SINTEK
Named in 7 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2023.
A HIFLD substation record has the same name and county: SINTEK (BRAZORIA County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits. Upgrade Ckt.26 Clute to SINTEK to increase thermal limits. ERCOT project 109575D · RPG 26RPG012 |
CNP Tier 3 |
Planned Future tab |
138 | May 2029 | Clute to SINTEK Brazoria County |
Clute, SINTEK |
| Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits. Upgrade Ckt.82C Angleton to RIWOOD to increase thermal limits. ERCOT project 109575E · RPG 26RPG012 |
CNP Tier 3 |
Planned Future tab |
138 | May 2029 | Clute to SINTEK Brazoria County |
Clute, SINTEK |
| Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits. Upgrade Ckt.82 RIWOOD to Clute to increase thermal limits. ERCOT project 109575F · RPG 26RPG012 |
CNP Tier 3 |
Planned Future tab |
138 | May 2029 | Clute to SINTEK Brazoria County |
Clute, SINTEK |
| Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits. Upgrade Ckt.26E SINTEK to CAMDEN to increase thermal limits. ERCOT project 109575I · RPG 26RPG012 |
CNP Tier 3 |
Planned Future tab |
138 | May 2029 | SINTEK to CAMDEN Brazoria County |
SINTEK, CAMDEN |
| Clute 138kV Switching Station Reconfigure existing Ckt.26D STRATT to SINTEK and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.26 STRATT to Clute to SINTEK. ERCOT project 72044C · RPG 22RPG038 |
CNP Tier 3 |
Planned Future tab |
138 | Mar 2028 | Clute to SINTEK Brazoria County |
Clute, SINTEK |
| Upgrade Ckt.26 STRATT to SINTEK to increase thermal limits. Upgrade Ckt.26F Velasco to CAMDEN to increase thermal limits. Upgrade Ckt.26D Clute to SINTEK to increase thermal limits. (Expect a full 2-959ACSS reconductor Ckt.26 Clute to SINTEK and a 1-795AAC conductor limitation Ckt.26 STRATT to Clute) ERCOT project 85987A · RPG 24RPG012 |
CNP Tier 3 |
Planned Future tab |
138 | May 2027 | Clute to SINTEK Brazoria County |
Clute, SINTEK |
| Clute to Velasco Ckt.82 Upgrades RPG Upgrade Ckt.26E SINTEK to CAMDEN to increase thermal limits. ERCOT project 90242A · RPG 24RPG012 |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | SINTEK to CAMDEN Brazoria County |
SINTEK, CAMDEN |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 72044C | Projected in-service date | Dec 2027 → Mar 2028 |
| July 13, 2026 | 109575D | First listed | on the Future tab |
| July 13, 2026 | 109575E | First listed | on the Future tab |
| July 13, 2026 | 109575F | First listed | on the Future tab |
| July 13, 2026 | 109575I | First listed | on the Future tab |
| June 1, 2026 | 72044C | Moved between tabs | Current-year planned → Future |
| June 1, 2026 | 72044C | Projected in-service date | Dec 2026 → Dec 2027 |
| February 1, 2026 | 72044C | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 85987A | Projected in-service date | May 2026 → May 2027 |
| February 1, 2026 | 90242A | Projected in-service date | May 2026 → May 2027 |
| June 1, 2025 | 72044C | Projected in-service date | May 2026 → Dec 2026 |
| February 1, 2025 | 90242A | First listed | on the Future tab |
| October 1, 2024 | 85987A | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.