Missouri City
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Fort Bend County. First named in the release with data as of February 1, 2021.
A HIFLD substation record has the same name and county: MISSOURI CITY (FORT BEND County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Fort Bend, TX: ERCOT queue, 10 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Rebuild/reconductor portions of Ckt.05D Missouri City to Westchase as a Hardening Upgrade(26RPG024). ERCOT project 109761 · RPG 26RPG024 |
CNP Tier 3 |
Planned Future tab |
138 | Jun 2028 | Westchase to Missouri City Harris / Fort Bend County |
Westchase, Missouri City |
| Rebuild/reconductor portions of Ckt.05A Missouri City to Sienna as a Hardening upgrade(24RPG030). Rebuild and reconductor portion of Missouri City to Sienna Ckt.05A as a Hardening upgrade ERCOT project 65719 · RPG 24RPG030 |
CNP Tier 4 |
Planned Future tab |
138 | Feb 2027 | Missouri City to Sienna Fort Bend County |
Missouri City, Sienna |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 109761 | Projected in-service date | Dec 2027 → Jun 2028 |
| October 1, 2026 | 65719 | Moved between tabs | Current-year planned → Future |
| October 1, 2026 | 65719 | Projected in-service date | Oct 2026 → Feb 2027 |
| July 13, 2026 | 109761 | Projected in-service date | Oct 2027 → Dec 2027 |
| July 13, 2026 | 109761 | First listed | on the Future tab |
| February 1, 2026 | 65719 | Projected in-service date | Dec 2025 → Oct 2026 |
| October 1, 2025 | 65719 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 65719 | Projected in-service date | Dec 2026 → Dec 2025 |
| February 1, 2025 | 65719 | Moved between tabs | Completed → Future |
| February 1, 2025 | 65719 | Status as reported | Conceptual → Planned |
| February 1, 2025 | 65719 | Projected in-service date | Jun 2024 → Dec 2026 |
| October 1, 2024 | 65719 | Status as reported | Planned → Conceptual |
| June 1, 2024 | 65719 | Moved between tabs | Future → Completed |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.