HO Clarke
Named in 11 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand HO Clarke substation” — project 79462, as the utility reported it
A HIFLD substation record has the same name and county: H.O. CLARKE (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Pamela Heights I battery storage at Callisto substation… Connect with HO Clarke 138kV substation at the same generator lead as 01HOCCLO ERCOT project 102534 |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Nov 2026 | HO Clarke Harris County |
HO Clarke |
| HO Clarke to University 69kV to 138kV Conversion. Upgrade portions of retired 69kV Ckt.12 Clinton to Garden Villas (4.7 miles) in preparation for 138kV conversion. Upgrade portions of existing 69kV Ckt.19A Garden Villas to HO Clarke (7.6 miles) in preparation for 138kV conversion. Retire Ckt.19A and reconnect rebuilt circuits to create new 138kV Ckt.xx HO Clarke to University. Retire/remove Garden Villas 69kV facilities including auto A1. ERCOT project 109603A · RPG 26RPG011 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | HO Clarke to University Harris County |
HO Clarke, University |
| HO Clarke to University 69kV to 138kV Conversion. Reconductor portions (2.27 miles) of Ckt.08L HOC to Bunker as part of Ckt.19A Garden Villas to HO Clarke pre-conversion rebuild. ERCOT project 109603B · RPG 26RPG011 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | HO Clarke to University Harris County |
HO Clarke, University |
| Missouri City to HO Clarke - Hardening Upgrades Rebuild/reconductor Ckt.02A HO Clarke to Blue Ridge to Missouri City as a Hardening upgrade. Rebuild/reconductor Ckt.02A Blue Ridge tap section as a Hardening upgrade. ERCOT project 109610A |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | HO Clarke to Missouri City Harris County |
HO Clarke, Missouri City |
| Missouri City to HO Clarke - Hardening Upgrades Rebuild/reconductor portions of Ckt.05A HO Clarke to Blue Ridge as a Hardening upgrade. ERCOT project 109610B |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | HO Clarke to Missouri City Harris County |
HO Clarke, Missouri City |
| Hardening Project for circuit 05 WAP to Missouri City(26RPG021). ERCOT project 109759 · RPG 26RPG021 |
CNP Tier 4 |
Planned Future tab |
138 | Jun 2028 | HO Clarke to Missouri City Harris County |
HO Clarke, Missouri City |
| Dunlavy to HO Clarke Ckt.40A Partial Reconductor Reconductor portions of Ckt.40A Dunlavy to HO Clarke ahead of future 138kV conversions ERCOT project 71106 · RPG 22RPG019 |
CNP Tier 4 |
In-Service Completed tab |
69 | Aug 2026 actual 2026-07 |
Dunlavy to HO Clarke Harris County |
Dunlavy, HO Clarke |
| Heights 138kV Loop Conversion Repurpose/retire existing 69kV Ckts 34A/34B. Unbundle parallel-bundled portions of Ckt.40A HOC to Dunlavy. Reconfigure Ckt.40A to reach a Minimum 1-2000AAC limiting conductor @ 90/120Deg. Upgrade HOC line relaying on 69kV Ckt.40A HOC to Dunlavy. ERCOT project 73578B |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | Dunlavy to HO Clarke Harris County |
Dunlavy, HO Clarke |
| Heights 138kV Loop Conversion Reconfigure Ckt.40A Dunlavy to HO Clarke with a temporary (BP25 to BP26) configuration. Remove the Dunlavy TR3 tap section from Ckt.40A and install tap section to Ckt.90A. ERCOT project 73578J |
CNP Tier 4 |
In-Service Completed tab |
69 | May 2025 actual 2025-05 |
Dunlavy to HO Clarke Harris County |
Dunlavy, HO Clarke |
| Expand HO Clarke substation for Callisto II (22INR0558) ERCOT project 79462 |
CNP Tier 4 |
In-Service Completed tab |
138 | Jul 2026 actual 2026-05 |
HO Clarke Harris County |
HO Clarke |
| Friendswood Energy GENCO GT (24INR0456) Friendswood Energy GENCO GT at HO Clarke substation. Utilize existing HO Clarke to Friendswood Energy generator lead. ERCOT project 87389 |
CNP Tier 4 |
In-Service Completed tab |
138 | Jul 2025 actual 2025-07 |
HO Clarke Harris County |
HO Clarke |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 109759 | Projected in-service date | Dec 2027 → Jun 2028 |
| October 1, 2026 | 71106 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 79462 | Moved between tabs | Current-year planned → Completed |
| July 13, 2026 | 109759 | Projected in-service date | Oct 2027 → Dec 2027 |
| July 13, 2026 | 71106 | Status as reported | Planned → In-Service |
| July 13, 2026 | 102534 | Projected in-service date | Jun 2026 → Nov 2026 |
| July 13, 2026 | 109603A | First listed | on the Future tab |
| July 13, 2026 | 109603B | First listed | on the Future tab |
| July 13, 2026 | 109610A | First listed | on the Future tab |
| July 13, 2026 | 109610B | First listed | on the Future tab |
| July 13, 2026 | 109759 | First listed | on the Future tab |
| June 1, 2026 | 73578J | Status as reported | Planned → In-Service |
| June 1, 2026 | 79462 | Status as reported | Planned → In-Service |
| February 1, 2026 | 102534 | First listed | on the Current-year planned tab |
| February 1, 2026 | 71106 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 71106 | Projected in-service date | May 2026 → Aug 2026 |
| February 1, 2026 | 73578B | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 73578B | Projected in-service date | May 2026 → Oct 2026 |
| February 1, 2026 | 79462 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 87389 | Status as reported | Planned → In-Service |
| October 1, 2025 | 87389 | Projected in-service date | Jan 2025 → Jul 2025 |
| June 1, 2025 | 73578J | Moved between tabs | Future → Completed |
| February 1, 2025 | 73578J | First listed | on the Future tab |
| February 1, 2025 | 87389 | Projected in-service date | Aug 2024 → Jan 2025 |
| October 1, 2024 | 73578B | Projected in-service date | Dec 2025 → May 2026 |
| October 1, 2024 | 87389 | First listed | on the Completed tab |
| June 1, 2024 | 79462 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.