Shepherd Rd
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of May 12, 2023.
Bexarcounty as printed
138kV
CPS/NOutility
1projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade Shepherd Rd to Valley Rd 138kV line Reconfiguration. ERCOT project 67992A |
CPS/NO Tier 3 |
In-Service Completed tab |
138 | May 2025 actual 2025-04 |
5378, 5465 to 5320 Bexar County |
Howard Switching, Shepherd Rd, Valley Rd |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 67992A | Status as reported | Planned → In-Service |
| June 1, 2025 | 67992A | Moved between tabs | Future → Completed |
| June 1, 2024 | 67992A | Projected in-service date | Feb 2024 → May 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner