Fisher Road Switch
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Wichita County. First named in the release with data as of February 1, 2015.
Wichitacounty as printed
138, 345kV
ONCORutility
3projects listed
Also printed as: Fisher Road
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Wichita, TX: ERCOT queue, 12 active of 15. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Lomond_Switch_345kV Establish Lomond 345 kV Switch ERCOT project 105012 |
ONCOR Tier 3 |
Planned Future tab |
345 | May 2028 | Bowman Switch to Fisher Road Switch Wichita County |
Bowman Switch, Fisher Road Switch |
| Fisher Road - Wichita Falls 138 kV Line Upgrade ERCOT project 110815 · utility no. R191 |
ONCOR Tier 4 |
Conceptual Future tab |
138 | Aug 2030 | Fisher Road Switch to Wichita Falls Wichita County |
Fisher Road Switch, Wichita Falls |
| Establish Fallstown Switch – Pleasant Valley/Fisher Road 138 kV Double-Circuit Line and Fallstown Switch – Ceramic/Wichita Falls PPG 138 kV Double-Circuit Line ERCOT project 87413 · utility no. R4024 |
ONCOR Tier 4 |
Planned Current-year planned tab |
138 | Dec 2026 | Fallstown Switch to Pleasant Valley/Fisher Road Wichita County |
Fallstown Switch, Pleasant Valley, Fisher Road |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 87413 | Moved between tabs | Future → Current-year planned |
| October 1, 2026 | 87413 | Projected in-service date | Feb 2027 → Dec 2026 |
| July 13, 2026 | 110815 | First listed | on the Future tab |
| June 1, 2026 | 105012 | First listed | on the Future tab |
| February 1, 2026 | 87413 | Projected in-service date | May 2026 → Feb 2027 |
| February 1, 2025 | 87413 | Projected in-service date | Dec 2026 → May 2026 |
| October 1, 2024 | 87413 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.