Greens Bayou
Named in 7 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
Harriscounty as printed
69, 138, 345kV
CNPutility
7projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| TEXPET Customer and Area 138kV Conversions. De-energize 69kV Ckt.10A Clinton to Greens Bayou. De-energize 138/69kV Clinton auto A1 and all remaining Clinton 69kV facilities. De-energize 138/69kV Greens Bayou auto A5 and all remaining Greens Bayou 69kV facilities. ERCOT project 109585D |
CNP Tier 4 |
Planned Future tab |
69 | May 2028 | Clinton to Greens Bayou Harris County |
Clinton, Greens Bayou |
| This models upgrades required for a proposed load addition near King Substation Install 345 kV CEHE_NewSub on ckt 75 King to Greens Bayou to create ckt.75 King to CEHE_NewSub to Greens Bayou. Upgrade substation equipment at King and Greens Bayou substations. ERCOT project 110079A |
CNP Tier 4 |
Conceptual Future tab |
345 | Oct 2027 | CEHE_NewSub to King/Greens Bayou Harris County |
King, Greens Bayou |
| Galena Park Area Conversion Project De-energize Ckt.20 Greens Bayou to GYPSUM. ERCOT project 66221L · RPG 21RPG020 |
CNP Tier 3 |
In-Service Completed tab |
69 | May 2025 actual 2025-04 |
Greens Bayou to GYPSUM Harris County |
Greens Bayou, GYPSUM |
| Greens Bayou to Clinton 138kV Conversion Remove Wallisville substation from Ckt.10A service… Resulting in Ckt.10A Clinton to Greens Bayou ERCOT project 67422F |
CNP Tier 4 |
Planned Future tab |
69 | Jan 2027 | Clinton to Greens Bayou Harris County |
Clinton, Greens Bayou |
| Greens Bayou to Clinton 138kV Conversion Convert Wallisville substation from Ckt.10A service to 138kV loop service on 138kV TEXWAL to Clinton Ckt.13 to create new Ckt.13 Greens Bayou to TEXWAL to Wallisville to Clinton. ERCOT project 67422G |
CNP Tier 4 |
Planned Future tab |
138 | Jan 2027 | Greens Bayou to Clinton Harris County |
Greens Bayou, Clinton |
| Install generator lead at existing GBY Substation for new interconnection to NRG customer substation. Previously known as GBY-6 ERCOT project 99134 |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | Greens Bayou Harris County |
Greens Bayou |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.69B Greens Bayou to Deepwater to increase thermal limits as part of FRM2 upgrades ERCOT project 99453B |
CNP Tier 4 |
Planned Future tab |
345 | Mar 2028 | Greens Bayou to Deepwater Harris County |
Greens Bayou, Deepwater |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 99453B | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 99453B | Projected in-service date | Dec 2026 → Mar 2028 |
| July 13, 2026 | 109585D | First listed | on the Future tab |
| July 13, 2026 | 110079A | First listed | on the Future tab |
| July 13, 2026 | 99453B | Projected in-service date | May 2026 → Dec 2026 |
| February 1, 2026 | 67422F | Projected in-service date | Dec 2026 → Jan 2027 |
| February 1, 2026 | 67422G | Projected in-service date | Dec 2026 → Jan 2027 |
| February 1, 2026 | 99453B | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 99134 | First listed | on the Future tab |
| October 1, 2025 | 99453B | First listed | on the Future tab |
| June 1, 2025 | 66221L | Moved between tabs | Future → Completed |
| June 1, 2025 | 66221L | Status as reported | Planned → In-Service |
| October 1, 2024 | 66221L | Status as reported | In-Service → Planned |
| October 1, 2024 | 66221L | Projected in-service date | Oct 2024 → May 2025 |
| June 1, 2024 | 66221L | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner