Substation Scout

Buccaneer

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in McCulloch County. First named in the release with data as of October 1, 2024.

McCullochcounty as printed
69kV
AEP TNCutility
1projects listed

Described as new. The quoted wording calls this substation new. “Buccaneer: Construct New 69 kV Station” — project 86796 title, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in McCulloch, TX: ERCOT queue, 3 active of 3. Same county, not the same substation.

Location

McCulloch County, TX

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. TPIT places the station on the Eden to North Brady 69 kV line; TPIT narrows it to the section between Melvin and North Brady, both in OpenStreetMap: AEP Melvin Substation (way 493666739, 31.1963,-99.584) and AEP North Brady Substation (way 493666737, 31.1555,-99.3362), ~24 km apart. The station is somewhere on that line; no public document found that draws or describes its site.

Sources: ERCOT TPIT, project(s) 86796 (release 39, 2026-10-01) · OpenStreetMap: Melvin Substation (way 493666739), North Brady Substation (way 493666737) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Buccaneer: Construct New 69 kV Station
Interconnect the Oncor Regency station to the new Buccaneer 69 kV station on the Eden to North Brady 69 kV line between Melvin and North Brady
ERCOT project 86796
AEP TNC
Tier 4
Planned
Future tab
69 Jan 2027 Buccaneer
McCulloch County
Buccaneer

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202686796Moved between tabsCurrent-year planned → Future
October 1, 202686796Projected in-service dateDec 2026 → Jan 2027
February 1, 202686796Moved between tabsFuture → Current-year planned
October 1, 202586796Projected in-service dateJul 2026 → Dec 2026
October 1, 202486796First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.