Limestone
Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Leon County. First named in the release with data as of June 1, 2024.
Leoncounty as printed
345kV
CNP, CTTutility
5projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Leon, TX: ERCOT queue, 13 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Add new Iron Horse station for 25INR0230 ERCOT project 100537 |
CTT Tier 4 |
Planned Future tab |
345 | Oct 2027 | Limestone to Gibbons Creek Leon County |
Limestone, Gibbons Creek |
| Tap 2nd Limestone - Gibbons Creek into Yellow Wolf ERCOT project 110350 |
CTT Tier 4 |
Conceptual Future tab |
345 | Dec 2028 | Limestone to Gibbons Creek Leon County |
Limestone, Gibbons Creek |
| Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150) Loop new Newby (NBY) 345kV CEHE Substation into Ckt.74 to create new Ckt.74 Jewett to Newby to Limestone. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.74 Newby to Limestone. ERCOT project 111258A |
CNP Tier 4 |
Planned Future tab |
345 | Oct 2028 | Newby to Jewett / Limestone Freestone / Leon County |
Newby, Jewett, Limestone |
| Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150) Loop new Newby (NBY) 345kV CEHE Substation into Ckt.98 to create new Ckt.98 Limestone to Newby to Jewett. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.98 Newby to Limestone. ERCOT project 111258B |
CNP Tier 4 |
Planned Future tab |
345 | Oct 2028 | Newby to Limestone / Jewett Freestone / Leon County |
Newby, Limestone, Jewett |
| Add new Yellow Wolf station for 21INR0428 ERCOT project 79990 |
CTT Tier 4 |
Under Construction Completed tab |
345 | Apr 2025 actual 2025-04 |
Limestone to Gibbons Creek Leon County |
Limestone, Gibbons Creek |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 111258A | First listed | on the Future tab |
| October 1, 2026 | 111258B | First listed | on the Future tab |
| July 13, 2026 | 110350 | First listed | on the Future tab |
| October 1, 2025 | 100537 | First listed | on the Future tab |
| June 1, 2025 | 79990 | Moved between tabs | Future → Completed |
| February 1, 2025 | 79990 | Projected in-service date | Jun 2025 → Apr 2025 |
| October 1, 2024 | 79990 | Projected in-service date | Feb 2026 → Jun 2025 |
| June 1, 2024 | 79990 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner