Substation Scout

Bellaire

Named in 15 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.

Harriscounty as printed
138, 345kV
CNPutility
15projects listed

A HIFLD substation record has the same name and county: BELLAIRE (HARRIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Bellaire 35kV Distribution Upgrades with 3rd Transformer
Reconfigure 35kV Bellaire distribution facilities. Install new 35kV Bellaire distribution TR7 with Ckt.24B service.
ERCOT project 103003A
CNP
Tier 4
Planned
Current-year planned tab
138 Nov 2026 Bellaire
Harris County
Bellaire
Bellaire 35kV Distribution Upgrades with 3rd Transformer
Reconfigure 35kV Bellaire distribution facilities. Reconfigure Bellaire 35kV distribution transformer TR6 to receive Ckt.35E service. Reconductor portions of Ckt.35E.
ERCOT project 103003B
CNP
Tier 4
Planned
Current-year planned tab
138 Nov 2026 Bellaire
Harris County
Bellaire
Bellaire to Ulrich Hardening
Rebuild/reconductor portions of Ckt.35 Bellaire to Ulrich as a Hardening upgrade.
ERCOT project 103423
CNP
Tier 4
Planned
Future tab
138 May 2027 Bellaire to Ulrich
Harris County
Bellaire, Ulrich
Rebuild/reconductor Ckt.94C Metals Switchrack to METALS as a Hardening upgrade
Rebuild/reconductor portions of Ckt.35 Bellaire to Ulrich as a Hardening upgrade.
ERCOT project 103427
CNP
Tier 4
Planned
Current-year planned tab
138 Dec 2026 Bellaire to Ulrich
Harris County
Bellaire, Ulrich
High Voltage Mitigation - WA Parish Area
Install (2) 40 MVAr shunt reactors on the tertiary of Bellaire Auto A1
ERCOT project 104744A
CNP
Tier 4
Planned
Future tab
345 Dec 2027 Bellaire
Harris County
Bellaire
High Voltage Mitigation - WA Parish Area
Install (2) 40 MVAr shunt reactors on the tertiary of Bellaire Auto A2
ERCOT project 104744B
CNP
Tier 4
Planned
Future tab
345 Dec 2027 Bellaire
Harris County
Bellaire
Removal of 140MVAr SVC and facilities from Bellaire and Crosby 138kV substations.
Remove the 140MVAr SVC and facilities from Bellaire 138kV substation
ERCOT project 112585A
CNP
Tier 4
Planned
Future tab
138 May 2027 Bellaire
Harris County
Bellaire
BP24 Sub Upgrades
Upgrade Bellaire Auto A5 CTs to increase thermal limits
ERCOT project 73371B
CNP
Tier 4
In-Service
Completed tab
138 Jun 2026
actual 2026-06
Bellaire
Harris County
Bellaire
Britmoore to Bellaire Ckt.24B Upgrades
Upgrade portions of Ckt.05E Bellaire to Sharpstown to Hillcroft to increase thermal limits.
ERCOT project 78485C · RPG 23RPG025
CNP
Tier 3
Planned
Current-year planned tab
138 Dec 2026 Bellaire to Hillcroft
Harris County
Bellaire, Hillcroft
Britmoore to Bellaire Ckt.24B Upgrades
Upgrade Ckt.24B Bellaire to Ulrich to Hillcroft to increase thermal limits.
ERCOT project 78485D · RPG 23RPG025
CNP
Tier 3
Planned
Current-year planned tab
138 Dec 2026 Bellaire to Hillcroft
Harris County
Bellaire, Hillcroft
Upgrade to increase thermal limits as part of FRM upgrades
Upgrade Bellaire to WAP Ckt.50A to increase thermal limits as part of FRM upgrades
ERCOT project 87479D
CNP
Tier 4
Conceptual
Current-year planned tab
345 Jul 2025 Bellaire to WAP
Harris / Fort Bend County
Bellaire, WAP
Upgrade to increase thermal limits as part of FRM upgrades
Upgrade Bellaire to Jeanetta Ckt.64B to increase thermal limits as part of FRM upgrades
ERCOT project 87479F
CNP
Tier 4
Conceptual
Current-year planned tab
345 Jul 2025 Bellaire to Jeanetta
Harris County
Bellaire, Jeanetta
Facility Ratings Methodology (FRM) Upgrades
Upgrade Bellaire to WAP Ckt.50A to increase thermal limits as part of FRM upgrades
ERCOT project 90232D
CNP
Tier 4
Planned
Current-year planned tab
345 Aug 2026 Bellaire to WA Parish
Harris County
Bellaire, WA Parish
Facility Ratings Methodology (FRM) Upgrades
Upgrade Bellaire to Jeanetta Ckt.64B to increase thermal limits as part of FRM upgrades
ERCOT project 90232F
CNP
Tier 4
Planned
Current-year planned tab
345 Aug 2026 Bellaire to Jeanetta
Harris County
Bellaire, Jeanetta
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.98A Bellaire to Smithers to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453J
CNP
Tier 4
Planned
Current-year planned tab
345 Dec 2026 Bellaire to Smithers
Harris / Fort Bend County
Bellaire, Smithers

