Pradera
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2024.
Described as new. The quoted wording calls this substation new. “New 345kV Pradera (PRD) substation” — project 78468A description, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Location
Brazoria County, TX
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: Both adjacent stations on the loop (Seabreeze, Savannah) are unlocated, so the corridor is bounded by the full Dow - Oasis line.
Sources: ERCOT TPIT, projects 78468A, 78468B (release 39, 2026-10-01) · OpenStreetMap: Dow and Oasis substations (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102) New 345kV Pradera (PRD) substation for generator interconnection to Austin Bayou Solar (25INR0102). Loop Ckt.27 into Pradera substation to create new Ckt.27 Seabreeze to Pradera to Savannah. ERCOT project 78468A |
CNP Tier 4 |
Planned Future tab |
345 | Jan 2028 | Pradera to Savannah/Seabreeze Brazoria County |
Pradera, Savannah, Seabreeze |
| Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102) Install generator lead from Pradera (PRD) substation to AUSTIN (ABY) customer substation (25INR0102). ERCOT project 78468B |
CNP Tier 4 |
Planned Future tab |
345 | Jan 2028 | Pradera to AUSTIN Brazoria County |
Pradera, AUSTIN |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 78468A | Projected in-service date | Sep 2027 → Jan 2028 |
| October 1, 2026 | 78468B | Projected in-service date | Sep 2027 → Jan 2028 |
| July 13, 2026 | 78468A | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 78468A | Projected in-service date | Dec 2026 → Sep 2027 |
| July 13, 2026 | 78468B | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 78468B | Projected in-service date | Dec 2026 → Sep 2027 |
| February 1, 2026 | 78468A | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 78468B | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 78468A | Projected in-service date | Jan 2027 → Dec 2026 |
| October 1, 2025 | 78468B | Projected in-service date | Jan 2027 → Dec 2026 |
| June 1, 2025 | 78468A | Projected in-service date | Dec 2026 → Jan 2027 |
| June 1, 2025 | 78468B | Projected in-service date | Dec 2026 → Jan 2027 |
| February 1, 2025 | 78468A | First listed | on the Future tab |
| February 1, 2025 | 78468B | First listed | on the Future tab |
| June 1, 2024 | 78468A | No longer listed | future |
| June 1, 2024 | 78468B | No longer listed | future |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.