HO Clarke

Named in 11 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.

Harriscounty as printed
69, 138kV
CNPutility
11projects listed

Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand HO Clarke substation” — project 79462, as the utility reported it

A HIFLD substation record has the same name and county: H.O. CLARKE (HARRIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Pamela Heights I battery storage at Callisto substation… Connect with HO Clarke 138kV substation at the same generator lead as 01HOCCLO
ERCOT project 102534
CNP
Tier 4
Planned
Current-year planned tab
138 Nov 2026 HO Clarke
Harris County
HO Clarke
HO Clarke to University 69kV to 138kV Conversion.
Upgrade portions of retired 69kV Ckt.12 Clinton to Garden Villas (4.7 miles) in preparation for 138kV conversion. Upgrade portions of existing 69kV Ckt.19A Garden Villas to HO Clarke (7.6 miles) in preparation for 138kV conversion. Retire Ckt.19A and reconnect rebuilt circuits to create new 138kV Ckt.xx HO Clarke to University. Retire/remove Garden Villas 69kV facilities including auto A1.
ERCOT project 109603A · RPG 26RPG011
CNP
Tier 3
Planned
Future tab
138 May 2028 HO Clarke to University
Harris County
HO Clarke, University
HO Clarke to University 69kV to 138kV Conversion.
Reconductor portions (2.27 miles) of Ckt.08L HOC to Bunker as part of Ckt.19A Garden Villas to HO Clarke pre-conversion rebuild.
ERCOT project 109603B · RPG 26RPG011
CNP
Tier 3
Planned
Future tab
138 May 2028 HO Clarke to University
Harris County
HO Clarke, University
Missouri City to HO Clarke - Hardening Upgrades
Rebuild/reconductor Ckt.02A HO Clarke to Blue Ridge to Missouri City as a Hardening upgrade. Rebuild/reconductor Ckt.02A Blue Ridge tap section as a Hardening upgrade.
ERCOT project 109610A
CNP
Tier 4
Planned
Future tab
138 Dec 2027 HO Clarke to Missouri City
Harris County
HO Clarke, Missouri City
Missouri City to HO Clarke - Hardening Upgrades
Rebuild/reconductor portions of Ckt.05A HO Clarke to Blue Ridge as a Hardening upgrade.
ERCOT project 109610B
CNP
Tier 4
Planned
Future tab
138 Dec 2027 HO Clarke to Missouri City
Harris County
HO Clarke, Missouri City
Hardening Project for circuit 05 WAP to Missouri City(26RPG021).
ERCOT project 109759 · RPG 26RPG021
CNP
Tier 4
Planned
Future tab
138 Jun 2028 HO Clarke to Missouri City
Harris County
HO Clarke, Missouri City
Dunlavy to HO Clarke Ckt.40A Partial Reconductor
Reconductor portions of Ckt.40A Dunlavy to HO Clarke ahead of future 138kV conversions
ERCOT project 71106 · RPG 22RPG019
CNP
Tier 4
In-Service
Completed tab
69 Aug 2026
actual 2026-07
Dunlavy to HO Clarke
Harris County
Dunlavy, HO Clarke
Heights 138kV Loop Conversion
Repurpose/retire existing 69kV Ckts 34A/34B. Unbundle parallel-bundled portions of Ckt.40A HOC to Dunlavy. Reconfigure Ckt.40A to reach a Minimum 1-2000AAC limiting conductor @ 90/120Deg. Upgrade HOC line relaying on 69kV Ckt.40A HOC to Dunlavy.
ERCOT project 73578B
CNP
Tier 4
Planned
Current-year planned tab
138 Oct 2026 Dunlavy to HO Clarke
Harris County
Dunlavy, HO Clarke
Heights 138kV Loop Conversion
Reconfigure Ckt.40A Dunlavy to HO Clarke with a temporary (BP25 to BP26) configuration. Remove the Dunlavy TR3 tap section from Ckt.40A and install tap section to Ckt.90A.
ERCOT project 73578J
CNP
Tier 4
In-Service
Completed tab
69 May 2025
actual 2025-05
Dunlavy to HO Clarke
Harris County
Dunlavy, HO Clarke
Expand HO Clarke substation for Callisto II (22INR0558)
ERCOT project 79462
CNP
Tier 4
In-Service
Completed tab
138 Jul 2026
actual 2026-05
HO Clarke
Harris County
HO Clarke
Friendswood Energy GENCO GT (24INR0456)
Friendswood Energy GENCO GT at HO Clarke substation. Utilize existing HO Clarke to Friendswood Energy generator lead.
ERCOT project 87389
CNP
Tier 4
In-Service
Completed tab
138 Jul 2025
actual 2025-07
HO Clarke
Harris County
HO Clarke

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026109759Projected in-service dateDec 2027 → Jun 2028
October 1, 202671106Moved between tabsCurrent-year planned → Completed
October 1, 202679462Moved between tabsCurrent-year planned → Completed
July 13, 2026109759Projected in-service dateOct 2027 → Dec 2027
July 13, 202671106Status as reportedPlanned → In-Service
July 13, 2026102534Projected in-service dateJun 2026 → Nov 2026
July 13, 2026109603AFirst listedon the Future tab
July 13, 2026109603BFirst listedon the Future tab
July 13, 2026109610AFirst listedon the Future tab
July 13, 2026109610BFirst listedon the Future tab
July 13, 2026109759First listedon the Future tab
June 1, 202673578JStatus as reportedPlanned → In-Service
June 1, 202679462Status as reportedPlanned → In-Service
February 1, 2026102534First listedon the Current-year planned tab
February 1, 202671106Moved between tabsFuture → Current-year planned
February 1, 202671106Projected in-service dateMay 2026 → Aug 2026
February 1, 202673578BMoved between tabsFuture → Current-year planned
February 1, 202673578BProjected in-service dateMay 2026 → Oct 2026
February 1, 202679462Moved between tabsFuture → Current-year planned
October 1, 202587389Status as reportedPlanned → In-Service
October 1, 202587389Projected in-service dateJan 2025 → Jul 2025
June 1, 202573578JMoved between tabsFuture → Completed
February 1, 202573578JFirst listedon the Future tab
February 1, 202587389Projected in-service dateAug 2024 → Jan 2025
October 1, 202473578BProjected in-service dateDec 2025 → May 2026
October 1, 202487389First listedon the Completed tab
June 1, 202479462First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.