Juncus
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Taylor County. First named in the release with data as of October 1, 2023.
Described as new. The quoted wording calls this substation new. “Juncus: Construct New 69 kV Station” — project 76139 title, as the utility reported it
Reported complete. Project 76139 is on the Completed tab (actual in-service 2026-07); Project 81354 is on the Completed tab (actual in-service 2025-04); Project 90004 is on the Completed tab (actual in-service 2025-04), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Taylor, TX: ERCOT queue, 13 active of 15. Same county, not the same substation.
Location
Taylor County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: TPIT 76139 (station) is In-Service, ISD 2026-06; TPIT 90004 (temporary tap) is listed Planned but sits on the Completed tab.
Sources: ERCOT Transmission Project and Information Tracking (TPIT) workbook, project(s) 76139, 90004, 81354 (release 2026-10-01) · OpenStreetMap: Snodgrass Substation (GSEC), the load station Juncus serves (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Juncus: Construct New 69 kV Station Interconnect the TEC Snodgrass load to the new Juncus 69 kV station on the Abilene South to Steamboat 69 kV line ERCOT project 76139 · utility no. TP2023074 |
AEP TNC Tier 4 |
In-Service Completed tab |
69 | Jun 2026 actual 2026-07 |
Juncus Taylor County |
Juncus |
| GSEC_9452_Add_Snodgrass_Sub Adding new Snodgrass sub to connect to AEP's Juncus Station. ERCOT project 81354 |
GSEC Tier 4 |
In-Service Completed tab |
69 | Apr 2025 actual 2025-04 |
No terminals printed Taylor County |
Snodgrass, Juncus |
| Juncus: Construct New 69 kV Temporary Tap Interconnect the TEC Snodgrass load to the new Juncus 69 kV temporary tap on the Abilene South to Steamboat 69 kV line ERCOT project 90004 · utility no. TP2023074 |
AEP TNC Tier 4 |
Planned Completed tab |
69 | Jan 2026 actual 2025-04 |
Juncus Taylor County |
Juncus |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 76139 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 76139 | Status as reported | Planned → In-Service |
| October 1, 2026 | 81354 | Moved between tabs | Current-year planned → Completed |
| October 1, 2026 | 81354 | Status as reported | Planned → In-Service |
| July 13, 2026 | 76139 | Projected in-service date | May 2026 → Jun 2026 |
| July 13, 2026 | 90004 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 76139 | Projected in-service date | Mar 2026 → May 2026 |
| February 1, 2026 | 76139 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 90004 | Projected in-service date | Jun 2025 → Jan 2026 |
| October 1, 2025 | 76139 | Moved between tabs | Current-year planned → Future |
| October 1, 2025 | 76139 | Projected in-service date | Sep 2025 → Mar 2026 |
| October 1, 2025 | 90004 | Projected in-service date | Mar 2025 → Jun 2025 |
| June 1, 2025 | 76139 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 81354 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 90004 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 90004 | First listed | on the Future tab |
| June 1, 2024 | 76139 | Projected in-service date | Apr 2025 → Sep 2025 |
| June 1, 2024 | 81354 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.