Named in 9 listed projects in ERCOT’s transmission project tracking workbook, in Pecos County. First named in the release with data as of February 1, 2015.

Pecoscounty as printed
138, 345, 765kV
AEP TNC, AEP TNC/TNMP, LCRATSC, ONCORutility
9projects listed

Described as new. The quoted wording calls this substation new. “Solstice: Construct New 765 kV Station” — project 111276 title, as the utility reported it

A HIFLD substation record has the same name and county: SOLSTICE (PECOS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Pecos, TX: ERCOT queue, 58 active of 63. Same county, not the same substation.

Location

30.9483, -103.3617 · Pecos County, TX · view on a map

OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. Accurate to about ±400 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: OSM way 500535889 'Solstice Substation' (operator American Electric Power, 345/138 kV), centre 30.94832,-103.36171. Corroborated by PUCT Docket 59336 order finding 13: 'the existing AEP Texas Solstice 345-kV station, which is located approximately 28 miles west of the City of Fort Stockton along Interstate 10 in Pecos County, and which will be expanded for 765-kV operation' (the OSM yard is ~29 miles west of Fort Stockton, beside I-10). HIFLD also carries SOLSTICE in Pecos County. The point is the existing yard; the 765 kV expansion may sit beside it, so +/- ~400 m.

Note: TPIT calls this a 'new Solstice 765 kV station', but the PUCT order treats it as an expansion of the existing Solstice 345-kV station for 765-kV operation (estimated ~$350 million). Solstice has been in service at 345/138 kV for years (TPIT first lists it in 2015), so this is better read as an expansion (new 765 kV voltage level) at an existing station than as a new station.

Sources: PUCT Docket 59336, Order: Howard - Solstice 765-kV transmission line (AEP Texas and CPS Energy) (2026-09-18), Order pp.5-6 · AEP Texas, Howard - Solstice Transmission Line Project page (2026) · ERCOT TPIT, projects 111276, 98595, 102955, 91939, 91941, 91853, 98561, 102788, 78046 (release 39, 2026-10-01) · OpenStreetMap: Solstice Substation (way 500535889) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Overland_Substation_Addition
Construct a new 345-kV Overland substation and cut-in the double circuit Bakersfield Substation to Solstice Substation 345-kV transmission line (T718 and T683) to provide two (2) Points of Interconnection
ERCOT project 102788
LCRATSC
Tier 4
Planned
Future tab
345 May 2027 No terminals printed
Pecos County
Overland, Bakersfield, Solstice
Solstice to Sand Lake: Construct New 765 kV Single Circuit Line
Construct a new 765 kV single circuit line from Solstice to Sand Lake
ERCOT project 102955 · utility no. TP2025846 · RPG 25RPG022 · RTP temp
AEP TNC
Tier 1
Planned
Future tab
765 Dec 2030 Solstice to Sand Lake
Pecos / Reeves County
Solstice, Sand Lake
Solstice: Construct New 765 kV Station
Construct the new Solstice 765 kV station and Install two 765/345 kV autotransformers and two 765 kV shunt reactors
ERCOT project 111276 · utility no. TP2024146 · RPG H.B. 5066
AEP TNC
Tier 1
Planned
Future tab
765 Oct 2030 Solstice
Pecos County
Solstice
Blue Goose (fka Toyah Creek) 345 kV Switch
Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013)
ERCOT project 78046 · utility no. R8715 · RPG 23RPG013
ONCOR
Tier 1
Planned
Future tab
345 May 2027 Sand Lake to Solstice
Ward / Pecos County
Sand Lake, Solstice
Fort Stockton Plant to Solstice: Rebuild 138 kV Line
Rebuild the Fort Stockton Plant to Solstice 138 kV line and retire the PST at Solstice
ERCOT project 91853 · utility no. TP2025145 · RPG H.B. 5066
AEP TNC
Tier 3
Planned
Future tab
138 Nov 2028 Fort Stockton Plant to Solstice
Pecos County
Fort Stockton Plant, Solstice
Solstice to Bottlebrush: Construct New 345 kV Double Circuit Line
Construct a new 345 kV double circuit line from Solstice to Bottlebrush
ERCOT project 91939 · utility no. TP2024076 · RPG H.B. 5066
AEP TNC/TNMP
Tier 1
Planned
Future tab
345 Nov 2029 Solstice to Bottlebrush
Pecos / Reeves County
Solstice, Bottlebrush
Solstice to Faulkner: Construct New 345 kV Double Circuit Line
Construct a new 345 kV double circuit line from Solstice to Faulkner
ERCOT project 91941 · utility no. TP2024165 · RPG H.B. 5066
AEP TNC/TNMP
Tier 1
Planned
Future tab
345 Oct 2029 Solstice to Faulkner
Pecos / Reeves County
Solstice, Faulkner
Solstice to Hayter Tap: Rebuild 138 kV Line Double Circuit
Rebuild the Solstice to Hayter Tap 138 kV line as a double circuit
ERCOT project 98561 · RPG H.B. 5066
AEP TNC
Tier 2
Planned
Future tab
138 Nov 2028 Solstice to Hayter Tap
Pecos County
Solstice, Hayter Tap
Solstice to Howard: Construct New 765 kV Single Circuit Line
Construct a new 765 kV single circuit line from Solstice to Howard
ERCOT project 98595 · RPG H.B. 5066
AEP TNC
Tier 1
Planned
Future tab
765 Oct 2030 Solstice to Howard
Pecos / Bexar County
Solstice, Howard

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026111276First listedon the Future tab
October 1, 202678046Projected in-service dateDec 2027 → May 2027
October 1, 202691853Projected in-service dateNov 2029 → Nov 2028
October 1, 202691939Projected in-service dateDec 2030 → Nov 2029
October 1, 202698561Projected in-service dateMay 2028 → Nov 2028
October 1, 202698595Projected in-service dateJan 2029 → Oct 2030
June 1, 2026102955First listedon the Future tab
June 1, 202678046Projected in-service dateMay 2027 → Dec 2027
June 1, 202698595Projected in-service dateDec 2030 → Jan 2029
February 1, 2026102788First listedon the Future tab
February 1, 202678046Projected in-service dateDec 2026 → May 2027
February 1, 202691853Projected in-service dateDec 2030 → Nov 2029
February 1, 202691941Projected in-service dateDec 2030 → Oct 2029
February 1, 202698561Projected in-service dateDec 2030 → May 2028
October 1, 202598561First listedon the Future tab
October 1, 202598595First listedon the Future tab
June 1, 202591853First listedon the Future tab
June 1, 202591939First listedon the Future tab
June 1, 202591941First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.