King
Named in 11 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2020.
Harriscounty as printed
138, 345kV
CNPutility
11projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Rebuild/reconductor portions of Ckt.94B King to CHAMON as a Hardening upgrade ERCOT project 102536 |
CNP Tier 4 |
Planned Future tab |
138 | Mar 2027 | King to CHAMON Harris County |
King, CHAMON |
| Adds type A load records at King ERCOT project 105622A |
CNP Tier 4 |
Planned Future tab |
138 | Jan 2027 | King Harris County |
King |
| Adds type A load records at King ERCOT project 105622B |
CNP Tier 4 |
Planned Future tab |
138 | Jul 2027 | King Harris County |
King |
| This models upgrades required for a proposed load addition near King Substation Install 345 kV CEHE_NewSub on ckt 75 King to Greens Bayou to create ckt.75 King to CEHE_NewSub to Greens Bayou. Upgrade substation equipment at King and Greens Bayou substations. ERCOT project 110079A |
CNP Tier 4 |
Conceptual Future tab |
345 | Oct 2027 | CEHE_NewSub to King/Greens Bayou Harris County |
King, Greens Bayou |
| This models upgrades required for a proposed load addition near King Substation Install 300 MVAR capacitor bank at CEHE_NewSub. ERCOT project 110079B |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2030 | CEHE_NewSub Harris County |
King |
| This models upgrades required for a proposed load addition Install 345 kV substation. Loop 345 kV Circuit 97 Jordan – King into the new 345 kV substation. ERCOT project 110090A |
CNP Tier 4 |
Conceptual Future tab |
345 | Oct 2027 | NEWSUB to Jordan/King Harris County |
Jordan, King |
| This models upgrades required for a proposed load addition Increase the size of the first 345 kV capacitor at NEWSUB bank from 200 MVAR to 300 MVAR. Add second 300MVAR capacitor bank. ERCOT project 110090C |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2031 | NEWSUB to Jordan/King Harris County |
Jordan, King |
| King Substation - Add 3rd Distribution Transformer Install the third King distribution transformer. Tap on Ckt.86E to create new Ckt.86E Newport to King tap to Jonte. Updated for 26SSWG base case ERCOT project 86015 |
CNP Tier 4 |
In-Service Completed tab |
138 | Mar 2026 actual 2026-03 |
King to Newport/Jonte Harris County |
King, Newport, Jonte |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.97B King to North Belt to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453E |
CNP Tier 4 |
Planned Future tab |
345 | May 2027 | King to North Belt Harris County |
King, North Belt |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.97C Jordan to King to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453H |
CNP Tier 4 |
Planned Current-year planned tab |
345 | Nov 2026 | Jordan to King Chambers / Harris County |
Jordan, King |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.75H King to Rothwood to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453M |
CNP Tier 4 |
Planned Current-year planned tab |
345 | Aug 2026 | King to Rothwood Harris County |
King, Rothwood |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 99453E | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 99453E | Projected in-service date | Oct 2026 → May 2027 |
| October 1, 2026 | 99453H | Projected in-service date | Jul 2026 → Nov 2026 |
| October 1, 2026 | 99453M | Projected in-service date | Jul 2026 → Aug 2026 |
| July 13, 2026 | 99453E | Projected in-service date | Jun 2026 → Oct 2026 |
| July 13, 2026 | 99453H | Projected in-service date | Jun 2026 → Jul 2026 |
| July 13, 2026 | 99453M | Projected in-service date | Jun 2026 → Jul 2026 |
| July 13, 2026 | 102536 | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 102536 | Projected in-service date | Dec 2026 → Mar 2027 |
| July 13, 2026 | 105622A | First listed | on the Future tab |
| July 13, 2026 | 105622B | First listed | on the Future tab |
| July 13, 2026 | 110079A | First listed | on the Future tab |
| July 13, 2026 | 110079B | First listed | on the Future tab |
| July 13, 2026 | 110090A | First listed | on the Future tab |
| July 13, 2026 | 110090C | First listed | on the Future tab |
| July 13, 2026 | 99453E | Projected in-service date | May 2026 → Jun 2026 |
| July 13, 2026 | 99453H | Projected in-service date | May 2026 → Jun 2026 |
| July 13, 2026 | 99453M | Projected in-service date | May 2026 → Jun 2026 |
| June 1, 2026 | 86015 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 86015 | Status as reported | Planned → In-Service |
| June 1, 2026 | 86015 | Projected in-service date | Jan 2026 → Mar 2026 |
| February 1, 2026 | 102536 | First listed | on the Current-year planned tab |
| February 1, 2026 | 86015 | Projected in-service date | Dec 2025 → Jan 2026 |
| February 1, 2026 | 99453E | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 99453E | Projected in-service date | Oct 2029 → May 2026 |
| February 1, 2026 | 99453H | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 99453M | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 99453E | First listed | on the Future tab |
| October 1, 2025 | 99453H | First listed | on the Future tab |
| October 1, 2025 | 99453M | First listed | on the Future tab |
| June 1, 2025 | 86015 | Moved between tabs | Future → Current-year planned |
| October 1, 2024 | 86015 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.