Nippert
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Childress County. First named in the release with data as of June 1, 2026.
Described as new. The quoted wording calls this substation new. “Nippert: Construct New 138/69 kV Station” — project 104020 title, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Childress, TX: ERCOT queue, 5 active of 5. Same county, not the same substation.
Location
34.4077, -100.2231 · Childress County, TX · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the yellow-and-blue New/Convert Substation symbol labelled 'New Substation' just south of Childress West on ERCOT's 'Map of ERCOT Recommended Option' (Option 1A, 25RPG018 status update October 2025, p.21; light basemap with county and town names). Nippert = ERCOT's 'New Substation' (identity: TPIT 104020 carries RPG 25RPG018 and the same scope: on the Childress to Quanah 69-kV line and on the Paducah to West Childress 138-kV line). Read off the embedded map image (1347x741 px, ~40 m/px) with a least-squares affine fit on OSM substations West Childress (way 498377418), Childress (498377421), Henry (498377446), Childress 20th Street (498377452), Kirkland (498377425), Quanah (498377432) and Lake Pauline (231066354); residuals 0.07-0.23 km. The point is 0.10 km from OSM 138-kV line way 498377433, consistent with cutting into the West Childress to Paducah 138-kV line. +/- ~300 m.
County: the Census county at this point.
Sources: ERCOT Independent Review status update, AEP Childress Area Transmission Improvement Project (25RPG018), RPG October 2025 (2025-10-24), p.19-22 · ERCOT System Planning monthly status report to ROS, November 2025 (2026-01-06), p. 25RPG018: review completed November 5, endorsement letter issued · ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 104020 (release 2026-10) · OpenStreetMap: Childress-area substations and 138 kV lines (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Nippert: Construct New 138/69 kV Station Construct new Nippert 138/69 kV station on the Childress to Quanah 69 kV line between Childress and Goodlet and on the Paducah to West Childress 138 kV line ERCOT project 104020 · utility no. TP2025249 · RPG 25RPG018 |
AEP TNC Tier 2 |
Planned Future tab |
138 | Nov 2030 | Nippert Childress County |
Nippert |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 104020 | Projected in-service date | Nov 2031 → Nov 2030 |
| June 1, 2026 | 104020 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.