Goddard
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in San Patricio County. First named in the release with data as of February 1, 2018.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand 345 kV Station” — project 109765, as the utility reported it
A project here also describes a named load connected: “Interconnect the FrontierGen Load to the existing Goddard 345 kV station” (project 109765)
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in San Patricio, TX: ERCOT queue, 27 active of 28. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Goddard: Expand 345 kV Station Interconnect the FrontierGen Load to the existing Goddard 345 kV station ERCOT project 109765 · utility no. TP2026107 |
AEP TCC Tier 4 |
Planned Future tab |
345 | Mar 2029 | Goddard San Patricio County |
Goddard |
| Goddard: Expand 345 kV Station Interconnect Bayou Creek Solar to the existing Goddard 345 kV Statiom ERCOT project 111305 · utility no. TP2026163 |
AEP TCC Tier 4 |
Planned Future tab |
345 | Sep 2028 | Goddard San Patricio County |
Goddard |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 111305 | First listed | on the Future tab |
| July 13, 2026 | 109765 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.