Garden Villas
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Harris County, plus 1 on its Cancelled tab. First named in the release with data as of October 1, 2019.
A HIFLD substation record has the same name and county: GARDEN VILLAS (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| GENRAL to Garden Villas Rebuild Rebuild and Reconductor portion of Ckt.12B Bringhurst (GENRAL) to Garden Villas to prepare for future 138kV Conversion ERCOT project 68205 |
CNP Tier 4 |
In-Service Current-year planned tab |
69 | Dec 2026 actual 2025-09 |
GENRAL to Garden Villas Harris County |
GENRAL, Garden Villas |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196) Loop new CEHE 138kV substation Ashville (ASH) into Ckt.06F Garden Villas to Holmes to create new Ckt.06 Garden Villas to Ashville to Holmes ERCOT project 72029A |
CNP Tier 4 |
Conceptual Cancelled tab |
138 | Dec 2026 | Ashville to Garden Villas/ Holmes Harris County |
Ashville, Garden Villas, Holmes |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 72029A | Moved between tabs | Current-year planned → Cancelled |
| October 1, 2026 | 72029A | Status as reported | Planned → Conceptual |
| February 1, 2026 | 68205 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 68205 | Status as reported | Planned → In-Service |
| February 1, 2026 | 72029A | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 72029A | Projected in-service date | Apr 2026 → Dec 2026 |
| February 1, 2025 | 72029A | Projected in-service date | Feb 2025 → Apr 2026 |
| June 1, 2024 | 72029A | Projected in-service date | Oct 2024 → Feb 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.