Riley
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Wilbarger County, plus 1 on its Cancelled tab. First named in the release with data as of June 1, 2015.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand 345 kV Station” — project 98601, as the utility reported it
A project here also describes a named load connected: “Interconnect the OPS load to the existing Riley 345 kV station” (project 98610)
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Wilbarger, TX: ERCOT queue, 21 active of 24 · SPP queue, 2 active of 12. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| WesternWind_Switch Establish Western Wind Switch to interconnect Adamstown solar ERCOT project 104830 |
ONCOR Tier 4 |
Planned Current-year planned tab |
345 | Dec 2026 | Krum West Switch to Riley Wilbarger County |
Krum West Switch, Riley |
| Riley: Construct New 345 kV Terminal Interconnect the Sabey Data Center load to the existing Riley 345 kV station ERCOT project 90051 · utility no. TP2024133 |
AEP TNC/ETT Tier 4 |
Planned Future tab |
345 | Apr 2027 | Riley Wilbarger County |
Riley |
| Riley: Expand 345 kV Station Interconnect Dundee Wind and Felix Solar to the existing Riley 345 kV station ERCOT project 98601 · utility no. TP2025169 |
ETT/AEP TNC Tier 4 |
Planned Future tab |
345 | Apr 2027 | Riley Wilbarger County |
Riley |
| Riley: Expand 345 kV Station Interconnect the OPS load to the existing Riley 345 kV station ERCOT project 98610 |
ETT/AEP TNC Tier 4 |
Planned Future tab |
345 | Oct 2027 | Riley Wilbarger County |
Riley |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Riley: Construct New 345 kV Terminal Interconnect the Gamma load to the existing Riley 345 kV station ERCOT project 81581 |
AEP TNC/ETT Tier 4 |
Conceptual Cancelled tab |
345 | Jun 2026 | Riley Wilbarger County |
Riley |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 104830 | Moved between tabs | Future → Current-year planned |
| October 1, 2026 | 104830 | Projected in-service date | May 2027 → Dec 2026 |
| July 13, 2026 | 98601 | Projected in-service date | Jul 2027 → Apr 2027 |
| June 1, 2026 | 104830 | First listed | on the Future tab |
| June 1, 2026 | 90051 | Projected in-service date | Feb 2028 → Apr 2027 |
| February 1, 2026 | 90051 | Projected in-service date | Oct 2027 → Feb 2028 |
| October 1, 2025 | 98601 | First listed | on the Future tab |
| October 1, 2025 | 98610 | First listed | on the Future tab |
| June 1, 2025 | 81581 | Moved between tabs | Future → Cancelled |
| February 1, 2025 | 90051 | First listed | on the Future tab |
| June 1, 2024 | 81581 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.