Zoisite
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Matagorda County, plus 1 on its Cancelled tab. First named in the release with data as of October 1, 2024.
Described as new. The quoted wording calls this substation new. “Zoisite: Construct New 345 kV Station” — project 81238 title, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Matagorda, TX: ERCOT queue, 23 active of 30. Same county, not the same substation.
Location
28.8072, -96.0792 · Matagorda County, TX · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the blue triangle labelled 'ZOISITE SUBSTATION' (legend: 'Future Substation') on the AEP Texas Blessing - Zoisite Transmission Line Project concept map. Read at 100 dpi (triangle centroid px 2353.5,1769.6) with a three-point affine fit: the black 'BLESSING SUBSTATION' triangle on OSM Blessing Substation (way 174401034, 28.88651,-96.19080), the black 'STP CONSTRUCTION SUBSTATION' triangle on OSM South Texas Project Switchyard (way 39832667, 28.79956,-96.05017; the fit is isotropic at ~9.2 m/px with these two, which supports the identification), and the south-to-east corner of the drawn line on the corner of the OSM Blessing - STP 345 kV line (way 39836733, 28.80907,-96.17544). The point is ~0.1 km north of that OSM 345 kV line, as the triangle is drawn sitting on the line. +/- ~300 m.
Note: The earlier TPIT project 89993 ('STP to Zoisite: Construct New 345 kV Line') is on the Cancelled tab; 81238 replaces it with two STP-to-Zoisite lines. The AEP fact sheet describes the work as a Blessing - Zoisite rebuild, with a CCN application planned for spring 2026 and service in spring 2029; TPIT 81238 carries ISD 2028-12.
Sources: AEP Texas, Blessing - Zoisite Transmission Line Project concept map (2025), p.1 · AEP Texas, Blessing - Zoisite Transmission Line Project fact sheet (2025), p.1-2 · ERCOT TPIT, projects 81238 and 89993 (release 39, 2026-10-01), sheets FutureTPIT100126NoCost row 881, CancelledTPIT100126NoCost row 57 · OpenStreetMap: Blessing Substation, South Texas Project Switchyard, Blessing - STP 345 kV line (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Zoisite: Construct New 345 kV Station and 345 kV Lines to STP Interconnect the HIF load to the new Zoisite 345 kV station and construct two new STP to Zoisite 345 kV lines. Install two (2) capacitor banks. ERCOT project 81238 · utility no. TP2023803 |
AEP TCC Tier 4 |
Planned Future tab |
345 | Dec 2028 | STP to Zoisite Matagorda County |
STP, Zoisite |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| STP to Zoisite: Construct New 345 kV Line Interconnect the HIF load to the new Zoisite 345 kV station on the STP to Zoisite 345 kV line ERCOT project 89993 |
AEP TCC Tier 4 |
Planned Cancelled tab |
345 | Jun 2027 | STP to Zoisite Matagorda County |
STP, Zoisite |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 81238 | Projected in-service date | May 2028 → Dec 2028 |
| February 1, 2026 | 81238 | Projected in-service date | Jun 2029 → May 2028 |
| June 1, 2025 | 81238 | Projected in-service date | Jun 2027 → Jun 2029 |
| June 1, 2025 | 89993 | Moved between tabs | Future → Cancelled |
| February 1, 2025 | 89993 | First listed | on the Future tab |
| June 1, 2024 | 81238 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.