Named in 12 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2023.

Brazoriacounty as printed
138kV
CNPutility
12projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.
Upgrade Ckt.26 STRATT to Clute to increase thermal limits.
ERCOT project 109575C · RPG 26RPG012
CNP
Tier 3
Planned
Future tab
138 May 2029 STRATT to Clute
Brazoria County
STRATT, Clute
Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.
Upgrade Ckt.26 Clute to SINTEK to increase thermal limits.
ERCOT project 109575D · RPG 26RPG012
CNP
Tier 3
Planned
Future tab
138 May 2029 Clute to SINTEK
Brazoria County
Clute, SINTEK
Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.
Upgrade Ckt.82C Angleton to RIWOOD to increase thermal limits.
ERCOT project 109575E · RPG 26RPG012
CNP
Tier 3
Planned
Future tab
138 May 2029 Clute to SINTEK
Brazoria County
Clute, SINTEK
Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.
Upgrade Ckt.82 RIWOOD to Clute to increase thermal limits.
ERCOT project 109575F · RPG 26RPG012
CNP
Tier 3
Planned
Future tab
138 May 2029 Clute to SINTEK
Brazoria County
Clute, SINTEK
Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.
Upgrade Ckt.82 Clute to CAVERN to BIPORT to increase thermal limits.
ERCOT project 109575G · RPG 26RPG012
CNP
Tier 3
Planned
Future tab
138 May 2029 CAVERN to Clute/BIPORT
Brazoria County
CAVERN, Clute, BIPORT
Clute 138kV Switching Station
Reconfigure existing Ckt.82F RIWOOD to CAVERN to BIPORT and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.82 RIWOOD to Clute to CAVERN to BIPORT.
ERCOT project 72044A · RPG 22RPG038
CNP
Tier 3
Planned
Future tab
138 Mar 2028 Clute to RIWOOD/CAVERN
Brazoria County
Clute, RIWOOD, CAVERN
Clute 138kV Switching Station
ERCOT project 72044B · RPG 22RPG038
CNP
Tier 3
Planned
Current-year planned tab
138 Dec 2026 No terminals printed
Brazoria County
Clute
Clute 138kV Switching Station
Reconfigure existing Ckt.26D STRATT to SINTEK and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.26 STRATT to Clute to SINTEK.
ERCOT project 72044C · RPG 22RPG038
CNP
Tier 3
Planned
Future tab
138 Mar 2028 Clute to SINTEK
Brazoria County
Clute, SINTEK
Clute 138kV Switching Station
ERCOT project 72044D · RPG 22RPG038
CNP
Tier 3
Planned
Current-year planned tab
138 Dec 2026 No terminals printed
Brazoria County
Clute
Samaritan 138kV Switching Station
Connect Samaritan CEHE substation with two leads to TNMP_White Oak distribution substation.
ERCOT project 75776B
CNP
Tier 4
Planned
Future tab
138 May 2027 Samaritan to Angleton/Clute
Brazoria County
Samaritan, Angleton, Clute
Upgrade Ckt.26 STRATT to SINTEK to increase thermal limits. Upgrade Ckt.26F Velasco to CAMDEN to increase thermal limits.
Upgrade Ckt.26D Clute to SINTEK to increase thermal limits. (Expect a full 2-959ACSS reconductor Ckt.26 Clute to SINTEK and a 1-795AAC conductor limitation Ckt.26 STRATT to Clute)
ERCOT project 85987A · RPG 24RPG012
CNP
Tier 3
Planned
Future tab
138 May 2027 Clute to SINTEK
Brazoria County
Clute, SINTEK
Clute to Velasco Ckt.82 Upgrades RPG
Upgrade Ckt.82F RIWOOD to CAVERN to BIPORT to increase thermal limits. (Expect partial reconductor to Ckt.86F RIWOOD to CAVERN with 1-795ACSR limiting conductor and full 2-959ACSS reconductor to Ckt.86F CAVERN to BIPORT)
ERCOT project 90242B · RPG 24RPG012
CNP
Tier 4
Planned
Future tab
138 May 2027 CAVERN to Clute/BIPORT
Brazoria County
CAVERN, Clute, BIPORT

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202672044AProjected in-service dateDec 2027 → Mar 2028
October 1, 202672044CProjected in-service dateDec 2027 → Mar 2028
July 13, 2026109575CFirst listedon the Future tab
July 13, 2026109575DFirst listedon the Future tab
July 13, 2026109575EFirst listedon the Future tab
July 13, 2026109575FFirst listedon the Future tab
July 13, 2026109575GFirst listedon the Future tab
July 13, 202675776BMoved between tabsCurrent-year planned → Future
July 13, 202675776BProjected in-service dateOct 2026 → May 2027
June 1, 202672044AMoved between tabsCurrent-year planned → Future
June 1, 202672044AProjected in-service dateDec 2026 → Dec 2027
June 1, 202672044CMoved between tabsCurrent-year planned → Future
June 1, 202672044CProjected in-service dateDec 2026 → Dec 2027
February 1, 202672044AMoved between tabsFuture → Current-year planned
February 1, 202672044BMoved between tabsFuture → Current-year planned
February 1, 202672044CMoved between tabsFuture → Current-year planned
February 1, 202672044DMoved between tabsFuture → Current-year planned
February 1, 202675776BMoved between tabsFuture → Current-year planned
February 1, 202675776BProjected in-service dateFeb 2026 → Oct 2026
February 1, 202685987AProjected in-service dateMay 2026 → May 2027
February 1, 202690242BProjected in-service dateMay 2026 → May 2027
October 1, 202575776BMoved between tabsCurrent-year planned → Future
October 1, 202575776BProjected in-service dateOct 2025 → Feb 2026
June 1, 202572044AProjected in-service dateMay 2026 → Dec 2026
June 1, 202572044BProjected in-service dateMay 2026 → Dec 2026
June 1, 202572044CProjected in-service dateMay 2026 → Dec 2026
June 1, 202572044DProjected in-service dateMay 2026 → Dec 2026
June 1, 202575776BMoved between tabsFuture → Current-year planned
February 1, 202590242BFirst listedon the Future tab
October 1, 202475776BProjected in-service dateMay 2025 → Oct 2025
October 1, 202485987AFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.