Vanderbilt
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Victoria County. First named in the release with data as of June 1, 2024.
Victoriacounty as printed
69, 138kV
STECutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Victoria, TX: ERCOT queue, 17 active of 22. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Rebuild Vanderbilt -Pt Lavaca Rebuild Vanderbilt - Placedo - Kamey -Pt Lavaca 69kV to 795 ACSR ERCOT project 75989 |
STEC Tier 4 |
Conceptual Future tab |
69 | May 2030 | Vanderbilt to Port Lavaca Victoria / Calhoun County |
Vanderbilt, Port Lavaca |
| New Furhman Substation Adds New Furhman switching station on Rayburn - Vanderbilt line for generator interconnect ERCOT project 82829 |
STEC Tier 4 |
In-Service Completed tab |
138 | Jul 2025 actual 2025-08 |
Rayburn to Vanderbilt Victoria County |
Rayburn, Vanderbilt |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 82829 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 82829 | Status as reported | Planned → In-Service |
| February 1, 2026 | 75989 | Projected in-service date | May 2027 → May 2030 |
| October 1, 2025 | 75989 | Projected in-service date | May 2026 → May 2027 |
| October 1, 2025 | 82829 | Projected in-service date | Apr 2025 → Jul 2025 |
| June 1, 2025 | 82829 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 75989 | Status as reported | Planned → Conceptual |
| February 1, 2025 | 82829 | Projected in-service date | Feb 2025 → Apr 2025 |
| October 1, 2024 | 75989 | First listed | on the Future tab |
| June 1, 2024 | 82829 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner