MORLEY
Named in 10 listed projects in ERCOT’s transmission project tracking workbook, in Wharton County. First named in the release with data as of June 1, 2026.
Whartoncounty as printed
345, 765kV
CNPutility
10projects listed
Also printed as: Morley
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Wharton, TX: ERCOT queue, 42 active of 44. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| This models CEHE's Portion of the 765 kV STEP project Install new Morley (MLY) 345kV CEHE substation in BAAH configuration. Loop Ckt.72H into Morley substation to create new Ckt.72 Hillje to Morley to Julia. ERCOT project 103797A · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
345 | Dec 2031 | MORLEY to HILLJE/JULIA Wharton County |
MORLEY, HILLJE, JULIA |
| This models CEHE's Portion of the 765 kV STEP project Install new Morley (MLY) 345kV CEHE substation in BAAH configuration. Loop Ckt.64E into Morley substation to create new Ckt.64 Hillje to Morley to Wolf. ERCOT project 103797B · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
345 | Dec 2031 | MORLEY to HILLJE/WOLF Wharton County |
MORLEY, HILLJE, WOLF |
| This models CEHE's Portion of the 765 kV STEP project Install new Morley (MLY) 765kV CEHE substation. Install 765/345kV Autotransformer A1 with connection to Morley 345kV substation. ERCOT project 103797C · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
765 | Dec 2031 | MORLEY Wharton County |
MORLEY |
| This models CEHE's Portion of the 765 kV STEP project Install new Morley (MLY) 765kV CEHE substation. Install 765/345kV Autotransformer A2 with connection to Morley 345kV substation. ERCOT project 103797D · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
765 | Dec 2031 | MORLEY Wharton County |
MORLEY |
| This models CEHE's Portion of the 765 kV STEP project Install new Morley (MLY) 765kV CEHE substation. Install 765/345kV Autotransformer A3 with connection to Morley 345kV substation. ERCOT project 103797E · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
765 | Dec 2031 | MORLEY to HILLJE/WOLF Wharton County |
MORLEY, HILLJE, WOLF |
| This models CEHE's Portion of the 765 kV STEP project Install new Morley (MLY) 345kV CEHE substation in BAAH configuration. Install 345kV Ckt.1 Hillje to Morley. Install 345kV Ckt.2 Hillje to Morley. ERCOT project 103797F · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
345 | Dec 2031 | MORLEY to HILLJE/JULIA Wharton County |
MORLEY, HILLJE, JULIA |
| This models CEHE's Portion of the 765 kV STEP project Install 765kV line from CEHE's Morley substation to AEP Blu Lacy substation. ERCOT project 103797G · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
765 | Dec 2031 | MORLEY to Blu Lacy Wharton / Nueces County |
MORLEY, Blu Lacy |
| This models CEHE's Portion of the 765 kV STEP project Install 765kV line from CEHE's Morley substation to Oncor's Martin Lake substation. ERCOT project 103797H · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
765 | May 2032 | MORLEY to Martin Lake Wharton / Rusk County |
MORLEY, Martin Lake |
| This models CEHE's Portion of the 765 kV STEP project Install new Morley (MLY) 765kV CEHE substation. Install and connect (1) 300 MVAr switchable bus reactors at Morley 765kV. ERCOT project 103797I · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
765 | Dec 2031 | MORLEY Wharton County |
MORLEY |
| Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (2) 300 MVAr switchable line reactors and 2-225MVAR bus reactors. Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (1) 300 MVAr switchable line reactors and 2-225MVAR bus reactors. ERCOT project 116019A |
CNP Tier 4 |
Planned Future tab |
765 | May 2032 | CEHE_NewSub to Morley Grimes / Wharton County |
Morley |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 116019A | First listed | on the Future tab |
| June 1, 2026 | 103797A | First listed | on the Future tab |
| June 1, 2026 | 103797B | First listed | on the Future tab |
| June 1, 2026 | 103797C | First listed | on the Future tab |
| June 1, 2026 | 103797D | First listed | on the Future tab |
| June 1, 2026 | 103797E | First listed | on the Future tab |
| June 1, 2026 | 103797F | First listed | on the Future tab |
| June 1, 2026 | 103797G | First listed | on the Future tab |
| June 1, 2026 | 103797H | First listed | on the Future tab |
| June 1, 2026 | 103797I | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.