Substation Scout

Pradera

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2024.

Brazoriacounty as printed
345kV
CNPutility
2projects listed

Described as new. The quoted wording calls this substation new. “New 345kV Pradera (PRD) substation” — project 78468A description, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.

Location

Brazoria County, TX

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

Note: Both adjacent stations on the loop (Seabreeze, Savannah) are unlocated, so the corridor is bounded by the full Dow - Oasis line.

Sources: ERCOT TPIT, projects 78468A, 78468B (release 39, 2026-10-01) · OpenStreetMap: Dow and Oasis substations (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102)
New 345kV Pradera (PRD) substation for generator interconnection to Austin Bayou Solar (25INR0102). Loop Ckt.27 into Pradera substation to create new Ckt.27 Seabreeze to Pradera to Savannah.
ERCOT project 78468A
CNP
Tier 4
Planned
Future tab
345 Jan 2028 Pradera to Savannah/Seabreeze
Brazoria County
Pradera, Savannah, Seabreeze
Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102)
Install generator lead from Pradera (PRD) substation to AUSTIN (ABY) customer substation (25INR0102).
ERCOT project 78468B
CNP
Tier 4
Planned
Future tab
345 Jan 2028 Pradera to AUSTIN
Brazoria County
Pradera, AUSTIN

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202678468AProjected in-service dateSep 2027 → Jan 2028
October 1, 202678468BProjected in-service dateSep 2027 → Jan 2028
July 13, 202678468AMoved between tabsCurrent-year planned → Future
July 13, 202678468AProjected in-service dateDec 2026 → Sep 2027
July 13, 202678468BMoved between tabsCurrent-year planned → Future
July 13, 202678468BProjected in-service dateDec 2026 → Sep 2027
February 1, 202678468AMoved between tabsFuture → Current-year planned
February 1, 202678468BMoved between tabsFuture → Current-year planned
October 1, 202578468AProjected in-service dateJan 2027 → Dec 2026
October 1, 202578468BProjected in-service dateJan 2027 → Dec 2026
June 1, 202578468AProjected in-service dateDec 2026 → Jan 2027
June 1, 202578468BProjected in-service dateDec 2026 → Jan 2027
February 1, 202578468AFirst listedon the Future tab
February 1, 202578468BFirst listedon the Future tab
June 1, 202478468ANo longer listedfuture
June 1, 202478468BNo longer listedfuture

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.