Martin Lake
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Rusk County. First named in the release with data as of June 1, 2026.
Also printed as: Martin Lake 765 kV Switch
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Rusk, TX: ERCOT queue, 5 active of 6 · SPP queue, 1 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| This models CEHE's Portion of the 765 kV STEP project Install 765kV line from CEHE's Morley substation to Oncor's Martin Lake substation. ERCOT project 103797H · RPG 25RPG025 |
CNP Tier 1 |
Planned Future tab |
765 | May 2032 | MORLEY to Martin Lake Wharton / Rusk County |
MORLEY, Martin Lake |
| East Watermill - Martin Lake 765 kV Line Establish East Watermill - Martin Lake 765 kV Line ERCOT project 112226 · utility no. M4458 · RPG 25RPG025 |
ONCOR Tier 1 |
Planned Future tab |
765 | Dec 2032 | East Watermill 765 kV Switch to Martin Lake 765 kV Switch Dallas / Rusk County |
East Watermill 765 kV Switch, Martin Lake 765 kV Switch |
| Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (2) 300 MVAr switchable line reactors and 2-225MVAR bus reactors. Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (1) 300 MVAr switchable line reactors. ERCOT project 116019B |
CNP Tier 4 |
Planned Future tab |
765 | May 2032 | CEHE_NewSub to Martin Lake Grimes / Rusk County |
Martin Lake |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2026 | 112226 | First listed | on the Future tab |
| October 1, 2026 | 116019B | First listed | on the Future tab |
| June 1, 2026 | 103797H | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.