces Load POI'). Read off ERCOT Independent Review Figure 4.4 'Map of Option 3' (p.13 of the report, PDF p.27; dark basemap) at 90 dpi, anchored on OSM Lon Hill Substation (way 174682093, 27.84382,-97.61559) and STEC Calallen Substation (way 174682118, 27.84923,-97.64623), isotropic scale ~0.00026 deg lon/px. The point is 0.19 km from OSM 345/138 kV line way 174682105 (the line west of Lon Hill), consistent with 'cutting in on the existing Reforzar to Lon Hill 345-kV line'. +/- ~500 m (two-point fit).
Note: TPIT lists 110443 as Conceptual and 112229 'Adds Farias load serving substation' as Planned; ERCOT board materials (Apr 2026) and earlier EIR updates disagree on cost and ISD (not location).
County: the Census county at this point.
Sources: ERCOT Independent Review of STEC Nueces Green Ammonia Load Interconnection Project (25RPG016), Board item 5.2 (2026-04-13), PDF p.15 · ERCOT TPIT (release 39, 2026-10-01), sheet FutureTPIT100126NoCost rows 1386-1387 · OpenStreetMap: Lon Hill, Calallen substations; 345 kV lines near Calallen (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| STEC Nueces Green Ammonia Load Interconnection Project -Construct a new Farias 345-kV substation cutting in on the existing Reforzar to Lon Hill 345-kV transmission line -Loop in the new Farias onto the existing Lon Hill to Grissom 345-kV transmission line using single-circuit structures, with normal and emergency ratings of at least 1059 MVA and 1195 MVA, respectively, which will require a new right of way (ROW), approximately 5.9 miles; -Construct a… ERCOT project 110443 · RPG 25RPG016 |
STEC Tier 1 |
Conceptual Future tab |
345 | May 2031 | No terminals printed | Farias, Reforzar, Lon Hill, Grissom, Chalcedony, Nueces, Bunsen |
| Adds Farias load serving substation ERCOT project 112229 · RPG 25RPG016 |
STEC Tier 1 |
Planned Future tab |
345 | May 2031 | FARIAS | FARIAS |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 112229 | First listed | on the Future tab |
| July 13, 2026 | 110443 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.