Warda

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Fayette County. First named in the release with data as of February 1, 2017.

Fayettecounty as printed
138kV
LCRATSCutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Fayette, TX: ERCOT queue, 4 active of 5. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Salem - Warda Transmission Line Overhaul
Upgrade 33-mile Salem to Round tap top to Warda 138kV lines to 478MVA as an LCP project for Batch Zero Base Load
ERCOT project 109888
LCRATSC
Tier 4
Conceptual
Future tab
138 May 2031 Salem to Warda
Washington / Fayette County
Salem, Warda
LCRATSC Warda Generator Circuit Breaker Addition
This project installs a new 138-kV circuit breaker and associated terminal equipment at the Warda Substation, in a ring bus configuration, to provide a new 138-kV Point of Interconnection to Staccato Storage.
ERCOT project 111495
LCRATSC
Tier 4
Planned
Current-year planned tab
138 Oct 2026 Warda
Fayette County
Warda

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 2026111495First listedon the Current-year planned tab
July 13, 2026109888First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.