Walleye Creek
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Milam County. First named in the release with data as of February 1, 2024.
Milamcounty as printed
138, 345kV
ONCORutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Milam, TX: ERCOT queue, 30 active of 35. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Construct the Voss Lake - Walleye Creek 138 kV Line ERCOT project 110036 · utility no. R6552 |
ONCOR Tier 4 |
Planned Future tab |
138 | Dec 2028 | Voss Lake to Walleye Creek Milam County |
Voss Lake, Walleye Creek |
| Rebuild Austrop Substation (LCRA TSC) - Walleye Creek Switch 345 kV Double Circuit Line ERCOT project 110334 · utility no. R6569 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | Dec 2033 | Walleye Creek to Austrop (LCRA TSC) Milam / Travis County |
Walleye Creek, Austrop (LCRA TSC) |
| Establish Walleye Creek 345/138 kV Switch ERCOT project 76650 · utility no. R6243 · RPG 23RPG030 |
ONCOR Tier 3 |
In-Service Completed tab |
345 | May 2026 actual 2026-05 |
Walleye Creek to Walleye Creek Milam County |
Walleye Creek |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 76650 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 76650 | Status as reported | Planned → In-Service |
| July 13, 2026 | 110036 | First listed | on the Future tab |
| July 13, 2026 | 110334 | First listed | on the Future tab |
| June 1, 2026 | 76650 | Projected in-service date | Dec 2026 → May 2026 |
| February 1, 2026 | 76650 | Projected in-service date | Dec 2025 → Dec 2026 |
| June 1, 2025 | 76650 | Moved between tabs | Future → Current-year planned |
| October 1, 2024 | 76650 | Projected in-service date | May 2025 → Dec 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.