Substation Scout

RELLIS

Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Brazos County. First named in the release with data as of October 1, 2025.

Brazoscounty as printed
138, 345kV
BRYN, BRYN/BTU AND TNMPutility
4projects listed

Expansion at an existing substation: new voltage level. The quoted wording describes a yard, bus or conversion at a voltage this substation is not otherwise shown at. “establish the BTU RELLIS 345/138 kV Switchyard” — project 99103, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Brazos, TX: ERCOT queue, 1 active of 2. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
BRYN_99100_RELLIS_CAPS
Install first 54 MVAr (in three 18 MVAr stages) 138-kV capacitor bank at RELLIS
ERCOT project 99100A · RPG 25RPG001
BRYN
Tier 1
Planned
Future tab
138 Jun 2028 RELLIS
Brazos County
RELLIS
BRYN_99100_RELLIS_CAPS
Install second 54 MVAr (in three 18 MVAr stages) 138-kV capacitor bank at RELLIS
ERCOT project 99100B · RPG 25RPG001
BRYN
Tier 1
Planned
Future tab
138 Jun 2028 RELLIS
Brazos County
RELLIS
BRYN_99103_RELLIS_TNPONE_DC345KV
Expand the existing RELLIS 138 kV Substation to establish the BTU RELLIS 345/138 kV Switchyard. Install at RELLIS Switchyard two 345/138 kV autotransformers with a nameplate rating of 600 MVA. Expand the TNP One Substation to accommodate two additional 345 kV line terminals. Construct a 40-mile, 345 kV double-circuit line from BTU RELLIS to TNMP TNP One.
ERCOT project 99103 · RPG 25RPG001
BRYN/BTU AND TNMP
Tier 1
Planned
Future tab
345 Oct 2029 RELLIS to TNP One
Brazos / Robertson County
RELLIS, TNP One
BRYN_99105_RIVERSIDE
Construct RELLIS to Riverside 138-kV transmission line on double-circuit capable structures.
ERCOT project 99105B · RPG 25RPG001
BRYN
Tier 1
Planned
Future tab
138 Oct 2029 RELLIS to Riverside
Brazos County
RELLIS, Riverside

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202699100AProjected in-service dateJun 2027 → Jun 2028
October 1, 202699100BProjected in-service dateJun 2027 → Jun 2028
February 1, 202699100AProjected in-service dateJun 2026 → Jun 2027
February 1, 202699100BProjected in-service dateOct 2029 → Jun 2027
October 1, 202599100AFirst listedon the Future tab
October 1, 202599100BFirst listedon the Future tab
October 1, 202599103First listedon the Future tab
October 1, 202599105BFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.