Solstice
Named in 9 listed projects in ERCOT’s transmission project tracking workbook, in Pecos County. First named in the release with data as of February 1, 2015.
Described as new. The quoted wording calls this substation new. “Solstice: Construct New 765 kV Station” — project 111276 title, as the utility reported it
A HIFLD substation record has the same name and county: SOLSTICE (PECOS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Pecos, TX: ERCOT queue, 58 active of 63. Same county, not the same substation.
Location
30.9483, -103.3617 · Pecos County, TX · view on a map
OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. Accurate to about ±400 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: OSM way 500535889 'Solstice Substation' (operator American Electric Power, 345/138 kV), centre 30.94832,-103.36171. Corroborated by PUCT Docket 59336 order finding 13: 'the existing AEP Texas Solstice 345-kV station, which is located approximately 28 miles west of the City of Fort Stockton along Interstate 10 in Pecos County, and which will be expanded for 765-kV operation' (the OSM yard is ~29 miles west of Fort Stockton, beside I-10). HIFLD also carries SOLSTICE in Pecos County. The point is the existing yard; the 765 kV expansion may sit beside it, so +/- ~400 m.
Note: TPIT calls this a 'new Solstice 765 kV station', but the PUCT order treats it as an expansion of the existing Solstice 345-kV station for 765-kV operation (estimated ~$350 million). Solstice has been in service at 345/138 kV for years (TPIT first lists it in 2015), so this is better read as an expansion (new 765 kV voltage level) at an existing station than as a new station.
Sources: PUCT Docket 59336, Order: Howard - Solstice 765-kV transmission line (AEP Texas and CPS Energy) (2026-09-18), Order pp.5-6 · AEP Texas, Howard - Solstice Transmission Line Project page (2026) · ERCOT TPIT, projects 111276, 98595, 102955, 91939, 91941, 91853, 98561, 102788, 78046 (release 39, 2026-10-01) · OpenStreetMap: Solstice Substation (way 500535889) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Overland_Substation_Addition Construct a new 345-kV Overland substation and cut-in the double circuit Bakersfield Substation to Solstice Substation 345-kV transmission line (T718 and T683) to provide two (2) Points of Interconnection ERCOT project 102788 |
LCRATSC Tier 4 |
Planned Future tab |
345 | May 2027 | No terminals printed Pecos County |
Overland, Bakersfield, Solstice |
| Solstice to Sand Lake: Construct New 765 kV Single Circuit Line Construct a new 765 kV single circuit line from Solstice to Sand Lake ERCOT project 102955 · utility no. TP2025846 · RPG 25RPG022 · RTP temp |
AEP TNC Tier 1 |
Planned Future tab |
765 | Dec 2030 | Solstice to Sand Lake Pecos / Reeves County |
Solstice, Sand Lake |
| Solstice: Construct New 765 kV Station Construct the new Solstice 765 kV station and Install two 765/345 kV autotransformers and two 765 kV shunt reactors ERCOT project 111276 · utility no. TP2024146 · RPG H.B. 5066 |
AEP TNC Tier 1 |
Planned Future tab |
765 | Oct 2030 | Solstice Pecos County |
Solstice |
| Blue Goose (fka Toyah Creek) 345 kV Switch Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013) ERCOT project 78046 · utility no. R8715 · RPG 23RPG013 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2027 | Sand Lake to Solstice Ward / Pecos County |
Sand Lake, Solstice |
| Fort Stockton Plant to Solstice: Rebuild 138 kV Line Rebuild the Fort Stockton Plant to Solstice 138 kV line and retire the PST at Solstice ERCOT project 91853 · utility no. TP2025145 · RPG H.B. 5066 |
AEP TNC Tier 3 |
Planned Future tab |
138 | Nov 2028 | Fort Stockton Plant to Solstice Pecos County |
Fort Stockton Plant, Solstice |
| Solstice to Bottlebrush: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Solstice to Bottlebrush ERCOT project 91939 · utility no. TP2024076 · RPG H.B. 5066 |
AEP TNC/TNMP Tier 1 |
Planned Future tab |
345 | Nov 2029 | Solstice to Bottlebrush Pecos / Reeves County |
Solstice, Bottlebrush |
| Solstice to Faulkner: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Solstice to Faulkner ERCOT project 91941 · utility no. TP2024165 · RPG H.B. 5066 |
AEP TNC/TNMP Tier 1 |
Planned Future tab |
345 | Oct 2029 | Solstice to Faulkner Pecos / Reeves County |
Solstice, Faulkner |
| Solstice to Hayter Tap: Rebuild 138 kV Line Double Circuit Rebuild the Solstice to Hayter Tap 138 kV line as a double circuit ERCOT project 98561 · RPG H.B. 5066 |
AEP TNC Tier 2 |
Planned Future tab |
138 | Nov 2028 | Solstice to Hayter Tap Pecos County |
Solstice, Hayter Tap |
| Solstice to Howard: Construct New 765 kV Single Circuit Line Construct a new 765 kV single circuit line from Solstice to Howard ERCOT project 98595 · RPG H.B. 5066 |
AEP TNC Tier 1 |
Planned Future tab |
765 | Oct 2030 | Solstice to Howard Pecos / Bexar County |
Solstice, Howard |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 111276 | First listed | on the Future tab |
| October 1, 2026 | 78046 | Projected in-service date | Dec 2027 → May 2027 |
| October 1, 2026 | 91853 | Projected in-service date | Nov 2029 → Nov 2028 |
| October 1, 2026 | 91939 | Projected in-service date | Dec 2030 → Nov 2029 |
| October 1, 2026 | 98561 | Projected in-service date | May 2028 → Nov 2028 |
| October 1, 2026 | 98595 | Projected in-service date | Jan 2029 → Oct 2030 |
| June 1, 2026 | 102955 | First listed | on the Future tab |
| June 1, 2026 | 78046 | Projected in-service date | May 2027 → Dec 2027 |
| June 1, 2026 | 98595 | Projected in-service date | Dec 2030 → Jan 2029 |
| February 1, 2026 | 102788 | First listed | on the Future tab |
| February 1, 2026 | 78046 | Projected in-service date | Dec 2026 → May 2027 |
| February 1, 2026 | 91853 | Projected in-service date | Dec 2030 → Nov 2029 |
| February 1, 2026 | 91941 | Projected in-service date | Dec 2030 → Oct 2029 |
| February 1, 2026 | 98561 | Projected in-service date | Dec 2030 → May 2028 |
| October 1, 2025 | 98561 | First listed | on the Future tab |
| October 1, 2025 | 98595 | First listed | on the Future tab |
| June 1, 2025 | 91853 | First listed | on the Future tab |
| June 1, 2025 | 91939 | First listed | on the Future tab |
| June 1, 2025 | 91941 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.