Howard
Named in 8 listed projects in ERCOT’s transmission project tracking workbook, in Bexar County. First named in the release with data as of February 1, 2015.
Also printed as: Howard Switching
A HIFLD substation record has the same name and county: HOWARD (BEXAR County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Bexar, TX: ERCOT queue, 22 active of 23. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install a 50MVAr Capacitor Bank at Howard Substation ERCOT project 100691 |
CPS/NO Tier 4 |
Planned Future tab |
138 | Jan 2032 | 5230 Bexar County |
Howard |
| Blu Lacy to Howard: Construct New 765 kV Line Construct a new 765 kV single circuit line from Blu Lacy to Howard ERCOT project 102901 · utility no. TP2025322 · RPG 25RPG025 |
AEP TCC Tier 1 |
Planned Future tab |
765 | Jan 2032 | Blu Lacy to Howard Nueces / Bexar County |
Blu Lacy, Howard |
| Construct the New Bell County East - Howard (CPS) 765 kV Line ERCOT project 104710 · utility no. R6448 |
ONCOR Tier 1 |
Planned Future tab |
765 | May 2031 | New Bell County East to Howard Bell / Bexar County |
New Bell County East, Howard |
| CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade Shepherd Rd to Valley Rd 138kV line Reconfiguration. ERCOT project 67992A |
CPS/NO Tier 3 |
In-Service Completed tab |
138 | May 2025 actual 2025-04 |
5378, 5465 to 5320 Bexar County |
Howard Switching, Shepherd Rd, Valley Rd |
| CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade Upgrade Hamilton to Medical Center 138KV Line to 469MVA ERCOT project 67992D |
CPS/NO Tier 3 |
In-Service Completed tab |
138 | May 2025 actual 2025-04 |
5187 to 5300 Bexar County |
Howard Switching |
| San Antonio South Reliability RPG Project Rebuild/Upgrade 14.9 mile Cagnon to Howard 345kV double circuit transmission line with a minimum rating of 1746 MVA. ERCOT project 75255D · RPG 22RPG048 |
CPS/NO Tier 1 |
Planned Future tab |
345 | May 2027 | 5231 to 5056 Bexar County |
Cagnon, Howard |
| San Antonio South Reliability RPG Project Rebuild/Upgrade 14.9 mile Cagnon to Howard 345kV double circuit transmission line with a minimum rating of 1746 MVA. ERCOT project 75255E · RPG 22RPG048 |
CPS/NO Tier 1 |
Planned Future tab |
345 | May 2027 | 5231 to 5056 Bexar County |
Cagnon, Howard |
| Solstice to Howard: Construct New 765 kV Single Circuit Line Construct a new 765 kV single circuit line from Solstice to Howard ERCOT project 98595 · RPG H.B. 5066 |
AEP TNC Tier 1 |
Planned Future tab |
765 | Oct 2030 | Solstice to Howard Pecos / Bexar County |
Solstice, Howard |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 100691 | Projected in-service date | Jun 2028 → Jan 2032 |
| October 1, 2026 | 102901 | Projected in-service date | Nov 2031 → Jan 2032 |
| October 1, 2026 | 67992A | Status as reported | Planned → In-Service |
| October 1, 2026 | 67992D | Status as reported | Planned → In-Service |
| October 1, 2026 | 98595 | Projected in-service date | Jan 2029 → Oct 2030 |
| June 1, 2026 | 102901 | First listed | on the Future tab |
| June 1, 2026 | 104710 | First listed | on the Future tab |
| June 1, 2026 | 98595 | Projected in-service date | Dec 2030 → Jan 2029 |
| October 1, 2025 | 100691 | First listed | on the Future tab |
| October 1, 2025 | 98595 | First listed | on the Future tab |
| June 1, 2025 | 67992A | Moved between tabs | Future → Completed |
| June 1, 2025 | 67992D | Moved between tabs | Future → Completed |
| February 1, 2025 | 75255D | Projected in-service date | Jun 2027 → May 2027 |
| February 1, 2025 | 75255E | Projected in-service date | Jun 2027 → May 2027 |
| October 1, 2024 | 67992D | Projected in-service date | Jan 2026 → May 2025 |
| June 1, 2024 | 67992A | Projected in-service date | Feb 2024 → May 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.