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026112585AFirst listedon the Future tab
October 1, 202690232DProjected in-service dateJul 2026 → Aug 2026
October 1, 202690232FProjected in-service dateJul 2026 → Aug 2026
July 13, 2026103427Moved between tabsFuture → Current-year planned
July 13, 2026103427Projected in-service dateDec 2028 → Dec 2026
July 13, 202687479DStatus as reportedPlanned → Conceptual
July 13, 202687479FStatus as reportedPlanned → Conceptual
July 13, 202690232DProjected in-service dateJun 2026 → Jul 2026
July 13, 202690232FProjected in-service dateJun 2026 → Jul 2026
July 13, 2026103003AProjected in-service dateOct 2026 → Nov 2026
July 13, 2026103003BProjected in-service dateOct 2026 → Nov 2026
July 13, 2026104744AProjected in-service dateOct 2027 → Dec 2027
July 13, 2026104744BProjected in-service dateOct 2027 → Dec 2027
July 13, 202673371BMoved between tabsCurrent-year planned → Completed
July 13, 202673371BStatus as reportedPlanned → In-Service
July 13, 202673371BProjected in-service dateMar 2026 → Jun 2026
July 13, 202690232DProjected in-service dateMar 2026 → Jun 2026
July 13, 202690232FProjected in-service dateMar 2026 → Jun 2026
June 1, 2026103003AFirst listedon the Current-year planned tab
June 1, 2026103003BFirst listedon the Current-year planned tab
June 1, 2026103423First listedon the Future tab
June 1, 2026103427First listedon the Future tab
June 1, 2026104744AFirst listedon the Future tab
June 1, 2026104744BFirst listedon the Future tab
June 1, 202673371BProjected in-service dateJan 2026 → Mar 2026
June 1, 202690232DProjected in-service dateJan 2026 → Mar 2026
June 1, 202690232FProjected in-service dateJan 2026 → Mar 2026
February 1, 202673371BProjected in-service dateNov 2025 → Jan 2026
February 1, 202678485CMoved between tabsFuture → Current-year planned
February 1, 202678485DMoved between tabsFuture → Current-year planned
February 1, 202690232DProjected in-service dateSep 2025 → Jan 2026
February 1, 202690232FProjected in-service dateSep 2025 → Jan 2026
February 1, 202699453JMoved between tabsFuture → Current-year planned
February 1, 202699453JProjected in-service dateMay 2026 → Dec 2026
October 1, 202573371BProjected in-service dateOct 2025 → Nov 2025
October 1, 202578485CProjected in-service dateMay 2026 → Dec 2026
October 1, 202578485DProjected in-service dateMay 2026 → Dec 2026
October 1, 202590232DProjected in-service dateJul 2025 → Sep 2025
October 1, 202590232FProjected in-service dateJul 2025 → Sep 2025
October 1, 202599453JFirst listedon the Future tab
June 1, 202573371BMoved between tabsFuture → Current-year planned
June 1, 202587479DMoved between tabsFuture → Current-year planned
June 1, 202587479FMoved between tabsFuture → Current-year planned
June 1, 202590232DMoved between tabsFuture → Current-year planned
June 1, 202590232FMoved between tabsFuture → Current-year planned
February 1, 202573371BProjected in-service dateOct 2024 → Oct 2025
February 1, 202578485DProjected in-service dateMay 2025 → May 2026
February 1, 202590232DFirst listedon the Future tab
February 1, 202590232FFirst listedon the Future tab
October 1, 202473371BMoved between tabsCompleted → Future
October 1, 202473371BProjected in-service dateMay 2024 → Oct 2024
October 1, 202487479DFirst listedon the Future tab
October 1, 202487479FFirst listedon the Future tab
June 1, 202473371BMoved between tabsFuture → Completed

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.