King

Named in 11 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2020.

Harriscounty as printed
138, 345kV
CNPutility
11projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Rebuild/reconductor portions of Ckt.94B King to CHAMON as a Hardening upgrade
ERCOT project 102536
CNP
Tier 4
Planned
Future tab
138 Mar 2027 King to CHAMON
Harris County
King, CHAMON
Adds type A load records at King
ERCOT project 105622A
CNP
Tier 4
Planned
Future tab
138 Jan 2027 King
Harris County
King
Adds type A load records at King
ERCOT project 105622B
CNP
Tier 4
Planned
Future tab
138 Jul 2027 King
Harris County
King
This models upgrades required for a proposed load addition near King Substation
Install 345 kV CEHE_NewSub on ckt 75 King to Greens Bayou to create ckt.75 King to CEHE_NewSub to Greens Bayou. Upgrade substation equipment at King and Greens Bayou substations.
ERCOT project 110079A
CNP
Tier 4
Conceptual
Future tab
345 Oct 2027 CEHE_NewSub to King/Greens Bayou
Harris County
King, Greens Bayou
This models upgrades required for a proposed load addition near King Substation
Install 300 MVAR capacitor bank at CEHE_NewSub.
ERCOT project 110079B
CNP
Tier 4
Conceptual
Future tab
345 Jul 2030 CEHE_NewSub
Harris County
King
This models upgrades required for a proposed load addition
Install 345 kV substation. Loop 345 kV Circuit 97 Jordan – King into the new 345 kV substation.
ERCOT project 110090A
CNP
Tier 4
Conceptual
Future tab
345 Oct 2027 NEWSUB to Jordan/King
Harris County
Jordan, King
This models upgrades required for a proposed load addition
Increase the size of the first 345 kV capacitor at NEWSUB bank from 200 MVAR to 300 MVAR. Add second 300MVAR capacitor bank.
ERCOT project 110090C
CNP
Tier 4
Conceptual
Future tab
345 Jul 2031 NEWSUB to Jordan/King
Harris County
Jordan, King
King Substation - Add 3rd Distribution Transformer
Install the third King distribution transformer. Tap on Ckt.86E to create new Ckt.86E Newport to King tap to Jonte. Updated for 26SSWG base case
ERCOT project 86015
CNP
Tier 4
In-Service
Completed tab
138 Mar 2026
actual 2026-03
King to Newport/Jonte
Harris County
King, Newport, Jonte
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.97B King to North Belt to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453E
CNP
Tier 4
Planned
Future tab
345 May 2027 King to North Belt
Harris County
King, North Belt
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.97C Jordan to King to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453H
CNP
Tier 4
Planned
Current-year planned tab
345 Nov 2026 Jordan to King
Chambers / Harris County
Jordan, King
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.75H King to Rothwood to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453M
CNP
Tier 4
Planned
Current-year planned tab
345 Aug 2026 King to Rothwood
Harris County
King, Rothwood

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202699453EMoved between tabsCurrent-year planned → Future
October 1, 202699453EProjected in-service dateOct 2026 → May 2027
October 1, 202699453HProjected in-service dateJul 2026 → Nov 2026
October 1, 202699453MProjected in-service dateJul 2026 → Aug 2026
July 13, 202699453EProjected in-service dateJun 2026 → Oct 2026
July 13, 202699453HProjected in-service dateJun 2026 → Jul 2026
July 13, 202699453MProjected in-service dateJun 2026 → Jul 2026
July 13, 2026102536Moved between tabsCurrent-year planned → Future
July 13, 2026102536Projected in-service dateDec 2026 → Mar 2027
July 13, 2026105622AFirst listedon the Future tab
July 13, 2026105622BFirst listedon the Future tab
July 13, 2026110079AFirst listedon the Future tab
July 13, 2026110079BFirst listedon the Future tab
July 13, 2026110090AFirst listedon the Future tab
July 13, 2026110090CFirst listedon the Future tab
July 13, 202699453EProjected in-service dateMay 2026 → Jun 2026
July 13, 202699453HProjected in-service dateMay 2026 → Jun 2026
July 13, 202699453MProjected in-service dateMay 2026 → Jun 2026
June 1, 202686015Moved between tabsCurrent-year planned → Completed
June 1, 202686015Status as reportedPlanned → In-Service
June 1, 202686015Projected in-service dateJan 2026 → Mar 2026
February 1, 2026102536First listedon the Current-year planned tab
February 1, 202686015Projected in-service dateDec 2025 → Jan 2026
February 1, 202699453EMoved between tabsFuture → Current-year planned
February 1, 202699453EProjected in-service dateOct 2029 → May 2026
February 1, 202699453HMoved between tabsFuture → Current-year planned
February 1, 202699453MMoved between tabsFuture → Current-year planned
October 1, 202599453EFirst listedon the Future tab
October 1, 202599453HFirst listedon the Future tab
October 1, 202599453MFirst listedon the Future tab
June 1, 202586015Moved between tabsFuture → Current-year planned
October 1, 202486015First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.